THE BETTER MOUSE TRAP CO. · COMPLETED METHOD RECORD
Engineering change notice — D1 implemented changes
Scope: Engineering change notice — D1 implemented changes. Read the observations and decisions below within their stated conditions.
ECN register
| Change | Before → after / reason | Verification / affected records | Approval / effective |
|---|---|---|---|
| ECN-D1-01 Basic | Floating hinge → keyed positive latch; 12/100 rebounds | 0/1000; drawing, DFMEA, PFMEA, control plan and WI D1 | Alex May 10; Sam implemented May 20 |
| ECN-D1-02 Hotel | Momentary flag → retained local occupancy; 8/100 misses | 0/1000; state machine, fault suite and WI D1 | Alex May 10; Jordan implemented May 22 |
| ECN-D1-03 Drone | Reset permissive → hardware inhibit; 3/100 command faults | 30/30 losses inhibited; isolation diagram, test script D1 | Alex May 10; Jordan implemented May 24 |
Release audit
| Withdrawal | Close-out |
|---|---|
| C1 removed from 4/4 benches June 20; historical read-only C1 retained | Ira verified evidence June 18; Alex signed controlled-scope effectiveness June 30. |
Record reviewed and signed: Alex Meadow, 2027-06-30. Technical review: Sam Reed / Jordan Vale; independent check: Ira Bell. Disposition: use for the stated internal scope only.
Compare the reference example. Teaching data and signed dispositions: D1 scenario register.