THE BETTER MOUSE TRAP CO. · COMPLETED METHOD RECORD
Current and future value-stream map — Basic
DocumentBMT-VALUE-STREAM-MAPPING-D1
Revision / review dateD1 · 2027-06-30
Accountable ownerAlex Meadow
Material moves on solid arrows. Information moves on dashed arrows. Triangles are queued inventory; the lower ladder separates waiting days from processing minutes. No external shipment.
Scope: Current and future value-stream map — Basic. Read the observations and decisions below within their stated conditions.
Current state · 60 units/day; 420 net minutes; takt 7 min
Route
Cycle time
Queue before
Changeover
Quality yield
Supplier kit → Kit
3 min
60 units / 1 day
10 min
100%
Kit → Assemble
6 min
30 units / 0.5 day
20 min
88%
Assemble → Inspect
8 min
30 units / 0.5 day
15 min
100% detection on known defects
Inspect → Pilot holding
2 min
60 units / 1 day
0 min
No shipment; controlled holding
Timeline and future state
Measure
Current
Future / verified June 20
Processing / queue
19 min processing + 3 days queue
16 min processing + 0.5 day queue; inspect 5 min
Information flow
Alex daily demand → Sam schedule → each station independently
Alex daily demand → inspection pacemaker → upstream pull, max 10 WIP
Alex accepted June 25; Ira sampled queue and timing; no public shipment
Record reviewed and signed: Alex Meadow, 2027-06-30. Technical review: Sam Reed / Jordan Vale; independent check: Ira Bell. Disposition: use for the stated internal scope only.