THE BETTER MOUSE TRAP CO. · COMPLETED METHOD RECORD

APQP summary — D1 internal pilot completion

DocumentBMT-APQP-FOR-BOTS-D1
Revision / review dateD1 · 2027-06-30
Accountable ownerAlex Meadow

Scope: APQP summary — D1 internal pilot completion. Read the observations and decisions below within their stated conditions.

APQP phases / evidence / decisions

PhaseBasicMouse HotelDrone benchApproval / actual date
Plan and defineB-RET-01; 12/100 baselineH-IND-01; 8/100 baselineD-INH-01; 3/100 baselineAlex / May 03
Product designKeyed positive latch; DF01 addressedRetained state; dropout addressedHardware inhibit; reset path addressedSam/Jordan / May 20–24
Process designGauge + pull each unit; WI-D1Checksum + local/reset challengeIsolation witness + inhibit challengeSam/Jordan / June 16
Product/process validation0/1000 rebounds; 10/10 pulls0/1000 omissions; 100/100 valid resets0/1000 unsafe enables; 30/30 losses inhibitIra / June 18
Feedback and action200 follow-up cycles, 0 failures200 follow-up events, 0 misses200 follow-up commands, 0 unsafe enablesAlex / June 30

Gate and submission disposition

RecordDecision
D1 internal pilot packet, not an automotive customer submission. Product-specific FAI, control plan, MSA, results and internal PSW linked from sample index.Alex signed June 25: accept Basic/Hotel scoped pilots and Drone bench; deny public release and flight. All listed gate decisions signed.

Record reviewed and signed: Alex Meadow, 2027-06-30. Technical review: Sam Reed / Jordan Vale; independent check: Ira Bell. Disposition: use for the stated internal scope only.

Compare the reference example. Teaching data and signed dispositions: D1 scenario register.