THE BETTER MOUSE TRAP CO. · COMPLETED METHOD RECORD

Kanban board — D1 close-out snapshot

DocumentBMT-KANBAN-AND-WIP-LIMITS-D1
Revision / review dateD1 · 2027-06-30
Accountable ownerAlex Meadow

Scope: Kanban board — D1 close-out snapshot. Read the observations and decisions below within their stated conditions.

Board at 2027-06-20 09:00 · limit applies to active columns

Ready (limit 5)Doing (limit 2)Verify (limit 2)Done (limit none)
K07 packaging review / age 1dK05 station revision audit / Sam / age 1dK04 local reset test / Ira / age 2dK01 keyed hinge / lead 4d
K08 user-task review / age 0dK06 readiness checklist / Jordan / age 1dK03 inhibit injection / Ira / age 2dK02 retained flag / lead 3d

Flow policy and measured follow-up

FieldEntry
Pull / blocked policyPull only when next column has space. Blocked cards remain in Doing and count toward limit; stop starting and help verification.
Service expectation85% within 5 working days; two done cards lead times 4 and 3 days, mean 3.5; too few for reliable percentile.
FieldEntry
June 30 reviewK03–K06 done within 5 days; no limit breach; K07/K08 deferred by Alex because public release denied.
Owner / sign-offAlex Meadow board owner; Sam and Jordan acknowledged June 30.

Record reviewed and signed: Alex Meadow, 2027-06-30. Technical review: Sam Reed / Jordan Vale; independent check: Ira Bell. Disposition: use for the stated internal scope only.

Compare the reference example. Teaching data and signed dispositions: D1 scenario register.