THE BETTER MOUSE TRAP CO. · COMPLETED METHOD RECORD
Revision register — D1 at every pilot station
Scope: Revision register — D1 at every pilot station. Read the observations and decisions below within their stated conditions.
Controlled records
| Item | Previous | Current / approval | Point of use / verified |
|---|---|---|---|
| Basic drawing + WI | C1 | D1 / Alex May 20 | Basic bench, Sam June 20 |
| Hotel state machine + WI | C1 | D1 / Alex May 22 | Hotel bench, Jordan June 20 |
| Drone isolation + WI | C1 | D1 / Alex May 24 | Drone bench, Ira June 20 |
| Pilot gate index | C1 planning | D1 / Alex June 25 | Review station, Alex June 25 |
Audit
| Result | Exception handling |
|---|---|
| 4/4 stations D1; C1 station exception found June 19 corrected before use; June 30 repeat 4/4 | Quarantine obsolete copy; preserve C1 in read-only archive; Alex signed June 30. |
Record reviewed and signed: Alex Meadow, 2027-06-30. Technical review: Sam Reed / Jordan Vale; independent check: Ira Bell. Disposition: use for the stated internal scope only.
Compare the reference example. Teaching data and signed dispositions: D1 scenario register.