THE BETTER MOUSE TRAP CO. · COMPLETED METHOD RECORD
DOE — latch clearance and preload
Scope: DOE — latch clearance and preload. Read the observations and decisions below within their stated conditions.
Randomized 2² screening · 2027-05-07
| Run order | A clearance mm | B preload N | Basic rebounds / 100 | Drone unsafe enables / 100 |
|---|---|---|---|---|
| 1 (design 3) | 0.40 | 2.0 | 4 | 1 |
| 2 (design 1) | 0.40 | 1.0 | 12 | 3 |
| 3 (design 4) | 0.20 | 2.0 | 0 | 0 |
| 4 (design 2) | 0.20 | 1.0 | 2 | 1 |
| 5 repeat design 2 | 0.20 | 1.0 | 3 | 1 |
| 6 repeat design 4 | 0.20 | 2.0 | 0 | 0 |
| 7 repeat design 1 | 0.40 | 1.0 | 11 | 3 |
| 8 repeat design 3 | 0.40 | 2.0 | 5 | 1 |
Analysis and confirmation
| Field | Entry |
|---|---|
| Response and scope | Failure count per 100 surrogate cycles; Basic hinge and Drone isolated release rig use separate fixtures with same factor levels. Ira Bell randomized runs; operator and temperature held fixed. |
| Effects | Basic high clearance mean 8 versus low 1.25 failures; high preload mean 2.25 versus low 7. Drone high clearance 2 versus low 0.5; high preload 0.5 versus low 2. Lower clearance / higher preload selected. |
| Interaction | Basic preload effect is -7 failures at high clearance and -2.5 at low clearance; interaction warrants caution. No significance claim from eight runs. |
| Field | Entry |
|---|---|
| Confirmation | D1 positive latch / inhibited release configuration: Basic 0/1000 rebounds; Drone 0/1000 unsafe enables. Force increase checked with 10/10 manual-access trials. |
| Signed | Sam Reed and Jordan Vale 2027-05-10; Ira Bell confirmation 2027-06-18; Alex gate 2027-06-25. |
Record reviewed and signed: Alex Meadow, 2027-06-30. Technical review: Sam Reed / Jordan Vale; independent check: Ira Bell. Disposition: use for the stated internal scope only.
Compare the reference example. Teaching data and signed dispositions: D1 scenario register.