THE BETTER MOUSE TRAP CO. · COMPLETED METHOD RECORD

SIPOC and turtle — controlled prototype verification

DocumentBMT-SIPOC-AND-TURTLE-DIAGRAMS-D1
Revision / review dateD1 · 2027-06-30
Accountable ownerAlex Meadow
Turtle: equipment, people, method and measures surround the process; input/output connections terminate at box boundaries.Execute D1 verificationRecord actual → signed decisionWITH WHATChecked gauge / D1 harnessWITH WHOMSam / Jordan / Ira / RobinHOWD1 criteria / serial / stop ruleMEASURES1000 cases / 30 faults / 4 stationsINPUTD1 requirement / traceable unitOUTPUTMeasured result / signed gate
The verification process uses the listed equipment, people and methods to turn approved inputs into measured results and a signed gate decision.

Scope: SIPOC and turtle — controlled prototype verification. Read the observations and decisions below within their stated conditions.

SIPOC · start approved D1 requirement, end signed internal decision

SupplierInputProcessOutputCustomer
Sam / BasicD1 latch drawing, traceable unitKit → assemble → gauge → cycle → reviewGap and retention records, 0/1000 reboundsIra → Alex pilot gate
Jordan / HotelD1 firmware + trace manifestLoad → simulate → fault → reset → review0/1000 omissions; 100/100 empty resetsIra → Robin/Alex
Jordan / DroneIsolated rig + inhibit drawingWitness isolation → inject → log → review30/30 inhibited loss casesIra → Alex no-flight gate

Turtle · center: execute and record D1 verification

LegCompleted description
With whatChecked indicator 0.01 mm; force gauge 0.1 N; replay harness D1; isolated release fixture
With whomSam mechanism; Jordan code; Ira independent check; Robin scope; Alex decision
HowApproved D1 criteria; serial log; no run without isolation check; stop on first unsafe event
Measures1000 confirmation opportunities per critical function; 80/80 checker judgements; 4/4 current stations
LegCompleted description
Inputs / outputsApproved criteria and traceable units → measured results and signed bounded decisions
ApprovalAlex signed June 25; June 30 follow-up complete; no public release

Record reviewed and signed: Alex Meadow, 2027-06-30. Technical review: Sam Reed / Jordan Vale; independent check: Ira Bell. Disposition: use for the stated internal scope only.

Compare the reference example. Teaching data and signed dispositions: D1 scenario register.