The Better Mouse Trap Co. / sample paperwork

Basic — What the prototype needs to prove

BasicRevision C12026-10-24Planning draft18 entries
Basic — What the prototype needs to proveBMT-BASIC-CHECK-SHEET-PROTOTYPE-001 · Rev C1
Company
The Better Mouse Trap Co.
Project / product line
Basic trap
Document
Basic — What the prototype needs to prove
Document no.
BMT-BASIC-CHECK-SHEET-PROTOTYPE-001
Revision
C1
Status
Planning draft
Start date
2026-10-24
Revision date
2026-10-24
Prepared by / owner
Sam Reed, mechanical, BASIC-C1
Checklist ID
BMT-BASIC-CHECK-SHEET-PROTOTYPE-001, Rev C1
Scope
BASIC-C1 door, vents, release, wash, bait pocket, and occupancy window.
Reviewer
Casey Holt
Review date
2026-11-01
Team
Alex Meadow, packet owner; Sam Reed, mechanical lead; Robin Keel, animal-welfare reviewer; Ira Bell, Bell Sample Lab (test lab)
Approved by
review pending. Alex Meadow, Planning draft C1, unsigned.
Basic — What the Prototype Needs to Prove
Item / review questionAnswer / findingResult / statusEvidenceResponsibility / action

Item ID: PROTOTYPE-01

Question: Which question is this prototype answering?

Answer / assumption: First question is the capture door only. CTQ01 / R01 / DF01, proposed RPN 210 (severity 7, occurrence 5, detection 6): the door stays latched through 100 dry capture cycles on each of 10 concept units, then a 5 N outward retention pull (BMT-BASIC-TEST-MATRIX-001 Rev C1, T01). The same units are planned so T02 through T06 can be run later. The full unrun set on the matrix is T01 through T14. This build cannot demonstrate a live capture, a bite-exposure rate, child resistance, production capability, or the $24.00 hold price. No unit has been built. BMT-BASIC-TEMPLATE-TEST-RESULTS-001 Rev C1 records T01 as Not run.

Explanation: T01 is the only question this build is allowed to answer first. No pass is on file. DF01 RPN 210 is a proposed rating.

Result (Y/N/NA): Y

Status: Recorded — first question named, untested

BMT-BASIC-TEST-MATRIX-001 Rev C1 T01; BMT-BASIC-DFMEA-001 Rev C1 DF01 RPN 210; BMT-BASIC-CONCEPT-DRAWING-001 Rev C1; 2026-10-24; no external evidence;

Owner: Sam Reed

Next action: Write the T01 method card and cycle-rig sketch before any unit is cut; target 2026-12-15

Reviewer / review date: Pending. Casey Holt, planned 2026-11-01. First question is recorded as C1 intent and is not accepted.

Item ID: PROTOTYPE-02

Question: What is the exact configuration?

Answer / assumption: Basic C1 mechanical catch-and-release trap for one mouse, manual check and manual release. No disease-control claim, no child use, no export launch (PROJECT-02). BMT-BASIC-BOM-001 Rev C1: BASIC-01 shell/window, BASIC-02 door and latch, BASIC-03 trigger/hinge, BASIC-04 captive bait pocket, BASIC-05 assembly inspection, BASIC-06 carton and instructions. Ten surrogate IDs are reserved as BASIC-X1-001 through BASIC-X1-010. No electronics and no software rig. No units exist. Eighteen dated bids are on file and none is awarded: Fictional Sample Works (Perry Voss, 2026-09-12, valid through 2026-12-11), Fictional Meadow Prototype Shop (Willa Marsh, 2026-09-16, valid through 2026-11-15), and Fictional Northline Molding (Eden Crowe, 2026-09-28, valid through 2026-12-27), parts BASIC-01 through BASIC-06. The C1 bill is 19 rows, assembly BASIC-C1-ASSY plus BASIC-01 through BASIC-16. A machined or printed door cassette is an allowed deviation only if the unit card records it. BMT-BASIC-TEMPLATE-COST-SHEET-001 Rev C1 running total is $5.78, a worksheet assumption, not a quote.

Explanation: The configuration is the 19-row BMT-BASIC-BOM-001 Rev C1, and no unit is built. Eighteen bids are on file and none is awarded. A machined or printed door is a recorded deviation, not a production part.

Result (Y/N/NA): Y

Status: Recorded — configuration listed, none built

BMT-BASIC-BOM-001 Rev C1, 19 rows, BASIC-C1-ASSY and BASIC-01 through BASIC-16; quoted subset BASIC-01 through BASIC-06; BMT-BASIC-TEMPLATE-COST-SHEET-001 Rev C1 running total

Owner: Sam Reed

Next action: Reserve unit-card templates BASIC-X1-001 through BASIC-X1-010 and list allowed deviations; do not award a bid or issue a purchase order until Alex Meadow consents; target 2026-12-15

Reviewer / review date: Pending. Casey Holt, planned 2026-11-01. Configuration matches the C1 bill.

Item ID: PROTOTYPE-03

Question: How will we judge success before testing?

Answer / assumption: Criteria are already written in BMT-BASIC-TEST-MATRIX-001 Rev C1 and are review pending. T01 / CTQ01 / DF01 RPN 210: latched through 100 dry cycles and a 5 N pull, n=10. T02 / CTQ02 / DF02 RPN 252: at least two independent raised vent paths stay unobstructed in a bedding-surrogate trial. T03 / CTQ03 / DF03 RPN 192: release grip keeps fingers 30 mm from the door path; 10 adult users complete the unloaded task with no path contact. T04 / CTQ04 / DF04 RPN 240: shell opens without tools; no visible fluorescent soil after the defined wash, n=10; biological efficacy is not claimed. T05 / CTQ05 / DF05 RPN 162: bait insert remains captive after a 20 N pull, n=10. T06 / CTQ06 / DF06 RPN 432: the user can see occupancy without opening; the check interval is not set here and waits on a welfare reviewer. The count is a concept screen, sample. Environment is an indoor bench, clean/dry baseline, then the dirty/worn repeat the matrix names. T07 through T14 and CTQ07 through CTQ14 are on the same matrix, unapproved, and Not run. DFMEA C1 is DF01 through DF18. Residual RPN total is 1579. The 80% review line is 1263.2. Accepted residual is 0.

Explanation: The six written acceptance lines are targets and are not the full set. T07 through T14 are also unapproved. Nobody has initialed them, so a run against them would not count.

Result (Y/N/NA): N

Status: Open — acceptance lines not initialed

BMT-BASIC-TEST-MATRIX-001 Rev C1 T01-T14; BMT-BASIC-CRITICAL-QUALITY-001 Rev C1 CTQ01-CTQ14; BMT-BASIC-CONCEPT-DRAWING-001 Rev C1; 2026-10-24; limits review pending

Owner: Sam Reed

Next action: Sam Reed and the specialist initial the T01 through T14 acceptance lines before the first cycle; target 2026-12-15

Reviewer / review date: Pending. Casey Holt, planned 2026-11-01. Limits are copied and not initialed.

Item ID: PROTOTYPE-04

Question: Is the test safe and representative?

Answer / assumption: Surrogates first. No live-animal protocol is requested or approved for this gate. Outdoor flight does not apply to Basic and is not a stand-in for any test. Pinch hazard DF03, severity 8, is limited to an unloaded adult task, a 30 mm keep-out, and a stop if a hand enters the door path. Fluorescent soil on T04 is a visibility check. A force gauge and video are required; the gauge check is recorded the day of the run. Operator is Sam Reed. An independent specialist reviews the T03 pinch setup and the T06 welfare setup before those runs. Children, pets as users, and unattended multi-day holds are outside the setup. Stop on unexpected motion, a loose part, or a departed method. Restart is written on the unit card.

Explanation: Bench limits are written. No specialist has signed the pinch setup or the welfare setup, so the test is not cleared to start.

Result (Y/N/NA): N

Status: Open — safeguards not signed

BMT-BASIC-DFMEA-001 Rev C1 DF03 severity 8; DF06 RPN 432; BMT-BASIC-CONCEPT-DRAWING-001 Rev C1; 2026-10-24; no live-animal protocol; no specialist appointed

Owner: Sam Reed

Next action: Write the stop and restart card for T01 through T14; specialist review of T03 and T06 before any user is scheduled; target 2026-12-15

Reviewer / review date: Pending. Casey Holt, planned 2026-11-01. Safeguards are written and not signed.

Item ID: PROTOTYPE-05

Question: What happened, including failures?

Answer / assumption: Nothing has been run. BMT-BASIC-TEMPLATE-TEST-RESULTS-001 Rev C1 lists T01 through T14 as Not run, turn 0. No force readings, no cycle counts, no photos, no anomalies, and no passes. A CAD sketch is not a result. Projected lines DF01 84, DF02 90, DF03 64, DF04 96, DF05 36, and DF06 216 stay in the prediction column. They are not the residual total. The residual RPN total is 1579. The 80% review line is 1263.2. Accepted residual is 0. The highest projected line is DF06-M occupancy at 216. The result file is not to be edited to a pass to support the 2027-01-31 funding review.

Explanation: There is no measurement to file. A sketch and a projected RPN stay out of the result record.

Result (Y/N/NA): N

Status: Blocked — no run on file

BMT-BASIC-TEMPLATE-TEST-RESULTS-001 Rev C1 T01-T14 Not run; BMT-BASIC-DFMEA-001 Rev C1 projected RPN column; 2026-10-24; no raw sheet

Owner: Sam Reed

Next action: Leave BMT-BASIC-TEMPLATE-TEST-RESULTS-001 Rev C1 at Not run until a dated raw sheet exists for that test ID; target 2026-12-15

Reviewer / review date: Pending. Casey Holt, planned 2026-11-01. No raw sheet is on file.

Item ID: PROTOTYPE-06

Question: What can we conclude, and what remains unproven?

Answer / assumption: Only planning completeness can be assessed for the prototype. Verification of R01 through R06 has not started, and tests T07 through T14 are also Not run. Market evidence is already filed and is not a prototype pass. BMT-BASIC-TEMPLATE-MARKET-EVIDENCE-001, recorded by Alex Meadow, holds 16 panels dated 2026-08-04 through 2026-10-22. Grade B problem interviews are 7 of 20 (short 13): ME-B-01 Quinn Harlow on 2026-08-04, ME-B-02 Blake Fen on 2026-08-11, ME-B-03 Sable Orth on 2026-08-18, ME-B-04 Ned Carrow on 2026-08-25, ME-B-05 June Talbot on 2026-09-01, ME-B-06 Cole Brant on 2026-09-08, and ME-B-15 Nora Bent on 2026-10-20. The gate counts Grade B only. Six price choices are filed: ME-B-08 Owen Pike chose $24.00 on 2026-09-22; ME-B-09 Lila Kent chose $18.00 on 2026-09-29; ME-B-10 Maren Cho chose $20.40 on 2026-10-06 and then neither card after the $4.00 parcel; ME-B-11 Ada Quinn put Not applicable — no transaction in this planning record on prepay on 2026-10-08; ME-B-12 Hugh Lanier chose 12 at $13.20 on 2026-10-13; ME-B-16 Pam Ellison chose an outside $8.99 pack on 2026-10-22. ME-B-14 Ivo Grant is Grade A wording with no price. Cash collected is Not applicable — no transaction in this planning record. Purchase orders are 0. Letters of intent are 0. Panels are not orders. Ten further blinded tests are planned, and the written protocol is not issued. The $2,000.00 market-research line is unspent. A built trap has not shown that an adult will check and release it. Still unproven on the hardware: live capture, escape rate, wash hygiene beyond the fluorescent check, child or pet misuse beyond the 20 N pull, production repeatability, and a demand conclusion at the $24.00 hold price. One filed choice of $24.00 does not close that question. Sam Reed owns a failed characteristic. A fail requires the linked DFMEA action, or a documented alternative, and a full retest of that test ID before G1 can be recommended. G0 through G5 are pending. G2 user/welfare, G3 freeze, G4 pilot, and G5 launch have no sign-off (PROJECT-06). This sheet does not authorize tooling. Residual RPN total is 1579. The 80% review line is 1263.2. Accepted residual is 0.

Explanation: Prototype verification has not started. Seven Grade B interviews and six price choices are filed and are not orders. Demand at $24.00 is not concluded. G0 through G5 have no sign-off, and this sheet does not buy a tool.

Result (Y/N/NA): N

Status: Blocked — evidence not established

BMT-BASIC-MARKET-CHECK-001 Rev C1 and BMT-BASIC-TEMPLATE-MARKET-EVIDENCE-001 Rev C1, 16 panels, 7 of 20 Grade B, 6 price choices; BMT-BASIC-CHECK-SHEET-PROJECT-001 Rev C1

Owner: Sam Reed

Next action: Do not enter a pass, a release claim, or a tooling request from this sheet; target 2026-12-15

Reviewer / review date: Pending. Casey Holt, planned 2026-11-01. No performance conclusion is available.

Item ID: PROTOTYPE-07

Question: Which characteristics must this prototype prove, and which are deferred?

Answer / assumption: In scope: CTQ01 capture door (T01; production control CP01 does not replace the lab run), CTQ02 ventilation (T02), CTQ03 release slider (T03), CTQ04 washable shell (T04), CTQ05 bait pocket (T05), CTQ06 occupancy inspection (T06). The company milestone for 2027-01-31 asks for a private latch and ventilation review, so T01 and T02 are the minimum pair. T03 through T06 stay on this prototype because DFMEA severities are 8 or 9. Deferred: production tooling (the $12,000.00 on the 2027-03 cash row is an illustration, not a purchase order), retail drop test, channel acceptance, IP filing, disease-control language, Hotel, and Drone. BMT-BASIC-CONTROL-PLAN-001 Rev C1 rows CP01 through CP16 are not executed by these surrogates. CP01 is the latch control and its shop step is P05. The full untested set is T01 through T14 and CTQ01 through CTQ14. T01 through T06 is a short index of that set.

Explanation: T01 and T02 are the minimum pair for the 2027-01-31 private review. T03 through T06 stay on the same plan because the severities are 8 or 9.

Result (Y/N/NA): Y

Status: Recorded — scope list written

BMT-BASIC-CRITICAL-QUALITY-001 Rev C1 CTQ01-CTQ14; BMT-BASIC-CONTROL-PLAN-001 Rev C1 CP01-CP16 not executed; shop step for CP01 is P05; company milestone 2027-01-31; 2026-10-24

Owner: Sam Reed

Next action: Mark T01 and T02 as the 2027-01-31 minimum and keep T03 through T06 on the same build plan; target 2026-12-15

Reviewer / review date: Pending. Casey Holt, planned 2026-11-01. The in-scope list is recorded as intent and is not accepted.

Item ID: PROTOTYPE-08

Question: What is the sample size rationale and how is each unit identified?

Answer / assumption: n=10 is the screening count written on CTQ01 and T01. It is not a reliability demonstration and not a process-capability study. IDs BASIC-X1-001 through BASIC-X1-010, one card each, tied to BMT-BASIC-BOM-001 Rev C1 and any deviation. Order on the same units: T01 cycles, then T05 pull, then T04 wash, so the pocket and the shell see a cycled door. T02 may use the same units if the vent geometry is unchanged. T03 and T06 are adult-user tasks and run only on units that still meet the T01 latch line. A damaged unit is retired and the gap is recorded; it is not replaced without a new ID. No ID is assigned yet because nothing has been built.

Explanation: n=10 is a screen, not a capability study. BASIC-X1-001 through BASIC-X1-010 are reserved and are not issued.

Result (Y/N/NA): N

Status: Open — serials reserved, none issued

BMT-BASIC-TEST-MATRIX-001 Rev C1 sample note n=10; BMT-BASIC-CONCEPT-DRAWING-001 Rev C1; 2026-10-24; unit cards not issued

Owner: Sam Reed

Next action: Prepare the unit-card template; assign no ID until a unit exists; target 2026-12-15

Reviewer / review date: Pending. Casey Holt, planned 2026-11-01. Serials are reserved and not issued.

Item ID: PROTOTYPE-09

Question: What build method differs from the intended production part?

Answer / assumption: Production intent is a molded PP shell (BASIC-01) and a molded captive pocket (BASIC-04). The prototype may be machined or printed. Latch geometry, opposing vent locations, the 30 mm release keep-out, the inspection window, and the captive pocket interface must match BMT-BASIC-CONCEPT-DRAWING-001 Rev C1. A printed unit cannot support a claim about mold shrinkage, knit lines, the $5.78 BMT-BASIC-TEMPLATE-COST-SHEET-001 Rev C1 total, or the BASIC-05 assembly line. Willa Marsh (Fictional Meadow Prototype Shop) is the quote contact on the bench bid, Perry Voss (Fictional Sample Works) is the quote contact on the production bid, and Eden Crowe (Fictional Northline Molding) is the third quote contact. Those 18 bids are on file, unawarded, and no purchase order exists.

Explanation: Latch, vents, the 30 mm keep-out, the window, and the pocket must match C1. Mold shrinkage and the unit-cost total are outside a printed build.

Result (Y/N/NA): Y

Status: Recorded — deviation rule written

BMT-BASIC-BOM-001 Rev C1 BASIC-01 and BASIC-04; BMT-BASIC-TEMPLATE-COST-SHEET-001 Rev C1; 2026-10-24; 18 unawarded bids on file; no purchase order

Owner: Sam Reed

Next action: Record molded-versus-printed as an open deviation rule on the unit-card template; target 2026-12-15

Reviewer / review date: Pending. Casey Holt, planned 2026-11-01. The deviation rule is recorded as intent and is not accepted.

Item ID: PROTOTYPE-10

Question: What equipment and calibration are required before a run counts?

Answer / assumption: A force gauge for the 5 N retention pull and the 20 N bait pull, with the calibration check recorded that day. An uncalibrated gauge voids the run. Video for T03. Fluorescent soil and a written wash setup for T04. No biological lab, because none is claimed. No temperature logger and no HIL harness on Basic. The cycle rig for T01 sits in the prototype line. Gauge costs sit in the $4,000.00 tests-and-welfare line; cycle-rig costs sit in the company-book prototype line of $5,000.00, which Alex Meadow has not released.00, tests and welfare $4,000.00, market research $2,000.00, design $2,000.00, and unallocated reserve $2,000.00. The tests-and-welfare line is $4,000.00. Nothing is drawn. The $12,000.00 BASIC-01 shell-and-window allowance stays outside the cap and is not a bid.

Explanation: An uncalibrated gauge voids the run. The gauge sits in the unreleased tests-and-welfare line; the cycle rig sits in the prototype line.

Result (Y/N/NA): N

Status: Open — instruments not released

BMT-BASIC-TEST-MATRIX-001 Rev C1 equipment line; adopted five-line cap; tests and welfare $4,000.00; 2026-10-24; $5,000.00 prototype line unreleased

Owner: Sam Reed

Next action: Place the gauge inside the unreleased $4,000.00 tests-and-welfare line and the cycle rig inside the $5,000.00 prototype line; do not buy them on this date; target 2026-12-15

Reviewer / review date: Pending. Casey Holt, planned 2026-11-01. No instrument spend is released.

Item ID: PROTOTYPE-11

Question: What cost is authorized for this prototype, and what is excluded?

Answer / assumption: Nothing has been deposited or committed. Adopted company books: prototype $5,000.00; tests and welfare review $4,000.00; market research $2,000.00; design $2,000.00; unallocated reserve $2,000.00. Founder pay is excluded. The 20-interview gate sits in the unspent $2,000.00 market line and is not a prototype test. Grade B interviews on file are 7 of 20. Six price choices are filed. Cash collected is Not applicable — no transaction in this planning record. Production tooling is outside the cap. Hold price $24.00. The year-1 figure of 3,000 units is a hypothesis, not a build quantity; BMT-BASIC-TEMPLATE-COST-SHEET-001 Rev C1 also carries 1,500 / 3,000 / 6,000 as sensitivities. Each release needs a written consent from Alex Meadow naming the line. Paid this year is Not applicable — no transaction in this planning record. Debt is Not applicable — no transaction in this planning record. Hotel $60,000.00 and Drone $250,000.00 allowances are outside this cap and are not secured.

Explanation: The cap is a limit, not a deposit. Paid this year is Not applicable — no transaction in this planning record. The Hotel and Drone allowances are outside this row.

Result (Y/N/NA): N

Status: Blocked — allowance not consented

00

Owner: Alex Meadow

Next action: Request a line-named consent from Alex Meadow only after the method cards exist; no spend is authorized on 2026-10-24; target 2026-12-15

Reviewer / review date: Pending. Casey Holt, planned 2026-11-01. No allowance is consented.

Item ID: PROTOTYPE-12

Question: What are the stop rules, and who may restart?

Answer / assumption: Sam Reed stops a run if the door pinches a surrogate or a hand, if a part leaves the assembly under the 20 N pull, if a user cannot see occupancy, if the gauge check is missing, or if the method is departed from. Restart for T01, T02, T04, and T05 is Sam Reed, written on the unit card. Restart for T03 and T06 also requires the independent specialist. No live mouse, no child subject, no pet exposure. The welfare check interval is not set on this sheet. Risk B01 (welfare protocol inside the $4,000.00 tests line, Alex Meadow, due 2026-12-15) is open. Action A02 (animal-release review, Sam Reed, due 2026-12-01) is open and is not closed by a dry cycle.

Explanation: Sam Reed can stop a bench run. Restart of T03 and T06 also needs the specialist, who is not appointed. The welfare interval is unset.

Result (Y/N/NA): N

Status: Open — stop card not attached

BMT-BASIC-DFMEA-001 Rev C1 DF03 and DF06; BMT-COMPANY-TEMPLATE-BUSINESS-RISKS-001 risk B01 due 2026-12-15; action A02 due 2026-12-01; both open

Owner: Sam Reed

Next action: Attach the stop card to the T03 and T06 method cards; leave the welfare interval unset; target 2026-12-15

Reviewer / review date: Pending. Casey Holt, planned 2026-11-01. The stop card is not on the method cards.

Item ID: PROTOTYPE-13

Question: How will measured, simulated, and predicted results be separated?

Answer / assumption: Measured means a gauge number, a cycle count, a video, or a soil photo on a named unit ID, filed against that test ID. Simulated means a paper, CAD, or fixture check and is labeled simulated; it cannot close T01. Predicted means the DFMEA projected RPN column and is not evidence. BMT-BASIC-TEMPLATE-TEST-RESULTS-001 Rev C1 stays Not run until a measured row exists. A sentence on this sheet is not a measurement. The 2027-01-31 review may accept this plan. It may not treat the plan as a pass.

Explanation: A sentence on this sheet is not a measurement. The 2027-01-31 review may accept the plan. It may not treat the plan as a pass.

Result (Y/N/NA): Y

Status: Recorded — evidence classes defined

BMT-BASIC-TEMPLATE-TEST-RESULTS-001 Rev C1; BMT-BASIC-DFMEA-001 Rev C1 projected residual column; 2026-10-24; no measured row

Owner: Sam Reed

Next action: Add a measured, simulated, or predicted label to the result template before the first run; target 2026-12-15

Reviewer / review date: Pending. Casey Holt, planned 2026-11-01. Measured, simulated, and predicted are separated.

Item ID: PROTOTYPE-14

Question: Who owns a failed proof, and what retest is required?

Answer / assumption: Sam Reed owns every failed Basic characteristic. Alex Meadow owns the budget consent and does not close a technical fail. A T01 fail blocks the latch half of the 2027-01-31 milestone and requires the DF01 action (positive over-center latch and keyed hinge pin), or a written alternative, then a new 100-cycle run and 5 N pull on 10 units, not one confirmatory cycle. A T02 fail blocks the ventilation half of that milestone. A T06 fail blocks any instruction line that says the user can see occupancy. Retest uses new or fully reidentified units if the hardware changed. No gate has a sign-off.

Explanation: Alex Meadow does not close a technical fail by releasing money. A T01 fail repeats the full 100-cycle count on 10 units.

Result (Y/N/NA): Y

Status: Recorded — fail owner named

BMT-BASIC-DFMEA-001 Rev C1 DF01 action, positive over-center latch and keyed hinge pin; owner Sam Reed; due 2026-12-15; not implemented

Owner: Sam Reed

Next action: Name Sam Reed on the fail-and-retest line of each method card; target 2026-12-15

Reviewer / review date: Pending. Casey Holt, planned 2026-11-01. The fail owner is named.

Item ID: PROTOTYPE-15

Question: Which gate can this packet support, and which gates stay shut?

Answer / assumption: A complete reviewed packet can support a private recommendation toward G1 mechanism only. G0 is the current gate, planned 2027-01-28, and has not occurred. G2 user/welfare stays shut until T03 and T06 have measured results and a welfare reviewer sets the check interval. G3 design freeze, G4 pilot, and G5 launch stay shut. The $20,000.00 cash-reserve floor is a company constraint on any later release and is not tested by this prototype. Evidence target is 2026-12-15, ahead of the 2027-01-31 internal review. The 2026-11-15 meeting named for Alex Meadow, Sam Reed, and Jordan Vale has not been held.

Explanation: The packet can later support a private G1 recommendation only. The 2026-11-15 meeting has not been held.

Result (Y/N/NA): Y

Status: Recorded — later gates stay shut

BMT-BASIC-CHECK-SHEET-PROJECT-001 Rev C1 PROJECT-06 gates G0-G5; BMT-COMPANY-TEMPLATE-MEETING-001 dated 2026-11-15 not held; reserve floor $20,000.00

Owner: Sam Reed

Next action: Keep any later recommendation limited to G1; do not open G2 through G5 on this sheet; target 2026-12-15

Reviewer / review date: Pending. Casey Holt, planned 2026-11-01. G2 through G5 stay shut.

Item ID: PROTOTYPE-16

Question: What must be in the evidence package before the review date?

Answer / assumption: Before a reviewer is named, the package needs: this sheet at C1; BMT-BASIC-BOM-001 Rev C1; DFMEA C1 with DF01 through DF18 (18 data rows); BMT-BASIC-TEST-MATRIX-001 Rev C1 acceptance lines for T01 through T14; a method card per test; unit cards BASIC-X1-001 through BASIC-X1-010 or an explicit not-built log; a calibration note or a statement that no run occurred; BMT-BASIC-TEMPLATE-TEST-RESULTS-001 Rev C1 still showing Not run, or a measured replacement; and the consent status of the $5,000.00 prototype line (not released on 2026-10-24). If any item is missing, the review answer is not ready. A Casey Holt read is planned for 2026-11-01 and has not been held as of 2026-10-28. That planned read is not a close while any package item is missing.

Explanation: A missing file means the review is not ready. The planned 2026-11-01 read has not been held and does not close the package.

Result (Y/N/NA): N

Status: Open — package incomplete

BMT-BASIC-CHECK-SHEET-PROTOTYPE-001 Rev C1; ; BMT-BASIC-CONCEPT-DRAWING-001 Rev C1; market panels are on the evidence log and are not this package; package list for T01-T14;

Owner: Sam Reed

Next action: Assemble the package list. Do not close the package on the planned 2026-11-01 read, which has not been held, until every file is present; target 2026-12-15

Reviewer / review date: Pending. Casey Holt, planned 2026-11-01. The package list is incomplete.

Item ID: PROTOTYPE-17

Question: What user and misuse conditions is the prototype required to represent?

Answer / assumption: The intended user and buyer on PROJECT-01 is an adult homeowner. Seven Grade B problem interviews (7 of 20) and six price choices are on file. They do not check a built trap. The prototype represents an indoor bench, one-mouse volume, a dry then dirty/worn condition where the matrix requires it, and an adult hand at the release. Misuse in scope is the 20 N pull on the bait pocket and a hand near the slider. Out of scope: children, pets as users, outdoor weather, multi-catch, unattended multi-day holding, and any pesticide or disease claim. Morgan Hale (hardware pilot, store not selected) has not been contacted. Channel acceptance is not this prototype.

Explanation: The user on the project sheet is an adult homeowner. Seven Grade B interviews and six price choices are filed and do not replace a built-unit check. Children, pets as users, and channel acceptance are outside this build.

Result (Y/N/NA): Y

Status: Recorded — user boundary written

BMT-BASIC-CHECK-SHEET-PROJECT-001 Rev C1 PROJECT-01 and PROJECT-02; 2026-10-24; Morgan Hale not contacted

Owner: Sam Reed

Next action: State the adult, indoor, one-mouse boundary on the method cards; do not recruit children; target 2026-12-15

Reviewer / review date: Pending. Casey Holt, planned 2026-11-01. The user boundary is recorded as intent and is not accepted.

Item ID: PROTOTYPE-18

Question: What would make the prototype effort stop rather than revise?

Answer / assumption: Stop further Basic prototype spend, rather than revise again inside the cap, if the door still fails 100 dry cycles after one redesign, or if both vent paths cannot stay open in the bedding surrogate, and the remaining prototype plus tests lines cannot fund a second rebuild. A stop is a proposal to Alex Meadow. It is not declared on 2026-10-24, because no build has started. Do not move unspent Basic lines into Hotel or Drone hardware.

Explanation: One failed redesign of the door, or both vent paths blocked, with no remaining prototype line, is a stop proposal. It is not declared on 2026-10-24.

Result (Y/N/NA): Y

Status: Recorded — stop rule written, not declared

BMT-COMPANY-TEMPLATE-FUNDING-001 Rev C1, cap not increased if the 2027-01-31 review is missed; 2026-10-24; no stop declared

Owner: Alex Meadow

Next action: Write the one-redesign stop rule into the budget note for Alex Meadow; do not declare a stop; target 2026-12-15

Reviewer / review date: Pending. Casey Holt, planned 2026-11-01. The stop rule is not a declared stop.

Basic — What the Prototype Needs to Prove — supporting detail

Basic — Which question is this prototype answering?

Project. Basic

Product revision. C1

Sheet revision. 1

Prepared by. Sam Reed

Date. 2026-10-24

Target market / jurisdiction. U.S. adults; Wisconsin illustrative base

Decision being prepared. Next private feasibility gate

Sheet. What the Prototype Needs to Prove

Lead. Sam Reed

Item ID. PROTOTYPE-01

Question. Which question is this prototype answering?

Evidence to record. Appearance, usability, fit, mechanism, strength, life, process or customer acceptance; list what it cannot demonstrate.

Answer / assumption. First question is the capture door only. CTQ01 / R01 / DF01, proposed RPN 210 (severity 7, occurrence 5, detection 6): the door stays latched through 100 dry capture cycles on each of 10 concept units, then a 5 N outward retention pull (BMT-BASIC-TEST-MATRIX-001 Rev C1, T01). The same units are planned so T02 through T06 can be run later. The full unrun set on the matrix is T01 through T14. This build cannot demonstrate a live capture, a bite-exposure rate, child resistance, production capability, or the $24.00 hold price. No unit has been built. BMT-BASIC-TEMPLATE-TEST-RESULTS-001 Rev C1 records T01 as Not run.

Result (Y/N/NA). Y

Explanation. T01 is the only question this build is allowed to answer first. No pass is on file. DF01 RPN 210 is a proposed rating.

Status. Recorded — first question named, untested

Evidence / exact revision / URL and date. BMT-BASIC-TEST-MATRIX-001 Rev C1 T01; BMT-BASIC-DFMEA-001 Rev C1 DF01 RPN 210; BMT-BASIC-CONCEPT-DRAWING-001 Rev C1; 2026-10-24; no external evidence; BMT-BASIC-TEMPLATE-TEST-RESULTS-001 Rev C1 Not run

Owner. Sam Reed

Next action. Write the T01 method card and cycle-rig sketch before any unit is cut; target 2026-12-15

Reviewer / review date. Pending. Casey Holt, planned 2026-11-01. First question is recorded as C1 intent and is not accepted.

Not-applicable reason. Applicable

Source guidance URLs. BMT-BASIC-TEST-MATRIX-001 Rev C1; BMT-BASIC-DFMEA-001 Rev C1; BMT-BASIC-CONCEPT-DRAWING-001 Rev C1; BMT-BASIC-TEMPLATE-TEST-RESULTS-001 Rev C1

Basic — What is the exact configuration?

Project. Basic

Product revision. C1

Sheet revision. 1

Prepared by. Sam Reed

Date. 2026-10-24

Target market / jurisdiction. U.S. adults; Wisconsin illustrative base

Decision being prepared. Next private feasibility gate

Sheet. What the Prototype Needs to Prove

Lead. Sam Reed

Item ID. PROTOTYPE-02

Question. What is the exact configuration?

Evidence to record. Model/drawing/BOM revision, materials, deviations from production, build method and sample identifiers.

Answer / assumption. Basic C1 mechanical catch-and-release trap for one mouse, manual check and manual release. No disease-control claim, no child use, no export launch (PROJECT-02). BMT-BASIC-BOM-001 Rev C1: BASIC-01 shell/window, BASIC-02 door and latch, BASIC-03 trigger/hinge, BASIC-04 captive bait pocket, BASIC-05 assembly inspection, BASIC-06 carton and instructions. Ten surrogate IDs are reserved as BASIC-X1-001 through BASIC-X1-010. No electronics and no software rig. No units exist. Eighteen dated bids are on file and none is awarded: Fictional Sample Works (Perry Voss, 2026-09-12, valid through 2026-12-11), Fictional Meadow Prototype Shop (Willa Marsh, 2026-09-16, valid through 2026-11-15), and Fictional Northline Molding (Eden Crowe, 2026-09-28, valid through 2026-12-27), parts BASIC-01 through BASIC-06. The C1 bill is 19 rows, assembly BASIC-C1-ASSY plus BASIC-01 through BASIC-16. A machined or printed door cassette is an allowed deviation only if the unit card records it. BMT-BASIC-TEMPLATE-COST-SHEET-001 Rev C1 running total is $5.78, a worksheet assumption, not a quote.

Result (Y/N/NA). Y

Explanation. The configuration is the 19-row BMT-BASIC-BOM-001 Rev C1, and no unit is built. Eighteen bids are on file and none is awarded. A machined or printed door is a recorded deviation, not a production part.

Status. Recorded — configuration listed, none built

Evidence / exact revision / URL and date. BMT-BASIC-BOM-001 Rev C1, 19 rows, BASIC-C1-ASSY and BASIC-01 through BASIC-16; quoted subset BASIC-01 through BASIC-06; BMT-BASIC-TEMPLATE-COST-SHEET-001 Rev C1 running total $5.78; BMT-BASIC-CONCEPT-DRAWING-001 Rev C1; 2026-10-24; 18 unawarded bids on file; no purchase order

Owner. Sam Reed

Next action. Reserve unit-card templates BASIC-X1-001 through BASIC-X1-010 and list allowed deviations; do not award a bid or issue a purchase order until Alex Meadow consents; target 2026-12-15

Reviewer / review date. Pending. Casey Holt, planned 2026-11-01. Configuration matches the C1 bill.

Not-applicable reason. Applicable

Source guidance URLs. BMT-BASIC-BOM-001 Rev C1; BMT-BASIC-TEMPLATE-COST-SHEET-001 Rev C1; BMT-BASIC-CONCEPT-DRAWING-001 Rev C1

Basic — How will we judge success before testing?

Project. Basic

Product revision. C1

Sheet revision. 1

Prepared by. Sam Reed

Date. 2026-10-24

Target market / jurisdiction. U.S. adults; Wisconsin illustrative base

Decision being prepared. Next private feasibility gate

Sheet. What the Prototype Needs to Prove

Lead. Sam Reed

Item ID. PROTOTYPE-03

Question. How will we judge success before testing?

Evidence to record. Requirement ID, method, numerical/observable acceptance criterion, environment, equipment, calibration where needed and planned sample size rationale.

Answer / assumption. Criteria are already written in BMT-BASIC-TEST-MATRIX-001 Rev C1 and are review pending. T01 / CTQ01 / DF01 RPN 210: latched through 100 dry cycles and a 5 N pull, n=10. T02 / CTQ02 / DF02 RPN 252: at least two independent raised vent paths stay unobstructed in a bedding-surrogate trial. T03 / CTQ03 / DF03 RPN 192: release grip keeps fingers 30 mm from the door path; 10 adult users complete the unloaded task with no path contact. T04 / CTQ04 / DF04 RPN 240: shell opens without tools; no visible fluorescent soil after the defined wash, n=10; biological efficacy is not claimed. T05 / CTQ05 / DF05 RPN 162: bait insert remains captive after a 20 N pull, n=10. T06 / CTQ06 / DF06 RPN 432: the user can see occupancy without opening; the check interval is not set here and waits on a welfare reviewer. The count is a concept screen, sample. Environment is an indoor bench, clean/dry baseline, then the dirty/worn repeat the matrix names. T07 through T14 and CTQ07 through CTQ14 are on the same matrix, unapproved, and Not run. DFMEA C1 is DF01 through DF18. Residual RPN total is 1579. The 80% review line is 1263.2. Accepted residual is 0.

Result (Y/N/NA). N

Explanation. The six written acceptance lines are targets and are not the full set. T07 through T14 are also unapproved. Nobody has initialed them, so a run against them would not count.

Status. Open — acceptance lines not initialed

Evidence / exact revision / URL and date. BMT-BASIC-TEST-MATRIX-001 Rev C1 T01-T14; BMT-BASIC-CRITICAL-QUALITY-001 Rev C1 CTQ01-CTQ14; BMT-BASIC-CONCEPT-DRAWING-001 Rev C1; 2026-10-24; limits review pending

Owner. Sam Reed

Next action. Sam Reed and the specialist initial the T01 through T14 acceptance lines before the first cycle; target 2026-12-15

Reviewer / review date. Pending. Casey Holt, planned 2026-11-01. Limits are copied and not initialed.

Not-applicable reason. Applicable

Source guidance URLs. BMT-BASIC-TEST-MATRIX-001 Rev C1; BMT-BASIC-CRITICAL-QUALITY-001 Rev C1; BMT-BASIC-CONCEPT-DRAWING-001 Rev C1

Basic — Is the test safe and representative?

Project. Basic

Product revision. C1

Sheet revision. 1

Prepared by. Sam Reed

Date. 2026-10-24

Target market / jurisdiction. U.S. adults; Wisconsin illustrative base

Decision being prepared. Next private feasibility gate

Sheet. What the Prototype Needs to Prove

Lead. Sam Reed

Item ID. PROTOTYPE-04

Question. Is the test safe and representative?

Evidence to record. Foreseeable hazards, setup limits, operator competence, exposure safeguards, realistic users/conditions and specialist or lab involvement where needed.

Answer / assumption. Surrogates first. No live-animal protocol is requested or approved for this gate. Outdoor flight does not apply to Basic and is not a stand-in for any test. Pinch hazard DF03, severity 8, is limited to an unloaded adult task, a 30 mm keep-out, and a stop if a hand enters the door path. Fluorescent soil on T04 is a visibility check. A force gauge and video are required; the gauge check is recorded the day of the run. Operator is Sam Reed. An independent specialist reviews the T03 pinch setup and the T06 welfare setup before those runs. Children, pets as users, and unattended multi-day holds are outside the setup. Stop on unexpected motion, a loose part, or a departed method. Restart is written on the unit card.

Result (Y/N/NA). N

Explanation. Bench limits are written. No specialist has signed the pinch setup or the welfare setup, so the test is not cleared to start.

Status. Open — safeguards not signed

Evidence / exact revision / URL and date. BMT-BASIC-DFMEA-001 Rev C1 DF03 severity 8; DF06 RPN 432; BMT-BASIC-CONCEPT-DRAWING-001 Rev C1; 2026-10-24; no live-animal protocol; no specialist appointed

Owner. Sam Reed

Next action. Write the stop and restart card for T01 through T14; specialist review of T03 and T06 before any user is scheduled; target 2026-12-15

Reviewer / review date. Pending. Casey Holt, planned 2026-11-01. Safeguards are written and not signed.

Not-applicable reason. Outdoor flight does not apply to Basic. The bench safety question applies.

Source guidance URLs. BMT-BASIC-DFMEA-001 Rev C1; BMT-BASIC-CONCEPT-DRAWING-001 Rev C1

Basic — What happened, including failures?

Project. Basic

Product revision. C1

Sheet revision. 1

Prepared by. Sam Reed

Date. 2026-10-24

Target market / jurisdiction. U.S. adults; Wisconsin illustrative base

Decision being prepared. Next private feasibility gate

Sheet. What the Prototype Needs to Prove

Lead. Sam Reed

Item ID. PROTOTYPE-05

Question. What happened, including failures?

Evidence to record. Raw measurements, units, photos, observations, anomalies and deviation from method. Separate measured from simulated and predicted performance.

Answer / assumption. Nothing has been run. BMT-BASIC-TEMPLATE-TEST-RESULTS-001 Rev C1 lists T01 through T14 as Not run, turn 0. No force readings, no cycle counts, no photos, no anomalies, and no passes. A CAD sketch is not a result. Projected lines DF01 84, DF02 90, DF03 64, DF04 96, DF05 36, and DF06 216 stay in the prediction column. They are not the residual total. The residual RPN total is 1579. The 80% review line is 1263.2. Accepted residual is 0. The highest projected line is DF06-M occupancy at 216. The result file is not to be edited to a pass to support the 2027-01-31 funding review.

Result (Y/N/NA). N

Explanation. There is no measurement to file. A sketch and a projected RPN stay out of the result record.

Status. Blocked — no run on file

Evidence / exact revision / URL and date. BMT-BASIC-TEMPLATE-TEST-RESULTS-001 Rev C1 T01-T14 Not run; BMT-BASIC-DFMEA-001 Rev C1 projected RPN column; 2026-10-24; no raw sheet

Owner. Sam Reed

Next action. Leave BMT-BASIC-TEMPLATE-TEST-RESULTS-001 Rev C1 at Not run until a dated raw sheet exists for that test ID; target 2026-12-15

Reviewer / review date. Pending. Casey Holt, planned 2026-11-01. No raw sheet is on file.

Not-applicable reason. Applicable

Source guidance URLs. BMT-BASIC-TEMPLATE-TEST-RESULTS-001 Rev C1; BMT-BASIC-DFMEA-001 Rev C1

Basic — What can we conclude, and what remains unproven?

Project. Basic

Product revision. C1

Sheet revision. 1

Prepared by. Sam Reed

Date. 2026-10-24

Target market / jurisdiction. U.S. adults; Wisconsin illustrative base

Decision being prepared. Next private feasibility gate

Sheet. What the Prototype Needs to Prove

Lead. Sam Reed

Item ID. PROTOTYPE-06

Question. What can we conclude, and what remains unproven?

Evidence to record. Verification: meets specified requirements. Validation: serves intended users/use. State sample and prototype limits, owner of failures, required changes and retest before a release claim.

Result (Y/N/NA). N

Explanation. Prototype verification has not started. Seven Grade B interviews and six price choices are filed and are not orders. Demand at $24.00 is not concluded. G0 through G5 have no sign-off, and this sheet does not buy a tool.

Status. Blocked — evidence not established

Owner. Sam Reed

Next action. Do not enter a pass, a release claim, or a tooling request from this sheet; target 2026-12-15

Reviewer / review date. Pending. Casey Holt, planned 2026-11-01. No performance conclusion is available.

Not-applicable reason. Applicable

Source guidance URLs. BMT-BASIC-CHECK-SHEET-PROJECT-001 Rev C1; BMT-BASIC-CONCEPT-DRAWING-001 Rev C1

Basic — Which characteristics must this prototype prove, and which are deferred?

Project. Basic

Product revision. C1

Sheet revision. 1

Prepared by. Sam Reed

Date. 2026-10-24

Target market / jurisdiction. U.S. adults; Wisconsin illustrative base

Decision being prepared. Next private feasibility gate

Sheet. What the Prototype Needs to Prove

Lead. Sam Reed

Item ID. PROTOTYPE-07

Question. Which characteristics must this prototype prove, and which are deferred?

Evidence to record. List each CTQ, requirement, DFMEA ID and test ID in this build; state the deferred characteristics and the gate they move to.

Answer / assumption. In scope: CTQ01 capture door (T01; production control CP01 does not replace the lab run), CTQ02 ventilation (T02), CTQ03 release slider (T03), CTQ04 washable shell (T04), CTQ05 bait pocket (T05), CTQ06 occupancy inspection (T06). The company milestone for 2027-01-31 asks for a private latch and ventilation review, so T01 and T02 are the minimum pair. T03 through T06 stay on this prototype because DFMEA severities are 8 or 9. Deferred: production tooling (the $12,000.00 on the 2027-03 cash row is an illustration, not a purchase order), retail drop test, channel acceptance, IP filing, disease-control language, Hotel, and Drone. BMT-BASIC-CONTROL-PLAN-001 Rev C1 rows CP01 through CP16 are not executed by these surrogates. CP01 is the latch control and its shop step is P05. The full untested set is T01 through T14 and CTQ01 through CTQ14. T01 through T06 is a short index of that set.

Result (Y/N/NA). Y

Explanation. T01 and T02 are the minimum pair for the 2027-01-31 private review. T03 through T06 stay on the same plan because the severities are 8 or 9.

Status. Recorded — scope list written

Evidence / exact revision / URL and date. BMT-BASIC-CRITICAL-QUALITY-001 Rev C1 CTQ01-CTQ14; BMT-BASIC-CONTROL-PLAN-001 Rev C1 CP01-CP16 not executed; shop step for CP01 is P05; company milestone 2027-01-31; 2026-10-24

Owner. Sam Reed

Next action. Mark T01 and T02 as the 2027-01-31 minimum and keep T03 through T06 on the same build plan; target 2026-12-15

Reviewer / review date. Pending. Casey Holt, planned 2026-11-01. The in-scope list is recorded as intent and is not accepted.

Not-applicable reason. Applicable

Source guidance URLs. BMT-BASIC-CRITICAL-QUALITY-001 Rev C1; BMT-BASIC-CONTROL-PLAN-001 Rev C1

Basic — What is the sample size rationale and how is each unit identified?

Project. Basic

Product revision. C1

Sheet revision. 1

Prepared by. Sam Reed

Date. 2026-10-24

Target market / jurisdiction. U.S. adults; Wisconsin illustrative base

Decision being prepared. Next private feasibility gate

Sheet. What the Prototype Needs to Prove

Lead. Sam Reed

Item ID. PROTOTYPE-08

Question. What is the sample size rationale and how is each unit identified?

Evidence to record. Unit IDs, count, why that count is enough for this gate, reuse order across tests, and the rule for a damaged unit.

Answer / assumption. n=10 is the screening count written on CTQ01 and T01. It is not a reliability demonstration and not a process-capability study. IDs BASIC-X1-001 through BASIC-X1-010, one card each, tied to BMT-BASIC-BOM-001 Rev C1 and any deviation. Order on the same units: T01 cycles, then T05 pull, then T04 wash, so the pocket and the shell see a cycled door. T02 may use the same units if the vent geometry is unchanged. T03 and T06 are adult-user tasks and run only on units that still meet the T01 latch line. A damaged unit is retired and the gap is recorded; it is not replaced without a new ID. No ID is assigned yet because nothing has been built.

Result (Y/N/NA). N

Explanation. n=10 is a screen, not a capability study. BASIC-X1-001 through BASIC-X1-010 are reserved and are not issued.

Status. Open — serials reserved, none issued

Evidence / exact revision / URL and date. BMT-BASIC-TEST-MATRIX-001 Rev C1 sample note n=10; BMT-BASIC-CONCEPT-DRAWING-001 Rev C1; 2026-10-24; unit cards not issued

Owner. Sam Reed

Next action. Prepare the unit-card template; assign no ID until a unit exists; target 2026-12-15

Reviewer / review date. Pending. Casey Holt, planned 2026-11-01. Serials are reserved and not issued.

Not-applicable reason. Applicable

Source guidance URLs. BMT-BASIC-TEST-MATRIX-001 Rev C1; BMT-BASIC-CONCEPT-DRAWING-001 Rev C1

Basic — What build method differs from the intended production part?

Project. Basic

Product revision. C1

Sheet revision. 1

Prepared by. Sam Reed

Date. 2026-10-24

Target market / jurisdiction. U.S. adults; Wisconsin illustrative base

Decision being prepared. Next private feasibility gate

Sheet. What the Prototype Needs to Prove

Lead. Sam Reed

Item ID. PROTOTYPE-09

Question. What build method differs from the intended production part?

Evidence to record. Production-intent process and material versus the prototype process; which dimensions must still match C1; which claims a non-production build cannot support.

Answer / assumption. Production intent is a molded PP shell (BASIC-01) and a molded captive pocket (BASIC-04). The prototype may be machined or printed. Latch geometry, opposing vent locations, the 30 mm release keep-out, the inspection window, and the captive pocket interface must match BMT-BASIC-CONCEPT-DRAWING-001 Rev C1. A printed unit cannot support a claim about mold shrinkage, knit lines, the $5.78 BMT-BASIC-TEMPLATE-COST-SHEET-001 Rev C1 total, or the BASIC-05 assembly line. Willa Marsh (Fictional Meadow Prototype Shop) is the quote contact on the bench bid, Perry Voss (Fictional Sample Works) is the quote contact on the production bid, and Eden Crowe (Fictional Northline Molding) is the third quote contact. Those 18 bids are on file, unawarded, and no purchase order exists.

Result (Y/N/NA). Y

Explanation. Latch, vents, the 30 mm keep-out, the window, and the pocket must match C1. Mold shrinkage and the unit-cost total are outside a printed build.

Status. Recorded — deviation rule written

Evidence / exact revision / URL and date. BMT-BASIC-BOM-001 Rev C1 BASIC-01 and BASIC-04; BMT-BASIC-TEMPLATE-COST-SHEET-001 Rev C1; 2026-10-24; 18 unawarded bids on file; no purchase order

Owner. Sam Reed

Next action. Record molded-versus-printed as an open deviation rule on the unit-card template; target 2026-12-15

Reviewer / review date. Pending. Casey Holt, planned 2026-11-01. The deviation rule is recorded as intent and is not accepted.

Not-applicable reason. Applicable

Source guidance URLs. BMT-BASIC-BOM-001 Rev C1

Basic — What equipment and calibration are required before a run counts?

Project. Basic

Product revision. C1

Sheet revision. 1

Prepared by. Sam Reed

Date. 2026-10-24

Target market / jurisdiction. U.S. adults; Wisconsin illustrative base

Decision being prepared. Next private feasibility gate

Sheet. What the Prototype Needs to Prove

Lead. Sam Reed

Item ID. PROTOTYPE-10

Question. What equipment and calibration are required before a run counts?

Evidence to record. Instrument, check method, what voids a run, and whether the cost sits inside the feasibility cap.

Result (Y/N/NA). N

Explanation. An uncalibrated gauge voids the run. The gauge sits in the unreleased tests-and-welfare line; the cycle rig sits in the prototype line.

Status. Open — instruments not released

Evidence / exact revision / URL and date. BMT-BASIC-TEST-MATRIX-001 Rev C1 equipment line; adopted five-line cap; tests and welfare $4,000.00; 2026-10-24; $5,000.00 prototype line unreleased

Owner. Sam Reed

Next action. Place the gauge inside the unreleased $4,000.00 tests-and-welfare line and the cycle rig inside the $5,000.00 prototype line; do not buy them on this date; target 2026-12-15

Reviewer / review date. Pending. Casey Holt, planned 2026-11-01. No instrument spend is released.

Not-applicable reason. Applicable

Source guidance URLs. BMT-BASIC-TEST-MATRIX-001 Rev C1

Basic — What cost is authorized for this prototype, and what is excluded?

Project. Basic

Product revision. C1

Sheet revision. 1

Prepared by. Sam Reed

Date. 2026-10-24

Target market / jurisdiction. U.S. adults; Wisconsin illustrative base

Decision being prepared. Next private feasibility gate

Sheet. What the Prototype Needs to Prove

Lead. Sam Reed

Item ID. PROTOTYPE-11

Question. What cost is authorized for this prototype, and what is excluded?

Evidence to record. Cap amount, named budget owner, included spend, excluded spend, candidate cost-sheet total, target price, and confirmation that no supplier is on order.

Result (Y/N/NA). N

Status. Blocked — allowance not consented

Owner. Alex Meadow

Next action. Request a line-named consent from Alex Meadow only after the method cards exist; no spend is authorized on 2026-10-24; target 2026-12-15

Reviewer / review date. Pending. Casey Holt, planned 2026-11-01. No allowance is consented.

Not-applicable reason. Applicable

Source guidance URLs. BMT-COMPANY-TEMPLATE-FUNDING-001 Rev C1

Basic — What are the stop rules, and who may restart?

Project. Basic

Product revision. C1

Sheet revision. 1

Prepared by. Sam Reed

Date. 2026-10-24

Target market / jurisdiction. U.S. adults; Wisconsin illustrative base

Decision being prepared. Next private feasibility gate

Sheet. What the Prototype Needs to Prove

Lead. Sam Reed

Item ID. PROTOTYPE-12

Question. What are the stop rules, and who may restart?

Evidence to record. Stop conditions, who stops, who may restart, and the subjects or environments that are not allowed.

Answer / assumption. Sam Reed stops a run if the door pinches a surrogate or a hand, if a part leaves the assembly under the 20 N pull, if a user cannot see occupancy, if the gauge check is missing, or if the method is departed from. Restart for T01, T02, T04, and T05 is Sam Reed, written on the unit card. Restart for T03 and T06 also requires the independent specialist. No live mouse, no child subject, no pet exposure. The welfare check interval is not set on this sheet. Risk B01 (welfare protocol inside the $4,000.00 tests line, Alex Meadow, due 2026-12-15) is open. Action A02 (animal-release review, Sam Reed, due 2026-12-01) is open and is not closed by a dry cycle.

Result (Y/N/NA). N

Explanation. Sam Reed can stop a bench run. Restart of T03 and T06 also needs the specialist, who is not appointed. The welfare interval is unset.

Status. Open — stop card not attached

Evidence / exact revision / URL and date. BMT-BASIC-DFMEA-001 Rev C1 DF03 and DF06; BMT-COMPANY-TEMPLATE-BUSINESS-RISKS-001 risk B01 due 2026-12-15; action A02 due 2026-12-01; both open

Owner. Sam Reed

Next action. Attach the stop card to the T03 and T06 method cards; leave the welfare interval unset; target 2026-12-15

Reviewer / review date. Pending. Casey Holt, planned 2026-11-01. The stop card is not on the method cards.

Not-applicable reason. Applicable

Source guidance URLs. BMT-BASIC-DFMEA-001 Rev C1; BMT-COMPANY-TEMPLATE-BUSINESS-RISKS-001 Rev C1

Basic — How will measured, simulated, and predicted results be separated?

Project. Basic

Product revision. C1

Sheet revision. 1

Prepared by. Sam Reed

Date. 2026-10-24

Target market / jurisdiction. U.S. adults; Wisconsin illustrative base

Decision being prepared. Next private feasibility gate

Sheet. What the Prototype Needs to Prove

Lead. Sam Reed

Item ID. PROTOTYPE-13

Question. How will measured, simulated, and predicted results be separated?

Evidence to record. Definition of measured, simulated, and predicted; where each is filed; which file stays Not run until a measurement exists.

Answer / assumption. Measured means a gauge number, a cycle count, a video, or a soil photo on a named unit ID, filed against that test ID. Simulated means a paper, CAD, or fixture check and is labeled simulated; it cannot close T01. Predicted means the DFMEA projected RPN column and is not evidence. BMT-BASIC-TEMPLATE-TEST-RESULTS-001 Rev C1 stays Not run until a measured row exists. A sentence on this sheet is not a measurement. The 2027-01-31 review may accept this plan. It may not treat the plan as a pass.

Result (Y/N/NA). Y

Explanation. A sentence on this sheet is not a measurement. The 2027-01-31 review may accept the plan. It may not treat the plan as a pass.

Status. Recorded — evidence classes defined

Evidence / exact revision / URL and date. BMT-BASIC-TEMPLATE-TEST-RESULTS-001 Rev C1; BMT-BASIC-DFMEA-001 Rev C1 projected residual column; 2026-10-24; no measured row

Owner. Sam Reed

Next action. Add a measured, simulated, or predicted label to the result template before the first run; target 2026-12-15

Reviewer / review date. Pending. Casey Holt, planned 2026-11-01. Measured, simulated, and predicted are separated.

Not-applicable reason. Applicable

Source guidance URLs. BMT-BASIC-TEMPLATE-TEST-RESULTS-001 Rev C1; BMT-BASIC-DFMEA-001 Rev C1

Basic — Who owns a failed proof, and what retest is required?

Project. Basic

Product revision. C1

Sheet revision. 1

Prepared by. Sam Reed

Date. 2026-10-24

Target market / jurisdiction. U.S. adults; Wisconsin illustrative base

Decision being prepared. Next private feasibility gate

Sheet. What the Prototype Needs to Prove

Lead. Sam Reed

Item ID. PROTOTYPE-14

Question. Who owns a failed proof, and what retest is required?

Evidence to record. Named owner of a fail, the redesign action tied to the DFMEA, the retest sample, and who may not close the fail.

Answer / assumption. Sam Reed owns every failed Basic characteristic. Alex Meadow owns the budget consent and does not close a technical fail. A T01 fail blocks the latch half of the 2027-01-31 milestone and requires the DF01 action (positive over-center latch and keyed hinge pin), or a written alternative, then a new 100-cycle run and 5 N pull on 10 units, not one confirmatory cycle. A T02 fail blocks the ventilation half of that milestone. A T06 fail blocks any instruction line that says the user can see occupancy. Retest uses new or fully reidentified units if the hardware changed. No gate has a sign-off.

Result (Y/N/NA). Y

Explanation. Alex Meadow does not close a technical fail by releasing money. A T01 fail repeats the full 100-cycle count on 10 units.

Status. Recorded — fail owner named

Evidence / exact revision / URL and date. BMT-BASIC-DFMEA-001 Rev C1 DF01 action, positive over-center latch and keyed hinge pin; owner Sam Reed; due 2026-12-15; not implemented

Owner. Sam Reed

Next action. Name Sam Reed on the fail-and-retest line of each method card; target 2026-12-15

Reviewer / review date. Pending. Casey Holt, planned 2026-11-01. The fail owner is named.

Not-applicable reason. Applicable

Source guidance URLs. BMT-BASIC-DFMEA-001 Rev C1

Basic — Which gate can this packet support, and which gates stay shut?

Project. Basic

Product revision. C1

Sheet revision. 1

Prepared by. Sam Reed

Date. 2026-10-24

Target market / jurisdiction. U.S. adults; Wisconsin illustrative base

Decision being prepared. Next private feasibility gate

Sheet. What the Prototype Needs to Prove

Lead. Sam Reed

Item ID. PROTOTYPE-15

Question. Which gate can this packet support, and which gates stay shut?

Evidence to record. Gate this packet can support, gates that stay shut, and the decision this sheet does not authorize.

Result (Y/N/NA). Y

Explanation. The packet can later support a private G1 recommendation only. The 2026-11-15 meeting has not been held.

Status. Recorded — later gates stay shut

Evidence / exact revision / URL and date. BMT-BASIC-CHECK-SHEET-PROJECT-001 Rev C1 PROJECT-06 gates G0-G5; BMT-COMPANY-TEMPLATE-MEETING-001 dated 2026-11-15 not held; reserve floor $20,000.00

Owner. Sam Reed

Next action. Keep any later recommendation limited to G1; do not open G2 through G5 on this sheet; target 2026-12-15

Reviewer / review date. Pending. Casey Holt, planned 2026-11-01. G2 through G5 stay shut.

Not-applicable reason. Applicable

Source guidance URLs. BMT-BASIC-CHECK-SHEET-PROJECT-001 Rev C1; BMT-COMPANY-TEMPLATE-MEETING-001 Rev C1

Basic — What must be in the evidence package before the review date?

Project. Basic

Product revision. C1

Sheet revision. 1

Prepared by. Sam Reed

Date. 2026-10-24

Target market / jurisdiction. U.S. adults; Wisconsin illustrative base

Decision being prepared. Next private feasibility gate

Sheet. What the Prototype Needs to Prove

Lead. Sam Reed

Item ID. PROTOTYPE-16

Question. What must be in the evidence package before the review date?

Evidence to record. Required files, revision, and the rule when one file is missing. Reviewer name stays blank until the package exists.

Answer / assumption. Before a reviewer is named, the package needs: this sheet at C1; BMT-BASIC-BOM-001 Rev C1; DFMEA C1 with DF01 through DF18 (18 data rows); BMT-BASIC-TEST-MATRIX-001 Rev C1 acceptance lines for T01 through T14; a method card per test; unit cards BASIC-X1-001 through BASIC-X1-010 or an explicit not-built log; a calibration note or a statement that no run occurred; BMT-BASIC-TEMPLATE-TEST-RESULTS-001 Rev C1 still showing Not run, or a measured replacement; and the consent status of the $5,000.00 prototype line (not released on 2026-10-24). If any item is missing, the review answer is not ready. A Casey Holt read is planned for 2026-11-01 and has not been held as of 2026-10-28. That planned read is not a close while any package item is missing.

Result (Y/N/NA). N

Explanation. A missing file means the review is not ready. The planned 2026-11-01 read has not been held and does not close the package.

Status. Open — package incomplete

Evidence / exact revision / URL and date. BMT-BASIC-CHECK-SHEET-PROTOTYPE-001 Rev C1; ; BMT-BASIC-CONCEPT-DRAWING-001 Rev C1; market panels are on the evidence log and are not this package; package list for T01-T14; planned read 2026-11-01 not held, package not closed; 2026-10-24

Owner. Sam Reed

Next action. Assemble the package list. Do not close the package on the planned 2026-11-01 read, which has not been held, until every file is present; target 2026-12-15

Reviewer / review date. Pending. Casey Holt, planned 2026-11-01. The package list is incomplete.

Not-applicable reason. Applicable

Source guidance URLs. BMT-BASIC-CHECK-SHEET-PROTOTYPE-001 Rev C1; BMT-BASIC-CONCEPT-DRAWING-001 Rev C1

Basic — What user and misuse conditions is the prototype required to represent?

Project. Basic

Product revision. C1

Sheet revision. 1

Prepared by. Sam Reed

Date. 2026-10-24

Target market / jurisdiction. U.S. adults; Wisconsin illustrative base

Decision being prepared. Next private feasibility gate

Sheet. What the Prototype Needs to Prove

Lead. Sam Reed

Item ID. PROTOTYPE-17

Question. What user and misuse conditions is the prototype required to represent?

Evidence to record. User, place, and misuse the build must represent, and the uses named out of scope in the project sheet.

Answer / assumption. The intended user and buyer on PROJECT-01 is an adult homeowner. Seven Grade B problem interviews (7 of 20) and six price choices are on file. They do not check a built trap. The prototype represents an indoor bench, one-mouse volume, a dry then dirty/worn condition where the matrix requires it, and an adult hand at the release. Misuse in scope is the 20 N pull on the bait pocket and a hand near the slider. Out of scope: children, pets as users, outdoor weather, multi-catch, unattended multi-day holding, and any pesticide or disease claim. Morgan Hale (hardware pilot, store not selected) has not been contacted. Channel acceptance is not this prototype.

Result (Y/N/NA). Y

Explanation. The user on the project sheet is an adult homeowner. Seven Grade B interviews and six price choices are filed and do not replace a built-unit check. Children, pets as users, and channel acceptance are outside this build.

Status. Recorded — user boundary written

Evidence / exact revision / URL and date. BMT-BASIC-CHECK-SHEET-PROJECT-001 Rev C1 PROJECT-01 and PROJECT-02; 2026-10-24; Morgan Hale not contacted

Owner. Sam Reed

Next action. State the adult, indoor, one-mouse boundary on the method cards; do not recruit children; target 2026-12-15

Reviewer / review date. Pending. Casey Holt, planned 2026-11-01. The user boundary is recorded as intent and is not accepted.

Not-applicable reason. Applicable

Source guidance URLs. BMT-BASIC-CHECK-SHEET-PROJECT-001 Rev C1

Basic — What would make the prototype effort stop rather than revise?

Project. Basic

Product revision. C1

Sheet revision. 1

Prepared by. Sam Reed

Date. 2026-10-24

Target market / jurisdiction. U.S. adults; Wisconsin illustrative base

Decision being prepared. Next private feasibility gate

Sheet. What the Prototype Needs to Prove

Lead. Sam Reed

Item ID. PROTOTYPE-18

Question. What would make the prototype effort stop rather than revise?

Evidence to record. Conditions that stop the allowance rather than fund another revision, who receives the stop proposal, and the statement that no stop is declared on the preparation date.

Result (Y/N/NA). Y

Explanation. One failed redesign of the door, or both vent paths blocked, with no remaining prototype line, is a stop proposal. It is not declared on 2026-10-24.

Status. Recorded — stop rule written, not declared

Evidence / exact revision / URL and date. BMT-COMPANY-TEMPLATE-FUNDING-001 Rev C1, cap not increased if the 2027-01-31 review is missed; 2026-10-24; no stop declared

Owner. Alex Meadow

Next action. Write the one-redesign stop rule into the budget note for Alex Meadow; do not declare a stop; target 2026-12-15

Reviewer / review date. Pending. Casey Holt, planned 2026-11-01. The stop rule is not a declared stop.

Not-applicable reason. Applicable

Source guidance URLs. BMT-COMPANY-TEMPLATE-FUNDING-001 Rev C1

Document administration

Preparation: Sam Reed, scenario attribution, 2026-10-24. Signature: unsigned. Review: pending; no reviewer signature or date. Approval: withheld; no approver signature or date.

Prepared byDate
Reviewed byDate
Approved byDate