THE BETTER MOUSE TRAP CO. · COMPLETED METHOD RECORD
Walkthrough and control test — revision release
Scope: Walkthrough and control test — revision release. Read the observations and decisions below within their stated conditions.
Walk one transaction end-to-end · ECN-D1-01
| Step | Evidence inspected | Expected control | Observed / exception |
|---|---|---|---|
| Request | ECN-D1-01 keyed hinge, May 10 | Sam identifies requirement and risk | B-RET-01 / DF01 linked |
| Approve | Alex signed May 10; Ira verification required | Author cannot approve own release | Distinct Sam/Alex signatures present |
| Implement | Drawing and work instruction D1 | Same revision at point of use | One C1 station found June 19; quarantined before use |
| Verify | TR-B-D1 June 18 | Independent result before pilot gate | Ira result 0/1000; date precedes June 25 gate |
| Release / withdraw | D1 index June 20 | Withdraw superseded C1 | 4/4 stations current on retest |
Control sampling
| Population / selection | Test result | Conclusion |
|---|---|---|
| 16 revision records; systematic sample 1,4,7,10,13,16 | 6/6 owner, approval and evidence links present; station exception 1/4 initially, 0/4 after correction | Alex accepted June 25; exception cannot be hidden by record sample; weekly station walk assigned Sam. |
Record reviewed and signed: Alex Meadow, 2027-06-30. Technical review: Sam Reed / Jordan Vale; independent check: Ira Bell. Disposition: use for the stated internal scope only.
Compare the reference example. Teaching data and signed dispositions: D1 scenario register.