The Better Mouse Trap Co. / sample paperwork

Drone Trap — Design for manufacture and assembly

Drone TrapRevision C12026-10-24Planning draft18 entries
Drone Trap — Design for manufacture and assemblyBMT-DRONE-CHECK-SHEET-DFM-001 · Rev C1
Company
The Better Mouse Trap Co.
Project / product line
Drone trap
Document
Drone Trap — Design for manufacture and assembly
Document no.
BMT-DRONE-CHECK-SHEET-DFM-001
Revision
C1
Status
Planning draft
Start date
2026-10-24
Revision date
2026-10-24
Prepared by / owner
Jordan Vale, flight research, DRONE-C1
Checklist ID
BMT-DRONE-CHECK-SHEET-DFM-001 Rev C1
Scope
DRONE-C1 capsule DRONE-01 and the buy-item airframe.
Reviewer
Casey Holt
Review date
Planned 2026-11-01. Pending as of 2026-10-28. The review has not been held.
Team
Alex Meadow, packet owner and no-flight gate; Jordan Vale, flight research; Sam Reed, mechanical interface; Robin Keel,
Approved by
review pending.
Drone Trap — Design for Manufacture and Assembly
Item / review questionAnswer / findingResult / statusEvidenceResponsibility / action

Item ID: DFM-01

Question: What performance and safety requirements drive the design?

Answer / assumption: R01–R30 and CTQ01–CTQ34 drive the design. The capsule keeps the trap-family features: latch (DF01, RPN 210), raised vents (DF02, RPN 252), 30 mm slider clearance (DF03, RPN 192), washable shell (DF04, RPN 240), captive bait (DF05, RPN 162), and occupancy window (DF06, RPN 432). Aircraft geometry that a supplier must not delete includes the carriage pinch guard (DF17, RPN 360), redundant payload latch (DF18, RPN 400), propeller guards (DF19, RPN 350), protected mission battery (DF21, RPN 480), release door that stays shut in flight (DF23, RPN 320), Remote ID equipment on BMT-DRONE-BOM-001 (DF26, RPN 360), and dock contact alignment (DF27, RPN 400). Navigation and route rows such as DF25 (RPN 630) are not mold features; they still forbid a weight-saving cut that removes the equipment they depend on.

Explanation: Simulation and specialist review come before any flight hardware is treated as manufacturable. Proposed RPNs are not test results, and no live animal or flight is authorized by this sheet. DF01–DF30 is not the full DFMEA. The C1 index is DF01–DF60, CTQ01–CTQ34, control plan CP01–CP34, and tests T01–T34, all unrun. Process steps are P01–P34. Capsule latch is P04. Radio-module hold is P18. Field-release door is P25. Residual RPN on the ranking sheet is 8464, the 80% review line is 6771.2, and accepted residual is 0. Year-1 commercial units authorized: 0.

Result (Y/N/NA): Y

Status: Recorded — requirements listed, untested

BMT-DRONE-SPEC-SHEET-001 Rev C1; BMT-DRONE-DFMEA-001 Rev C1 DF01–DF60; BMT-DRONE-CRITICAL-QUALITY-001 Rev C1 CTQ01–CTQ34; BMT-DRONE-CONTROL-PLAN-001 Rev C1 CP01–CP34;

Owner: Jordan Vale

Next action: Simulation and specialist review first. Trace the capsule CTQs and the aircraft freeze list onto the unreleased C1 layout. No flight article. Target 2027-06-15.

Reviewer / review date: Pending. Casey Holt, planned 2026-11-01. CTQ list is the C1 intent to check. Geometry is not frozen.

Item ID: DFM-02

Question: Does the process fit material, geometry and volume?

Answer / assumption: Do not treat the aircraft as a PP molding. The only made plastic is DRONE-01, the ventilated capsule, with a $60,000.00 tool allowance. Buy items are DRONE-02 carriage (aluminum and gear, $50.00), DRONE-03 guarded composite frame ($80.00), DRONE-04 motors and props at qty 4 (extended $40.00), DRONE-05 navigation ($105.00), DRONE-06 redundant latch ($30.00), DRONE-07 flight battery ($70.00), DRONE-08 dock ($45.00), DRONE-09 radio ($17.00), and DRONE-11 crate ($30.00). DRONE-10 assembly and hardware-in-the-loop labor is $60.00 in house. The BMT-DRONE-TEMPLATE-COST-SHEET-001 uses 100 units a year for 3 years. Printed capsules and bench carriages are the bridge. A production capsule mold is a weak fit at this volume; see DFM-09. BMT-DRONE-BOM-001 is 21 rows: DRONE-C1-ASSY and DRONE-01 through DRONE-18. Labor is DRONE-10 and tooling is DRONE-18. DRONE-14 remote ID at $18.00 stays out of the piece sum. The buy list above is not the whole bill. Year-1 commercial units authorized: 0.

Explanation: One hundred a year is a manufacturing sensitivity, not a forecast, and commercial units authorized are 0. Thirty-three dated bids are on file for DRONE-01 through DRONE-11: Fictional Sample Works (Perry Voss, 2026-10-02, valid through 2026-12-31), Fictional Meadow Prototype Shop (Willa Marsh, 2026-10-06, valid through 2026-12-05), and Fictional Northline Molding (Eden Crowe, 2026-10-09, valid through 2027-01-07). None is awarded and none is a purchase order. No composite cure spec, gear class, or motor lead time is on those bids. The $60,000.00 DRONE-01 / DRONE-18 allowance is not one of the bids.

Result (Y/N/NA): N

Status: Open — bids on file, process limits blank

BMT-DRONE-BOM-001 Rev C1, 21 rows, DRONE-C1-ASSY and DRONE-01 through DRONE-18; BMT-DRONE-TEMPLATE-QUOTE-COMPARISON-001 Rev C1, 33 unawarded bids dated 2026-10-02, 2026-10-06, and

Owner: Jordan Vale

Next action: Simulation and specialist review first. State against the 33 unawarded bids that only DRONE-01 is a mold question and that 100 a year does not justify steel yet. Leave BMT-DRONE-RFQ-PACKAGE-001 unissued. No flight. Target 2027-06-15.

Reviewer / review date: Pending. Casey Holt, planned 2026-11-01. Volume case is a sensitivity. No process is accepted.

Item ID: DFM-03

Question: Are features realistic for the chosen process?

Answer / assumption: Capsule features are unapproved: draft, wall, vent steel, and latch undercuts. Aircraft features are also unapproved: guard opening versus a finger (DF19), carriage pinch geometry (DF17), dock contact height (DF27), and a latch that keeps a second load path (DF18). The composite frame and the gear carriage are purchased geometry with no datums. A printed capsule will not show knit lines, guard strength, or contact alignment.

Explanation: No supplier limit exists for the mold, the composite, or the machined carriage. Handbook numbers are not adopted.

Result (Y/N/NA): N

Status: Open — supplier limits blank

BMT-DRONE-CONCEPT-DRAWING-001 Rev C1; DF17, DF18, DF19, DF27 proposed; BMT-DRONE-RFQ-PACKAGE-001 capability questions unanswered; no moldflow and no ply review. 2026-10-24.

Owner: Jordan Vale

Next action: Simulation and specialist review first. Split the open-feature list into capsule steel, carriage, guards, and dock contacts. Target 2027-06-15.

Reviewer / review date: Pending. Casey Holt, planned 2026-11-01. Feature list is open. No supplier limit is adopted.

Item ID: DFM-04

Question: Are tolerances functional and inspectable?

Answer / assumption: Capsule fits still proposed, and not on a drawing, are the latch stack (CTQ01, 100 dry cycles and 5 N) and the 30 mm finger line (CTQ03). Aircraft fits with no released number are payload-latch retention (CTQ18), guard gap (CTQ19), release-door closed gap in the flight attitude (CTQ23), and dock contact position (CTQ27). Stacks have to include PP shrink on the capsule, composite variation on the frame, and gear backlash on the carriage. No gauge repeatability study exists.

Explanation: Nominal CAD is not the tolerance. Features that do not serve those CTQs stay reference so they are not purchased tight.

Result (Y/N/NA): N

Status: Open — no dimensioned drawing

BMT-DRONE-CRITICAL-QUALITY-001 Rev C1 CTQ01, CTQ03, CTQ18, CTQ19, CTQ23, CTQ27; BMT-DRONE-DFMEA-001 Rev C1; no dimensioned drawing. 2026-10-24.

Owner: Jordan Vale

Next action: Simulation and specialist review first. Balloon only the cited CTQs and mark aircraft datums as unreleased. Target 2027-06-15.

Reviewer / review date: Pending. Casey Holt, planned 2026-11-01. No datum is released. Tight tolerances are not purchased.

Item ID: DFM-05

Question: Can the parts be assembled consistently?

Answer / assumption: The stack is capsule to DRONE-06 redundant latch, latch to carriage, carriage to frame, four guarded motor sets, battery connector, and dock. Connectors are keyed. A propeller must not install on an unguarded position. The field-release door (DF23) must not use the same motion as a service latch. DRONE-10 hardware-in-the-loop is a required station, not a repair step. BMT-DRONE-BOM-001 Rev C1 has 21 rows: assembly DRONE-C1-ASSY plus DRONE-01 through DRONE-18, including labor DRONE-10, tooling DRONE-18, and the roll-up. It is not an eleven-line bill. Nothing has been built or timed.

Explanation: Process steps are P01–P34. Capsule latch is P04. Radio-module hold is P18. Field-release door is P25. PFMEA has 102 data rows, PF01–PF99 (plus crate-close submodes PF99-A/PF99-B/PF99-C; 102 rows). The cause line is still assembly or configuration error. A missed guard is DF19 at a proposed RPN of 350.

Result (Y/N/NA): N

Status: Open — no build trial

BMT-DRONE-BOM-001 Rev C1, 21 rows, DRONE-C1-ASSY and DRONE-01 through DRONE-18; BMT-DRONE-PROCESS-FLOW-001 Rev C1 P01–P34, capsule latch at P04, radio-module hold at P18,

Owner: Jordan Vale

Next action: Simulation and specialist review first. Define the keyed latch, guard, and battery connector on the assembly sketch before any bench unit. No flight. Target 2027-06-15.

Reviewer / review date: Pending. Casey Holt, planned 2026-11-01. Assembly intent is not a witnessed build.

Item ID: DFM-06

Question: Can material or supplier substitutions change performance?

Answer / assumption: Do not substitute capsule resin, propeller, guard, cell, antenna, or latch sensor without a regression on the affected requirement. DRONE-04 is qty 4 and is not a single-motor alternate. DRONE-07 stays a protected lithium pack (DF21, proposed RPN 480). DRONE-09 radio and the Remote ID device (DF26, proposed RPN 360) are not optional weight reductions. DRONE-06 keeps its second latch path (DF18, proposed RPN 400). Dock contact material is part of DF27 (proposed RPN 400).

Explanation: Designer catalog lines stay separate from purchasing sources. No approved equivalent exists. A cheaper unprotected cell is a refusal, not a purchasing saving.

Result (Y/N/NA): N

Status: Open — no approved alternate

BMT-DRONE-BOM-001 Rev C1 DRONE-01, DRONE-04, DRONE-06, DRONE-07, DRONE-09; DF18, DF21, DF26, DF27; no alternate list. 2026-10-24.

Owner: Jordan Vale

Next action: Simulation and specialist review first. Write allowed-part lines for resin, prop, guard, cell, antenna, latch sensor, and Remote ID. Target 2027-06-15.

Reviewer / review date: Pending. Casey Holt, planned 2026-11-01. Substitution ban is recorded. No alternate is approved.

Item ID: DFM-07

Question: Are the files complete and at one revision?

Answer / assumption: BMT-DRONE-BOM-001, BMT-DRONE-TEMPLATE-COST-SHEET-001, BMT-DRONE-DFMEA-001, BMT-DRONE-CONTROL-PLAN-001, R01–R30, and this sheet are all marked C1. There is no released STEP set, no wiring diagram, no dimensioned drawing, and no ballooned CTQ print. The 100-a-year case, the 50% case, and the 200% case are sensitivity only. A render is not the release package.

Explanation: Design freeze is not claimed. Twenty-one BOM rows, DRONE-C1-ASSY and DRONE-01 through DRONE-18, share a revision label, and the manufacturing file set is missing.

Result (Y/N/NA): N

Status: Blocked — no released CAD

BMT-DRONE-SPEC-SHEET-001 Rev C1; BMT-DRONE-CONCEPT-DRAWING-001 Rev C1; BMT-DRONE-BOM-001 Rev C1, 21 rows, DRONE-C1-ASSY and DRONE-01 through DRONE-18; no CAD revision. 2026-10-24.

Owner: Jordan Vale

Next action: Simulation and specialist review first. List the missing C1 files, including wiring and the guard drawing, and keep the pack unreleased. Target 2027-06-15.

Reviewer / review date: Pending. Casey Holt, planned 2026-11-01. Revision label is C1. Manufacturing files are missing.

Item ID: DFM-08

Question: What did the manufacturer flag, and who accepted changes?

Answer / assumption: No manufacturer has flagged a change, and nobody has accepted one. Fictional Sample Works is not selected. Thirty-three dated bids are on file and unawarded; they are not a DFM markup and not a purchase order. BMT-DRONE-RFQ-PACKAGE-001 is not issued, and its capability questions are still unanswered. A later markup needs a date, the CTQ touched, the dollar or tool impact, and acceptance by Alex Meadow. None of that exists.

Explanation: The DRONE-01 / DRONE-18 capsule figure of $60,000.00 is an invented tooling allowance, not a quote, and it sits outside the $250,000.00 research ceiling. The Drone allowance of $250,000.00 is not secured, is not drawn, and stops before production tooling and before any flight. Year-1 commercial units authorized: 0.

Result (Y/N/NA): NA

Status: No DFM markup on file

BMT-DRONE-TEMPLATE-QUOTE-COMPARISON-001 Rev C1, 33 unawarded bids, no purchase order; BMT-DRONE-RFQ-PACKAGE-001 Rev C1 not issued, capability questions unanswered;

Owner: Jordan Vale

Next action: Simulation and specialist review first. Leave BMT-DRONE-RFQ-PACKAGE-001 unissued until DFM-03 and DFM-09 are filled in. No tool purchase and no flight. Target 2027-06-15.

Reviewer / review date: Pending. Casey Holt, planned 2026-11-01. No supplier markup exists. Nothing is accepted.

Item ID: DFM-09

Question: Does the tooling spend fit the funded allowance and the volume used to amortize it?

Answer / assumption: DRONE-01 allowance is $60,000.00, amortized at $200.00 per unit across 100 units a year for 3 years, inside a packed cost of $740.00. At 50% volume (50 a year), that amortization is $400.00. Wholesale contribution at the 100-a-year base is -$49.50. Own-website contribution of $550.08 does not fund the tool. The BMT-DRONE-FUNDING-WORKSHEET-001 names $250,000.00 (ground rig $100,000.00, bench testing and welfare $75,000.00, engineering and market notes $50,000.00, reserve $25,000.00), stops before production tooling and before any flight, and is not committed. The same sheet says future Drone funding is not secured. The $60,000.00 DRONE-01 / DRONE-18 capsule allowance sits outside that ceiling and is not one of the 33 dated bids. Year-1 commercial units authorized: 0. Assumption for this gate: do not cut a production capsule mold; stay on a bridge capsule.

Explanation: Slides, if the latch undercut needs them, are not inside the $60,000.00, so the allowance is incomplete as a tool price. Alex Meadow is the only person who could authorize the draw, and has not.

Result (Y/N/NA): N

Status: Open — tool not funded

BMT-DRONE-TEMPLATE-COST-SHEET-001 Rev C1 DRONE-01 tooling $60,000.00, amortization $200.00, annual units 100, years 3, packed running total $740.00;

Owner: Alex Meadow

Next action: Simulation and specialist review first. Jordan Vale attaches the 50% volume note so Alex Meadow can refuse the $60,000.00 mold. No tool purchase. Target 2027-06-15.

Reviewer / review date: Pending. Casey Holt, planned 2026-11-01. Tool allowance fails the stop-before-tooling rule.

Item ID: DFM-10

Question: Will gate, knit line, sink, or ejector marks hit a functional or inspection surface?

Answer / assumption: On the capsule, the window (CTQ06) and the latch land (CTQ01) take no gate, heavy knit line, or ejector, and the vent ribs (CTQ02) are a sink risk. On the aircraft, a bond line must not cross a guard spar (DF19) or the latch tang (DF18). Dock contact faces (DF27) are functional; they do not take a cosmetic texture. No moldflow and no composite construction review exist.

Explanation: A supplier offer to texture the dock face, or to gate the capsule window, is a refusal under the cited CTQs. It is written here before anyone bids.

Result (Y/N/NA): N

Status: Open — no moldflow

CTQ01, CTQ02, CTQ06, CTQ18, CTQ19, CTQ27; no moldflow and no ply review. 2026-10-24.

Owner: Jordan Vale

Next action: Simulation and specialist review first. Mark keep-out on the capsule window, guard spars, latch tang, and dock faces. Target 2027-06-15.

Reviewer / review date: Pending. Casey Holt, planned 2026-11-01. Keep-out is intent only. No moldflow is on file.

Item ID: DFM-11

Question: Are wall, draft, rib, and boss sizes inside a named supplier limit?

Answer / assumption: Capsule wall, draft, rib, and boss are unreleased, and no molder has stated a limit. Separately, guard section, carriage gear center distance, and dock contact height have no named supplier limit. The frame is a purchased composite with guards, not an in-house layup, in C1. No handbook number is copied in.

Explanation: The feasibility gate may record these limits as blank. It may not invent a wall thickness for DRONE-01 or a ply count for DRONE-03.

Result (Y/N/NA): N

Status: Open — no supplier limit

BMT-DRONE-CONCEPT-DRAWING-001 Rev C1; RFQ unanswered; DRONE-01 and DRONE-03 with no supplier limit sheet. 2026-10-24.

Owner: Jordan Vale

Next action: Simulation and specialist review first. Add blank limit lines for the capsule mold, the carriage, and the guard section to the unissued BMT-DRONE-RFQ-PACKAGE-001. Target 2027-06-15.

Reviewer / review date: Pending. Casey Holt, planned 2026-11-01. Wall, draft, rib, and boss stay blank.

Item ID: DFM-12

Question: Which undercuts, side actions, inserts, or steel-safe changes are still open?

Answer / assumption: Capsule latch undercut and raised vents may need slides, and those slides are not in the $60,000.00 allowance. Carriage gear undercuts are not broken out on the dated DRONE-02 bids. Those bids are unawarded and are not a side-action price. The second latch path on DRONE-06 stays; deleting it to remove a part reopens DF18 at a proposed RPN of 400. Steel-safe preference on the capsule is extra metal on the latch land. Guard openings are not filled in to make a simpler composite tool.

Explanation: Any slide cost has to be added to the allowance before it can be called a tool price. The allowance is not a quote either way.

Result (Y/N/NA): N

Status: Open — slides not priced

DF18 RPN 400; DF19 RPN 350; BMT-DRONE-TEMPLATE-COST-SHEET-001 DRONE-01 tooling $60,000.00 with no side-action line. 2026-10-24.

Owner: Jordan Vale

Next action: Simulation and specialist review first. List each slide or bond shutoff as keep or redesign, with the CTQ it protects. Target 2027-06-15.

Reviewer / review date: Pending. Casey Holt, planned 2026-11-01. Slides are unnamed. Steel-safe direction is not priced.

Item ID: DFM-13

Question: Can orientation errors and loose hardware be prevented in assembly?

Answer / assumption: Four motor and prop sets have to be clocked so a guard cannot be left off (DF19, proposed RPN 350). The payload latch installs only in the locked orientation (DF18, proposed RPN 400). The battery connector is one way (DF21 and DF27). The field-release door does not share the service-latch motion (DF23, proposed RPN 320). The DRONE-10 fixture has to reject a missing guard or a missing Remote ID device (DF26, proposed RPN 360). No trial has been run.

Explanation: Hardware-in-the-loop labor of $60.00 is the planned detection, and the fixture does not exist. Inspection after the crate is closed will not see a missing guard.

Result (Y/N/NA): N

Status: Open — no wrong-way trial

BMT-DRONE-BOM-001 Rev C1 DRONE-04 qty 4, DRONE-06, DRONE-10; BMT-DRONE-PFMEA-001 Rev C1; DF18, DF19, DF23, DF26; no assembly trial. 2026-10-24.

Owner: Jordan Vale

Next action: Simulation and specialist review first. Put guard-present, latch-locked, and Remote-ID-present on the DRONE-10 station sheet. No flight. Target 2027-06-15.

Reviewer / review date: Pending. Casey Holt, planned 2026-11-01. Poka-yoke is not tried. Occurrence is unchanged.

Item ID: DFM-14

Question: Can the product be washed, serviced, and reassembled without damaging a sealed or energized part?

Answer / assumption: The capsule still washes under CTQ04 and has to leave the aircraft before any wet step, taking the flight battery and controller with the dry side. DRONE-07 is not a user-wash part. Guards have to come off for prop service and the DRONE-10 station has to detect if they stay off. Dock charging is allowed only when contacts align (DF27, proposed RPN 400); service must not bypass that interlock. No ingress rating is claimed.

Explanation: A rinse-the-aircraft instruction would put water on the pack and the dock. That instruction is not authorized. Biological cleaning of the capsule is not claimed.

Result (Y/N/NA): N

Status: Open — wash not run

DF04, DF19, DF21, DF27; CTQ04; no ingress test and no IP rating. 2026-10-24.

Owner: Jordan Vale

Next action: Simulation and specialist review first. Sketch capsule-off-aircraft before wash, and keep every ingress claim off the drawing. Target 2027-06-15.

Reviewer / review date: Pending. Casey Holt, planned 2026-11-01. Service path is intent. No wash record exists.

Item ID: DFM-15

Question: Can every CTQ be measured where the process creates it?

Answer / assumption: Shared capsule methods stay available where the function matches the trap family: cycle rig and 5 N pull (CP01), vent occlusion (CP02), 30 mm finger line (CP03), soil check (CP04), bait pull (CP05), window check (CP06). Aircraft rows still need gauges that are not named: latch retention (CP18), guard gap (CP19), release door shut in the flight attitude (CP23), dock contact position (CP27), and Remote ID present at DRONE-10 (CP26). BMT-DRONE-CONTROL-PLAN-001 calls for 10 prototype units from DRONE-X1-001 through DRONE-X1-010 and one fault-injection rig. The control plan is CP01–CP34. CTQ01–CTQ34 and tests T01–T34 are unrun. Radio-module hold is P18. Field-release door is P25. DRONE-10 labor is not a mechanical gauge. No result is filed.

Explanation: A passing simulation does not close a gauge row. The sheet does not treat hardware-in-the-loop as a substitute for CP18 or CP27.

Result (Y/N/NA): N

Status: Open — gauge not named

BMT-DRONE-CONTROL-PLAN-001 Rev C1 CP01–CP34; BMT-DRONE-CRITICAL-QUALITY-001 Rev C1 CTQ01–CTQ34; BMT-DRONE-TEST-PLAN-001 Rev C1 T01–T34, unrun; BMT-DRONE-PROCESS-FLOW-001 Rev C1

Owner: Jordan Vale

Next action: Simulation and specialist review first. Name the method for CP18, CP19, CP23, CP26, and CP27 before any bench unit is called a result. Target 2027-06-15.

Reviewer / review date: Pending. Casey Holt, planned 2026-11-01. Control-plan methods are unnamed. No result is filed.

Item ID: DFM-16

Question: Do packaging, labels, and secondary operations change the geometry or the cost?

Answer / assumption: DRONE-11 is a protective reusable crate at $30.00 already inside the $740.00 packed cost. A retail mailer is not assumed, because props and guards have to survive the trip. No drop test and no paint spec exist. The capsule lot mark has to survive washing. A second mark on the airframe has to survive handling and must not cover a guard opening or a dock face. Crate weight is not flight weight. Shipping-damage testing remains planned.

Explanation: Adding foam inserts, a paint, or a disposable mailer after the quote changes the packed cost. None of those are authorized.

Result (Y/N/NA): N

Status: Open — no packaging trial

BMT-DRONE-BOM-001 Rev C1 DRONE-11 unit cost $30.00; BMT-DRONE-TEMPLATE-COST-SHEET-001 running total $740.00; BMT-DRONE-CHECK-SHEET-ECONOMICS-001 row ECONOMICS-04; no packaging

Owner: Jordan Vale

Next action: Simulation and specialist review first. Specify crate clearance around guards and props, and hold secondary finish at zero. Target 2027-06-15.

Reviewer / review date: Pending. Casey Holt, planned 2026-11-01. Pack cost is inside the piece. No pack trial exists.

Item ID: DFM-17

Question: Which high-RPN design features must stay if a supplier offers to simplify the tool or the bill of materials?

Answer / assumption: Freeze before a supplier simplifies the BOM: redundant payload latch (DF18, RPN 400), propeller guards (DF19, RPN 350), carriage pinch protection (DF17, RPN 360), protected pack and energy margin (DF21, RPN 480), release door shut in flight (DF23, RPN 320), dock interlock (DF27, RPN 400), Remote ID present (DF26, RPN 360), raised capsule vents (DF02, RPN 252), and the occupancy window (DF06, RPN 432). Highest proposed RPN on that manufacturing list is 480 on DF21. DF24 (RPN 567) and DF25 (RPN 630) are not mold cuts; a weight saving still may not delete the equipment they rely on. Actions are not implemented or tested.

Explanation: Jordan Vale refuses those deletions. Alex Meadow has not been asked to trade them for a lower piece price. No flight hardware is authorized by the refusal either.

Result (Y/N/NA): Y

Status: Recorded — freeze list not signed

BMT-DRONE-DFMEA-001 Rev C1 proposed RPNs as cited for DF02, DF06, DF17, DF18, DF19, DF21, DF23, DF24, DF25, DF26, DF27; actions open. 2026-10-24.

Owner: Jordan Vale

Next action: Simulation and specialist review first. Attach this freeze list to the unissued BMT-DRONE-RFQ-PACKAGE-001 as characteristics the bidder may not remove. Target 2027-06-15.

Reviewer / review date: Pending. Casey Holt, planned 2026-11-01. Freeze list is the refusal rule. Actions stay open.

Item ID: DFM-18

Question: What will the bridge build prove, and what must not be inferred from it?

Answer / assumption: A DRONE-X1 bridge article is a printed capsule and a bench carriage. It is not a flight article. It may check latch fit, whether a guard can be omitted, and unloaded door travel. It must not be read as proof of composite strength, motor and prop match, battery endurance, dock charging, knit lines, or moldability of DRONE-01. A bridge pass is not a first article and is not permission to spend the $60,000.00 tool. No unit has been built.

Explanation: BMT-DRONE-CONTROL-PLAN-001 already withholds reliability inference from 10 prototype units. This row adds the process limit: bridge success does not travel to the production mold or to flight.

Result (Y/N/NA): Y

Status: Recorded — bridge limit not signed

BMT-DRONE-CONTROL-PLAN-001 Rev C1, 10 prototype units and 1 fault-injection rig, no results; planned IDs DRONE-X1-001 through DRONE-X1-010; no build record. 2026-10-24.

Owner: Jordan Vale

Next action: Simulation and specialist review first. Write the bridge-versus-production column, and mark X1 as no-flight, before any unit is made. Target 2027-06-15.

Reviewer / review date: Pending. Casey Holt, planned 2026-11-01. Bridge limit is recorded. It is not a first article.

Drone Trap — Design for Manufacture and Assembly — supporting detail

Drone Trap — What performance and safety requirements drive the design?

Project. Drone Trap

Product revision. C1

Sheet revision. 1

Prepared by. Jordan Vale

Date. 2026-10-24

Target market / jurisdiction. U.S. adults; Wisconsin illustrative base

Decision being prepared. Next private feasibility gate

Sheet. Design for Manufacture and Assembly

Lead. Jordan Vale

Item ID. DFM-01

Question. What performance and safety requirements drive the design?

Evidence to record. Intended use, loads, life, environment, interfaces, applicable market rules and acceptance criteria with sources.

Answer / assumption. R01–R30 and CTQ01–CTQ34 drive the design. The capsule keeps the trap-family features: latch (DF01, RPN 210), raised vents (DF02, RPN 252), 30 mm slider clearance (DF03, RPN 192), washable shell (DF04, RPN 240), captive bait (DF05, RPN 162), and occupancy window (DF06, RPN 432). Aircraft geometry that a supplier must not delete includes the carriage pinch guard (DF17, RPN 360), redundant payload latch (DF18, RPN 400), propeller guards (DF19, RPN 350), protected mission battery (DF21, RPN 480), release door that stays shut in flight (DF23, RPN 320), Remote ID equipment on BMT-DRONE-BOM-001 (DF26, RPN 360), and dock contact alignment (DF27, RPN 400). Navigation and route rows such as DF25 (RPN 630) are not mold features; they still forbid a weight-saving cut that removes the equipment they depend on.

Result (Y/N/NA). Y

Explanation. Simulation and specialist review come before any flight hardware is treated as manufacturable. Proposed RPNs are not test results, and no live animal or flight is authorized by this sheet. DF01–DF30 is not the full DFMEA. The C1 index is DF01–DF60, CTQ01–CTQ34, control plan CP01–CP34, and tests T01–T34, all unrun. Process steps are P01–P34. Capsule latch is P04. Radio-module hold is P18. Field-release door is P25. Residual RPN on the ranking sheet is 8464, the 80% review line is 6771.2, and accepted residual is 0. Year-1 commercial units authorized: 0.

Status. Recorded — requirements listed, untested

Evidence / exact revision / URL and date. BMT-DRONE-SPEC-SHEET-001 Rev C1; BMT-DRONE-DFMEA-001 Rev C1 DF01–DF60; BMT-DRONE-CRITICAL-QUALITY-001 Rev C1 CTQ01–CTQ34; BMT-DRONE-CONTROL-PLAN-001 Rev C1 CP01–CP34; BMT-DRONE-TEST-PLAN-001 Rev C1 T01–T34, unrun; BMT-DRONE-CONCEPT-DRAWING-001 Rev C1; no external evidence. Internal read 2026-10-24.

Owner. Jordan Vale

Next action. Simulation and specialist review first. Trace the capsule CTQs and the aircraft freeze list onto the unreleased C1 layout. No flight article. Target 2027-06-15.

Reviewer / review date. Pending. Casey Holt, planned 2026-11-01. CTQ list is the C1 intent to check. Geometry is not frozen.

Not-applicable reason. Applicable

Source guidance URLs. BMT-DRONE-DFMEA-001 Rev C1; BMT-DRONE-CRITICAL-QUALITY-001 Rev C1; BMT-DRONE-SPEC-SHEET-001 Rev C1

Drone Trap — Does the process fit material, geometry and volume?

Project. Drone Trap

Product revision. C1

Sheet revision. 1

Prepared by. Jordan Vale

Date. 2026-10-24

Target market / jurisdiction. U.S. adults; Wisconsin illustrative base

Decision being prepared. Next private feasibility gate

Sheet. Design for Manufacture and Assembly

Lead. Jordan Vale

Item ID. DFM-02

Question. Does the process fit material, geometry and volume?

Evidence to record. Compare machining, molding, casting, sheet metal, additive or other processes against quantity, finish, lead time, tooling and total cost; identify process-specific risks.

Answer / assumption. Do not treat the aircraft as a PP molding. The only made plastic is DRONE-01, the ventilated capsule, with a $60,000.00 tool allowance. Buy items are DRONE-02 carriage (aluminum and gear, $50.00), DRONE-03 guarded composite frame ($80.00), DRONE-04 motors and props at qty 4 (extended $40.00), DRONE-05 navigation ($105.00), DRONE-06 redundant latch ($30.00), DRONE-07 flight battery ($70.00), DRONE-08 dock ($45.00), DRONE-09 radio ($17.00), and DRONE-11 crate ($30.00). DRONE-10 assembly and hardware-in-the-loop labor is $60.00 in house. The BMT-DRONE-TEMPLATE-COST-SHEET-001 uses 100 units a year for 3 years. Printed capsules and bench carriages are the bridge. A production capsule mold is a weak fit at this volume; see DFM-09. BMT-DRONE-BOM-001 is 21 rows: DRONE-C1-ASSY and DRONE-01 through DRONE-18. Labor is DRONE-10 and tooling is DRONE-18. DRONE-14 remote ID at $18.00 stays out of the piece sum. The buy list above is not the whole bill. Year-1 commercial units authorized: 0.

Result (Y/N/NA). N

Explanation. One hundred a year is a manufacturing sensitivity, not a forecast, and commercial units authorized are 0. Thirty-three dated bids are on file for DRONE-01 through DRONE-11: Fictional Sample Works (Perry Voss, 2026-10-02, valid through 2026-12-31), Fictional Meadow Prototype Shop (Willa Marsh, 2026-10-06, valid through 2026-12-05), and Fictional Northline Molding (Eden Crowe, 2026-10-09, valid through 2027-01-07). None is awarded and none is a purchase order. No composite cure spec, gear class, or motor lead time is on those bids. The $60,000.00 DRONE-01 / DRONE-18 allowance is not one of the bids.

Status. Open — bids on file, process limits blank

Evidence / exact revision / URL and date. BMT-DRONE-BOM-001 Rev C1, 21 rows, DRONE-C1-ASSY and DRONE-01 through DRONE-18; BMT-DRONE-TEMPLATE-QUOTE-COMPARISON-001 Rev C1, 33 unawarded bids dated 2026-10-02, 2026-10-06, and 2026-10-09; BMT-DRONE-TEMPLATE-COST-SHEET-001 annual units 100 and years 3; no cure spec, gear class, or motor lead time on the bids. 2026-10-24.

Owner. Jordan Vale

Next action. Simulation and specialist review first. State against the 33 unawarded bids that only DRONE-01 is a mold question and that 100 a year does not justify steel yet. Leave BMT-DRONE-RFQ-PACKAGE-001 unissued. No flight. Target 2027-06-15.

Reviewer / review date. Pending. Casey Holt, planned 2026-11-01. Volume case is a sensitivity. No process is accepted.

Not-applicable reason. Applicable

Source guidance URLs. BMT-DRONE-BOM-001 Rev C1; BMT-DRONE-TEMPLATE-COST-SHEET-001 Rev C1

Drone Trap — Are features realistic for the chosen process?

Project. Drone Trap

Product revision. C1

Sheet revision. 1

Prepared by. Jordan Vale

Date. 2026-10-24

Target market / jurisdiction. U.S. adults; Wisconsin illustrative base

Decision being prepared. Next private feasibility gate

Sheet. Design for Manufacture and Assembly

Lead. Jordan Vale

Item ID. DFM-03

Question. Are features realistic for the chosen process?

Evidence to record. For molding: walls, draft, ribs/bosses, undercuts, shrinkage and ejection. For machining: tool access, deep pockets and corner radii. For sheet metal: bends, radii and hole spacing. Obtain the actual supplier’s limits; no universal wall/draft number.

Answer / assumption. Capsule features are unapproved: draft, wall, vent steel, and latch undercuts. Aircraft features are also unapproved: guard opening versus a finger (DF19), carriage pinch geometry (DF17), dock contact height (DF27), and a latch that keeps a second load path (DF18). The composite frame and the gear carriage are purchased geometry with no datums. A printed capsule will not show knit lines, guard strength, or contact alignment.

Result (Y/N/NA). N

Explanation. No supplier limit exists for the mold, the composite, or the machined carriage. Handbook numbers are not adopted.

Status. Open — supplier limits blank

Evidence / exact revision / URL and date. BMT-DRONE-CONCEPT-DRAWING-001 Rev C1; DF17, DF18, DF19, DF27 proposed; BMT-DRONE-RFQ-PACKAGE-001 capability questions unanswered; no moldflow and no ply review. 2026-10-24.

Owner. Jordan Vale

Next action. Simulation and specialist review first. Split the open-feature list into capsule steel, carriage, guards, and dock contacts. Target 2027-06-15.

Reviewer / review date. Pending. Casey Holt, planned 2026-11-01. Feature list is open. No supplier limit is adopted.

Not-applicable reason. Applicable

Source guidance URLs. BMT-DRONE-CONCEPT-DRAWING-001 Rev C1; BMT-DRONE-RFQ-PACKAGE-001 Rev C1

Drone Trap — Are tolerances functional and inspectable?

Project. Drone Trap

Product revision. C1

Sheet revision. 1

Prepared by. Jordan Vale

Date. 2026-10-24

Target market / jurisdiction. U.S. adults; Wisconsin illustrative base

Decision being prepared. Next private feasibility gate

Sheet. Design for Manufacture and Assembly

Lead. Jordan Vale

Item ID. DFM-04

Question. Are tolerances functional and inspectable?

Evidence to record. Critical dimensions, datums, fits, tolerance stack-ups, finishes and inspection methods. Avoid needless tight tolerances; specify those required for function or safety.

Answer / assumption. Capsule fits still proposed, and not on a drawing, are the latch stack (CTQ01, 100 dry cycles and 5 N) and the 30 mm finger line (CTQ03). Aircraft fits with no released number are payload-latch retention (CTQ18), guard gap (CTQ19), release-door closed gap in the flight attitude (CTQ23), and dock contact position (CTQ27). Stacks have to include PP shrink on the capsule, composite variation on the frame, and gear backlash on the carriage. No gauge repeatability study exists.

Result (Y/N/NA). N

Explanation. Nominal CAD is not the tolerance. Features that do not serve those CTQs stay reference so they are not purchased tight.

Status. Open — no dimensioned drawing

Evidence / exact revision / URL and date. BMT-DRONE-CRITICAL-QUALITY-001 Rev C1 CTQ01, CTQ03, CTQ18, CTQ19, CTQ23, CTQ27; BMT-DRONE-DFMEA-001 Rev C1; no dimensioned drawing. 2026-10-24.

Owner. Jordan Vale

Next action. Simulation and specialist review first. Balloon only the cited CTQs and mark aircraft datums as unreleased. Target 2027-06-15.

Reviewer / review date. Pending. Casey Holt, planned 2026-11-01. No datum is released. Tight tolerances are not purchased.

Not-applicable reason. Applicable

Source guidance URLs. BMT-DRONE-CRITICAL-QUALITY-001 Rev C1; BMT-DRONE-DFMEA-001 Rev C1

Drone Trap — Can the parts be assembled consistently?

Project. Drone Trap

Product revision. C1

Sheet revision. 1

Prepared by. Jordan Vale

Date. 2026-10-24

Target market / jurisdiction. U.S. adults; Wisconsin illustrative base

Decision being prepared. Next private feasibility gate

Sheet. Design for Manufacture and Assembly

Lead. Jordan Vale

Item ID. DFM-05

Question. Can the parts be assembled consistently?

Evidence to record. Reduce unnecessary parts/fasteners, use standard components, access tools, orient and locate parts, prevent wrong assembly, protect wires/seals and test service/disassembly.

Answer / assumption. The stack is capsule to DRONE-06 redundant latch, latch to carriage, carriage to frame, four guarded motor sets, battery connector, and dock. Connectors are keyed. A propeller must not install on an unguarded position. The field-release door (DF23) must not use the same motion as a service latch. DRONE-10 hardware-in-the-loop is a required station, not a repair step. BMT-DRONE-BOM-001 Rev C1 has 21 rows: assembly DRONE-C1-ASSY plus DRONE-01 through DRONE-18, including labor DRONE-10, tooling DRONE-18, and the roll-up. It is not an eleven-line bill. Nothing has been built or timed.

Result (Y/N/NA). N

Explanation. Process steps are P01–P34. Capsule latch is P04. Radio-module hold is P18. Field-release door is P25. PFMEA has 102 data rows, PF01–PF99 (plus crate-close submodes PF99-A/PF99-B/PF99-C; 102 rows). The cause line is still assembly or configuration error. A missed guard is DF19 at a proposed RPN of 350.

Status. Open — no build trial

Evidence / exact revision / URL and date. BMT-DRONE-BOM-001 Rev C1, 21 rows, DRONE-C1-ASSY and DRONE-01 through DRONE-18; BMT-DRONE-PROCESS-FLOW-001 Rev C1 P01–P34, capsule latch at P04, radio-module hold at P18, field-release door at P25; BMT-DRONE-PFMEA-001 Rev C1, 102 data rows, PF01–PF99 (plus crate-close submodes PF99-A/PF99-B/PF99-C; 102 rows); DRONE-10 labor $60.00 untimed; no build record. 2026-10-24.

Owner. Jordan Vale

Next action. Simulation and specialist review first. Define the keyed latch, guard, and battery connector on the assembly sketch before any bench unit. No flight. Target 2027-06-15.

Reviewer / review date. Pending. Casey Holt, planned 2026-11-01. Assembly intent is not a witnessed build.

Not-applicable reason. Applicable

Source guidance URLs. BMT-DRONE-BOM-001 Rev C1; BMT-DRONE-PROCESS-FLOW-001 Rev C1; BMT-DRONE-PFMEA-001 Rev C1

Drone Trap — Can material or supplier substitutions change performance?

Project. Drone Trap

Product revision. C1

Sheet revision. 1

Prepared by. Jordan Vale

Date. 2026-10-24

Target market / jurisdiction. U.S. adults; Wisconsin illustrative base

Decision being prepared. Next private feasibility gate

Sheet. Design for Manufacture and Assembly

Lead. Jordan Vale

Item ID. DFM-06

Question. Can material or supplier substitutions change performance?

Evidence to record. Material/grade, flame/contact/corrosion requirements, finishes, standard hardware and qualified equivalents. Preserve designer catalog references separately from purchasing sources.

Answer / assumption. Do not substitute capsule resin, propeller, guard, cell, antenna, or latch sensor without a regression on the affected requirement. DRONE-04 is qty 4 and is not a single-motor alternate. DRONE-07 stays a protected lithium pack (DF21, proposed RPN 480). DRONE-09 radio and the Remote ID device (DF26, proposed RPN 360) are not optional weight reductions. DRONE-06 keeps its second latch path (DF18, proposed RPN 400). Dock contact material is part of DF27 (proposed RPN 400).

Result (Y/N/NA). N

Explanation. Designer catalog lines stay separate from purchasing sources. No approved equivalent exists. A cheaper unprotected cell is a refusal, not a purchasing saving.

Status. Open — no approved alternate

Evidence / exact revision / URL and date. BMT-DRONE-BOM-001 Rev C1 DRONE-01, DRONE-04, DRONE-06, DRONE-07, DRONE-09; DF18, DF21, DF26, DF27; no alternate list. 2026-10-24.

Owner. Jordan Vale

Next action. Simulation and specialist review first. Write allowed-part lines for resin, prop, guard, cell, antenna, latch sensor, and Remote ID. Target 2027-06-15.

Reviewer / review date. Pending. Casey Holt, planned 2026-11-01. Substitution ban is recorded. No alternate is approved.

Not-applicable reason. Applicable

Source guidance URLs. BMT-DRONE-BOM-001 Rev C1; BMT-DRONE-TEMPLATE-COST-SHEET-001 Rev C1

Drone Trap — Are the files complete and at one revision?

Project. Drone Trap

Product revision. C1

Sheet revision. 1

Prepared by. Jordan Vale

Date. 2026-10-24

Target market / jurisdiction. U.S. adults; Wisconsin illustrative base

Decision being prepared. Next private feasibility gate

Sheet. Design for Manufacture and Assembly

Lead. Jordan Vale

Item ID. DFM-07

Question. Are the files complete and at one revision?

Evidence to record. Bill of materials, STEP solid and dimensioned drawings where applicable, materials/finishes, critical characteristics, assembly notes, quantity breaks and inspection/acceptance requirements. A render is not a release package.

Answer / assumption. BMT-DRONE-BOM-001, BMT-DRONE-TEMPLATE-COST-SHEET-001, BMT-DRONE-DFMEA-001, BMT-DRONE-CONTROL-PLAN-001, R01–R30, and this sheet are all marked C1. There is no released STEP set, no wiring diagram, no dimensioned drawing, and no ballooned CTQ print. The 100-a-year case, the 50% case, and the 200% case are sensitivity only. A render is not the release package.

Result (Y/N/NA). N

Explanation. Design freeze is not claimed. Twenty-one BOM rows, DRONE-C1-ASSY and DRONE-01 through DRONE-18, share a revision label, and the manufacturing file set is missing.

Status. Blocked — no released CAD

Evidence / exact revision / URL and date. BMT-DRONE-SPEC-SHEET-001 Rev C1; BMT-DRONE-CONCEPT-DRAWING-001 Rev C1; BMT-DRONE-BOM-001 Rev C1, 21 rows, DRONE-C1-ASSY and DRONE-01 through DRONE-18; no CAD revision. 2026-10-24.

Owner. Jordan Vale

Next action. Simulation and specialist review first. List the missing C1 files, including wiring and the guard drawing, and keep the pack unreleased. Target 2027-06-15.

Reviewer / review date. Pending. Casey Holt, planned 2026-11-01. Revision label is C1. Manufacturing files are missing.

Not-applicable reason. Applicable

Source guidance URLs. BMT-DRONE-BOM-001 Rev C1; BMT-DRONE-TEMPLATE-COST-SHEET-001 Rev C1; BMT-DRONE-CONCEPT-DRAWING-001 Rev C1

Drone Trap — What did the manufacturer flag, and who accepted changes?

Project. Drone Trap

Product revision. C1

Sheet revision. 1

Prepared by. Jordan Vale

Date. 2026-10-24

Target market / jurisdiction. U.S. adults; Wisconsin illustrative base

Decision being prepared. Next private feasibility gate

Sheet. Design for Manufacture and Assembly

Lead. Jordan Vale

Item ID. DFM-08

Question. What did the manufacturer flag, and who accepted changes?

Evidence to record. Dated supplier DFM feedback, disposition, affected requirements, cost/tooling impact, owner and verification/retest. Obtain review before releasing revised work.

Answer / assumption. No manufacturer has flagged a change, and nobody has accepted one. Fictional Sample Works is not selected. Thirty-three dated bids are on file and unawarded; they are not a DFM markup and not a purchase order. BMT-DRONE-RFQ-PACKAGE-001 is not issued, and its capability questions are still unanswered. A later markup needs a date, the CTQ touched, the dollar or tool impact, and acceptance by Alex Meadow. None of that exists.

Result (Y/N/NA). NA

Explanation. The DRONE-01 / DRONE-18 capsule figure of $60,000.00 is an invented tooling allowance, not a quote, and it sits outside the $250,000.00 research ceiling. The Drone allowance of $250,000.00 is not secured, is not drawn, and stops before production tooling and before any flight. Year-1 commercial units authorized: 0.

Status. No DFM markup on file

Evidence / exact revision / URL and date. BMT-DRONE-TEMPLATE-QUOTE-COMPARISON-001 Rev C1, 33 unawarded bids, no purchase order; BMT-DRONE-RFQ-PACKAGE-001 Rev C1 not issued, capability questions unanswered; BMT-DRONE-TEMPLATE-COST-SHEET-001 tooling $60,000.00, invented allowance not a bid; BMT-DRONE-FUNDING-WORKSHEET-001 $250,000.00 not funded or committed, future Drone funding not secured. 2026-10-24.

Owner. Jordan Vale

Next action. Simulation and specialist review first. Leave BMT-DRONE-RFQ-PACKAGE-001 unissued until DFM-03 and DFM-09 are filled in. No tool purchase and no flight. Target 2027-06-15.

Reviewer / review date. Pending. Casey Holt, planned 2026-11-01. No supplier markup exists. Nothing is accepted.

Not-applicable reason. Price bids are on file and unawarded. No DFM markup has been accepted, so there is no markup to disposition.

Source guidance URLs. BMT-DRONE-RFQ-PACKAGE-001 Rev C1; BMT-DRONE-FUNDING-WORKSHEET-001 Rev C1

Drone Trap — Does the tooling spend fit the funded allowance and the volume used to amortize it?

Project. Drone Trap

Product revision. C1

Sheet revision. 1

Prepared by. Jordan Vale

Date. 2026-10-24

Target market / jurisdiction. U.S. adults; Wisconsin illustrative base

Decision being prepared. Next private feasibility gate

Sheet. Design for Manufacture and Assembly

Lead. Jordan Vale

Item ID. DFM-09

Question. Does the tooling spend fit the funded allowance and the volume used to amortize it?

Evidence to record. Tool identity, cavity count, ownership, allowance versus any quote, funded cash and the stop-before-tooling rule, annual units and years used for amortization, packed unit cost at the stated volume and at half volume, and who may authorize a purchase.

Answer / assumption. DRONE-01 allowance is $60,000.00, amortized at $200.00 per unit across 100 units a year for 3 years, inside a packed cost of $740.00. At 50% volume (50 a year), that amortization is $400.00. Wholesale contribution at the 100-a-year base is -$49.50. Own-website contribution of $550.08 does not fund the tool. The BMT-DRONE-FUNDING-WORKSHEET-001 names $250,000.00 (ground rig $100,000.00, bench testing and welfare $75,000.00, engineering and market notes $50,000.00, reserve $25,000.00), stops before production tooling and before any flight, and is not committed. The same sheet says future Drone funding is not secured. The $60,000.00 DRONE-01 / DRONE-18 capsule allowance sits outside that ceiling and is not one of the 33 dated bids. Year-1 commercial units authorized: 0. Assumption for this gate: do not cut a production capsule mold; stay on a bridge capsule.

Result (Y/N/NA). N

Explanation. Slides, if the latch undercut needs them, are not inside the $60,000.00, so the allowance is incomplete as a tool price. Alex Meadow is the only person who could authorize the draw, and has not.

Status. Open — tool not funded

Evidence / exact revision / URL and date. BMT-DRONE-TEMPLATE-COST-SHEET-001 Rev C1 DRONE-01 tooling $60,000.00, amortization $200.00, annual units 100, years 3, packed running total $740.00; BMT-DRONE-CHECK-SHEET-ECONOMICS-001 row ECONOMICS-03; BMT-DRONE-CHECK-SHEET-ECONOMICS-001 row ECONOMICS-06 wholesale -$49.50 and website $550.08; BMT-DRONE-FUNDING-WORKSHEET-001 $250,000.00. 2026-10-24.

Owner. Alex Meadow

Next action. Simulation and specialist review first. Jordan Vale attaches the 50% volume note so Alex Meadow can refuse the $60,000.00 mold. No tool purchase. Target 2027-06-15.

Reviewer / review date. Pending. Casey Holt, planned 2026-11-01. Tool allowance fails the stop-before-tooling rule.

Not-applicable reason. Applicable

Source guidance URLs. BMT-DRONE-TEMPLATE-COST-SHEET-001 Rev C1; BMT-DRONE-CHECK-SHEET-ECONOMICS-001 Rev C1; BMT-DRONE-FUNDING-WORKSHEET-001 Rev C1

Drone Trap — Will gate, knit line, sink, or ejector marks hit a functional or inspection surface?

Project. Drone Trap

Product revision. C1

Sheet revision. 1

Prepared by. Jordan Vale

Date. 2026-10-24

Target market / jurisdiction. U.S. adults; Wisconsin illustrative base

Decision being prepared. Next private feasibility gate

Sheet. Design for Manufacture and Assembly

Lead. Jordan Vale

Item ID. DFM-10

Question. Will gate, knit line, sink, or ejector marks hit a functional or inspection surface?

Evidence to record. Proposed gate, bond, or witness location; knit or weld line versus latch, window, and other datums; sink at ribs and bosses; surfaces that are cosmetic, optical, or functional. A moldflow or construction review is evidence. A render is not.

Answer / assumption. On the capsule, the window (CTQ06) and the latch land (CTQ01) take no gate, heavy knit line, or ejector, and the vent ribs (CTQ02) are a sink risk. On the aircraft, a bond line must not cross a guard spar (DF19) or the latch tang (DF18). Dock contact faces (DF27) are functional; they do not take a cosmetic texture. No moldflow and no composite construction review exist.

Result (Y/N/NA). N

Explanation. A supplier offer to texture the dock face, or to gate the capsule window, is a refusal under the cited CTQs. It is written here before anyone bids.

Status. Open — no moldflow

Evidence / exact revision / URL and date. CTQ01, CTQ02, CTQ06, CTQ18, CTQ19, CTQ27; no moldflow and no ply review. 2026-10-24.

Owner. Jordan Vale

Next action. Simulation and specialist review first. Mark keep-out on the capsule window, guard spars, latch tang, and dock faces. Target 2027-06-15.

Reviewer / review date. Pending. Casey Holt, planned 2026-11-01. Keep-out is intent only. No moldflow is on file.

Not-applicable reason. Applicable

Source guidance URLs. BMT-DRONE-CRITICAL-QUALITY-001 Rev C1; BMT-DRONE-CONCEPT-DRAWING-001 Rev C1

Drone Trap — Are wall, draft, rib, and boss sizes inside a named supplier limit?

Project. Drone Trap

Product revision. C1

Sheet revision. 1

Prepared by. Jordan Vale

Date. 2026-10-24

Target market / jurisdiction. U.S. adults; Wisconsin illustrative base

Decision being prepared. Next private feasibility gate

Sheet. Design for Manufacture and Assembly

Lead. Jordan Vale

Item ID. DFM-11

Question. Are wall, draft, rib, and boss sizes inside a named supplier limit?

Evidence to record. Nominal wall, thin-to-thick ratio, draft by surface, rib and boss size versus wall, corner radii, and the named supplier's written limit. Do not copy a universal wall or draft number. Record machining or composite limits the same way when the part is not molded.

Answer / assumption. Capsule wall, draft, rib, and boss are unreleased, and no molder has stated a limit. Separately, guard section, carriage gear center distance, and dock contact height have no named supplier limit. The frame is a purchased composite with guards, not an in-house layup, in C1. No handbook number is copied in.

Result (Y/N/NA). N

Explanation. The feasibility gate may record these limits as blank. It may not invent a wall thickness for DRONE-01 or a ply count for DRONE-03.

Status. Open — no supplier limit

Evidence / exact revision / URL and date. BMT-DRONE-CONCEPT-DRAWING-001 Rev C1; RFQ unanswered; DRONE-01 and DRONE-03 with no supplier limit sheet. 2026-10-24.

Owner. Jordan Vale

Next action. Simulation and specialist review first. Add blank limit lines for the capsule mold, the carriage, and the guard section to the unissued BMT-DRONE-RFQ-PACKAGE-001. Target 2027-06-15.

Reviewer / review date. Pending. Casey Holt, planned 2026-11-01. Wall, draft, rib, and boss stay blank.

Not-applicable reason. Applicable

Source guidance URLs. BMT-DRONE-RFQ-PACKAGE-001 Rev C1; BMT-DRONE-CONCEPT-DRAWING-001 Rev C1

Drone Trap — Which undercuts, side actions, inserts, or steel-safe changes are still open?

Project. Drone Trap

Product revision. C1

Sheet revision. 1

Prepared by. Jordan Vale

Date. 2026-10-24

Target market / jurisdiction. U.S. adults; Wisconsin illustrative base

Decision being prepared. Next private feasibility gate

Sheet. Design for Manufacture and Assembly

Lead. Jordan Vale

Item ID. DFM-12

Question. Which undercuts, side actions, inserts, or steel-safe changes are still open?

Evidence to record. Each undercut, side action, insert, or shutoff; the requirement it serves; steel-safe or bond-safe direction; added tool or fixture cost; and the failure mode reopened if the feature is deleted to simplify the process.

Answer / assumption. Capsule latch undercut and raised vents may need slides, and those slides are not in the $60,000.00 allowance. Carriage gear undercuts are not broken out on the dated DRONE-02 bids. Those bids are unawarded and are not a side-action price. The second latch path on DRONE-06 stays; deleting it to remove a part reopens DF18 at a proposed RPN of 400. Steel-safe preference on the capsule is extra metal on the latch land. Guard openings are not filled in to make a simpler composite tool.

Result (Y/N/NA). N

Explanation. Any slide cost has to be added to the allowance before it can be called a tool price. The allowance is not a quote either way.

Status. Open — slides not priced

Evidence / exact revision / URL and date. DF18 RPN 400; DF19 RPN 350; BMT-DRONE-TEMPLATE-COST-SHEET-001 DRONE-01 tooling $60,000.00 with no side-action line. 2026-10-24.

Owner. Jordan Vale

Next action. Simulation and specialist review first. List each slide or bond shutoff as keep or redesign, with the CTQ it protects. Target 2027-06-15.

Reviewer / review date. Pending. Casey Holt, planned 2026-11-01. Slides are unnamed. Steel-safe direction is not priced.

Not-applicable reason. Applicable

Source guidance URLs. BMT-DRONE-DFMEA-001 Rev C1; BMT-DRONE-TEMPLATE-COST-SHEET-001 Rev C1

Drone Trap — Can orientation errors and loose hardware be prevented in assembly?

Project. Drone Trap

Product revision. C1

Sheet revision. 1

Prepared by. Jordan Vale

Date. 2026-10-24

Target market / jurisdiction. U.S. adults; Wisconsin illustrative base

Decision being prepared. Next private feasibility gate

Sheet. Design for Manufacture and Assembly

Lead. Jordan Vale

Item ID. DFM-13

Question. Can orientation errors and loose hardware be prevented in assembly?

Evidence to record. Part count, standard versus special hardware, keyed or captive features, wrong-way trials, tool access, wires and seals, and a timed build at the planned station. Link each credible error to the PFMEA row.

Answer / assumption. Four motor and prop sets have to be clocked so a guard cannot be left off (DF19, proposed RPN 350). The payload latch installs only in the locked orientation (DF18, proposed RPN 400). The battery connector is one way (DF21 and DF27). The field-release door does not share the service-latch motion (DF23, proposed RPN 320). The DRONE-10 fixture has to reject a missing guard or a missing Remote ID device (DF26, proposed RPN 360). No trial has been run.

Result (Y/N/NA). N

Explanation. Hardware-in-the-loop labor of $60.00 is the planned detection, and the fixture does not exist. Inspection after the crate is closed will not see a missing guard.

Status. Open — no wrong-way trial

Evidence / exact revision / URL and date. BMT-DRONE-BOM-001 Rev C1 DRONE-04 qty 4, DRONE-06, DRONE-10; BMT-DRONE-PFMEA-001 Rev C1; DF18, DF19, DF23, DF26; no assembly trial. 2026-10-24.

Owner. Jordan Vale

Next action. Simulation and specialist review first. Put guard-present, latch-locked, and Remote-ID-present on the DRONE-10 station sheet. No flight. Target 2027-06-15.

Reviewer / review date. Pending. Casey Holt, planned 2026-11-01. Poka-yoke is not tried. Occurrence is unchanged.

Not-applicable reason. Applicable

Source guidance URLs. BMT-DRONE-PFMEA-001 Rev C1; BMT-DRONE-BOM-001 Rev C1

Drone Trap — Can the product be washed, serviced, and reassembled without damaging a sealed or energized part?

Project. Drone Trap

Product revision. C1

Sheet revision. 1

Prepared by. Jordan Vale

Date. 2026-10-24

Target market / jurisdiction. U.S. adults; Wisconsin illustrative base

Decision being prepared. Next private feasibility gate

Sheet. Design for Manufacture and Assembly

Lead. Jordan Vale

Item ID. DFM-14

Question. Can the product be washed, serviced, and reassembled without damaging a sealed or energized part?

Evidence to record. Tool-free steps, wet zone versus sealed or energized parts, battery and electronics removal, fastener reuse, and the wash or service sequence. Do not claim an ingress rating without a test record.

Answer / assumption. The capsule still washes under CTQ04 and has to leave the aircraft before any wet step, taking the flight battery and controller with the dry side. DRONE-07 is not a user-wash part. Guards have to come off for prop service and the DRONE-10 station has to detect if they stay off. Dock charging is allowed only when contacts align (DF27, proposed RPN 400); service must not bypass that interlock. No ingress rating is claimed.

Result (Y/N/NA). N

Explanation. A rinse-the-aircraft instruction would put water on the pack and the dock. That instruction is not authorized. Biological cleaning of the capsule is not claimed.

Status. Open — wash not run

Evidence / exact revision / URL and date. DF04, DF19, DF21, DF27; CTQ04; no ingress test and no IP rating. 2026-10-24.

Owner. Jordan Vale

Next action. Simulation and specialist review first. Sketch capsule-off-aircraft before wash, and keep every ingress claim off the drawing. Target 2027-06-15.

Reviewer / review date. Pending. Casey Holt, planned 2026-11-01. Service path is intent. No wash record exists.

Not-applicable reason. Applicable

Source guidance URLs. BMT-DRONE-DFMEA-001 Rev C1; BMT-DRONE-CONTROL-PLAN-001 Rev C1

Drone Trap — Can every CTQ be measured where the process creates it?

Project. Drone Trap

Product revision. C1

Sheet revision. 1

Prepared by. Jordan Vale

Date. 2026-10-24

Target market / jurisdiction. U.S. adults; Wisconsin illustrative base

Decision being prepared. Next private feasibility gate

Sheet. Design for Manufacture and Assembly

Lead. Jordan Vale

Item ID. DFM-15

Question. Can every CTQ be measured where the process creates it?

Evidence to record. Each CTQ, its datum, gauge or method, sample size, whether the characteristic is still reachable after the next operation, and the control-plan row. A control-plan line with no gauge is not a result.

Answer / assumption. Shared capsule methods stay available where the function matches the trap family: cycle rig and 5 N pull (CP01), vent occlusion (CP02), 30 mm finger line (CP03), soil check (CP04), bait pull (CP05), window check (CP06). Aircraft rows still need gauges that are not named: latch retention (CP18), guard gap (CP19), release door shut in the flight attitude (CP23), dock contact position (CP27), and Remote ID present at DRONE-10 (CP26). BMT-DRONE-CONTROL-PLAN-001 calls for 10 prototype units from DRONE-X1-001 through DRONE-X1-010 and one fault-injection rig. The control plan is CP01–CP34. CTQ01–CTQ34 and tests T01–T34 are unrun. Radio-module hold is P18. Field-release door is P25. DRONE-10 labor is not a mechanical gauge. No result is filed.

Result (Y/N/NA). N

Explanation. A passing simulation does not close a gauge row. The sheet does not treat hardware-in-the-loop as a substitute for CP18 or CP27.

Status. Open — gauge not named

Evidence / exact revision / URL and date. BMT-DRONE-CONTROL-PLAN-001 Rev C1 CP01–CP34; BMT-DRONE-CRITICAL-QUALITY-001 Rev C1 CTQ01–CTQ34; BMT-DRONE-TEST-PLAN-001 Rev C1 T01–T34, unrun; BMT-DRONE-PROCESS-FLOW-001 Rev C1 P01–P34, radio-module hold at P18; planned IDs DRONE-X1-001 through DRONE-X1-010; DRONE-10 process cost $60.00; no measurement record. 2026-10-24.

Owner. Jordan Vale

Next action. Simulation and specialist review first. Name the method for CP18, CP19, CP23, CP26, and CP27 before any bench unit is called a result. Target 2027-06-15.

Reviewer / review date. Pending. Casey Holt, planned 2026-11-01. Control-plan methods are unnamed. No result is filed.

Not-applicable reason. Applicable

Source guidance URLs. BMT-DRONE-CONTROL-PLAN-001 Rev C1; BMT-DRONE-CRITICAL-QUALITY-001 Rev C1; BMT-DRONE-TEST-MATRIX-001 Rev C1

Drone Trap — Do packaging, labels, and secondary operations change the geometry or the cost?

Project. Drone Trap

Product revision. C1

Sheet revision. 1

Prepared by. Jordan Vale

Date. 2026-10-24

Target market / jurisdiction. U.S. adults; Wisconsin illustrative base

Decision being prepared. Next private feasibility gate

Sheet. Design for Manufacture and Assembly

Lead. Jordan Vale

Item ID. DFM-16

Question. Do packaging, labels, and secondary operations change the geometry or the cost?

Evidence to record. Carton or crate, label and lot-mark location, surfaces the mark must not cover, secondary operations and their cost, and whether that cost is already inside the packed unit cost. Note any drop or damage trial as planned or done.

Answer / assumption. DRONE-11 is a protective reusable crate at $30.00 already inside the $740.00 packed cost. A retail mailer is not assumed, because props and guards have to survive the trip. No drop test and no paint spec exist. The capsule lot mark has to survive washing. A second mark on the airframe has to survive handling and must not cover a guard opening or a dock face. Crate weight is not flight weight. Shipping-damage testing remains planned.

Result (Y/N/NA). N

Explanation. Adding foam inserts, a paint, or a disposable mailer after the quote changes the packed cost. None of those are authorized.

Status. Open — no packaging trial

Evidence / exact revision / URL and date. BMT-DRONE-BOM-001 Rev C1 DRONE-11 unit cost $30.00; BMT-DRONE-TEMPLATE-COST-SHEET-001 running total $740.00; BMT-DRONE-CHECK-SHEET-ECONOMICS-001 row ECONOMICS-04; no packaging trial. 2026-10-24.

Owner. Jordan Vale

Next action. Simulation and specialist review first. Specify crate clearance around guards and props, and hold secondary finish at zero. Target 2027-06-15.

Reviewer / review date. Pending. Casey Holt, planned 2026-11-01. Pack cost is inside the piece. No pack trial exists.

Not-applicable reason. Applicable

Source guidance URLs. BMT-DRONE-BOM-001 Rev C1; BMT-DRONE-CHECK-SHEET-ECONOMICS-001 Rev C1

Drone Trap — Which high-RPN design features must stay if a supplier offers to simplify the tool or the bill of materials?

Project. Drone Trap

Product revision. C1

Sheet revision. 1

Prepared by. Jordan Vale

Date. 2026-10-24

Target market / jurisdiction. U.S. adults; Wisconsin illustrative base

Decision being prepared. Next private feasibility gate

Sheet. Design for Manufacture and Assembly

Lead. Jordan Vale

Item ID. DFM-17

Question. Which high-RPN design features must stay if a supplier offers to simplify the tool or the bill of materials?

Evidence to record. DFMEA ID, proposed RPN, feature, the simplification a supplier might offer, the requirement that simplification would break, and the person who must refuse it. State that the ratings are proposed and untested.

Answer / assumption. Freeze before a supplier simplifies the BOM: redundant payload latch (DF18, RPN 400), propeller guards (DF19, RPN 350), carriage pinch protection (DF17, RPN 360), protected pack and energy margin (DF21, RPN 480), release door shut in flight (DF23, RPN 320), dock interlock (DF27, RPN 400), Remote ID present (DF26, RPN 360), raised capsule vents (DF02, RPN 252), and the occupancy window (DF06, RPN 432). Highest proposed RPN on that manufacturing list is 480 on DF21. DF24 (RPN 567) and DF25 (RPN 630) are not mold cuts; a weight saving still may not delete the equipment they rely on. Actions are not implemented or tested.

Result (Y/N/NA). Y

Explanation. Jordan Vale refuses those deletions. Alex Meadow has not been asked to trade them for a lower piece price. No flight hardware is authorized by the refusal either.

Status. Recorded — freeze list not signed

Evidence / exact revision / URL and date. BMT-DRONE-DFMEA-001 Rev C1 proposed RPNs as cited for DF02, DF06, DF17, DF18, DF19, DF21, DF23, DF24, DF25, DF26, DF27; actions open. 2026-10-24.

Owner. Jordan Vale

Next action. Simulation and specialist review first. Attach this freeze list to the unissued BMT-DRONE-RFQ-PACKAGE-001 as characteristics the bidder may not remove. Target 2027-06-15.

Reviewer / review date. Pending. Casey Holt, planned 2026-11-01. Freeze list is the refusal rule. Actions stay open.

Not-applicable reason. Applicable

Source guidance URLs. BMT-DRONE-DFMEA-001 Rev C1

Drone Trap — What will the bridge build prove, and what must not be inferred from it?

Project. Drone Trap

Product revision. C1

Sheet revision. 1

Prepared by. Jordan Vale

Date. 2026-10-24

Target market / jurisdiction. U.S. adults; Wisconsin illustrative base

Decision being prepared. Next private feasibility gate

Sheet. Design for Manufacture and Assembly

Lead. Jordan Vale

Item ID. DFM-18

Question. What will the bridge build prove, and what must not be inferred from it?

Evidence to record. Bridge process, unit-ID series, which CTQs the bridge article can exercise, which production features it cannot represent, and the rule that a bridge pass is not first-article acceptance and not tool authorization.

Answer / assumption. A DRONE-X1 bridge article is a printed capsule and a bench carriage. It is not a flight article. It may check latch fit, whether a guard can be omitted, and unloaded door travel. It must not be read as proof of composite strength, motor and prop match, battery endurance, dock charging, knit lines, or moldability of DRONE-01. A bridge pass is not a first article and is not permission to spend the $60,000.00 tool. No unit has been built.

Result (Y/N/NA). Y

Explanation. BMT-DRONE-CONTROL-PLAN-001 already withholds reliability inference from 10 prototype units. This row adds the process limit: bridge success does not travel to the production mold or to flight.

Status. Recorded — bridge limit not signed

Evidence / exact revision / URL and date. BMT-DRONE-CONTROL-PLAN-001 Rev C1, 10 prototype units and 1 fault-injection rig, no results; planned IDs DRONE-X1-001 through DRONE-X1-010; no build record. 2026-10-24.

Owner. Jordan Vale

Next action. Simulation and specialist review first. Write the bridge-versus-production column, and mark X1 as no-flight, before any unit is made. Target 2027-06-15.

Reviewer / review date. Pending. Casey Holt, planned 2026-11-01. Bridge limit is recorded. It is not a first article.

Not-applicable reason. Applicable

Source guidance URLs. BMT-DRONE-CONTROL-PLAN-001 Rev C1; BMT-DRONE-TEST-PLAN-001 Rev C1

Document administration

Scope. DRONE-C1 capsule DRONE-01 and the buy-item airframe. Bridge serials DRONE-X1-001 through DRONE-X1-010, none built. No flight article. Capsule tooling allowance $60,000.00. The $250,000.00 research allowance is unfunded and stops before production tooling. Year-1 commercial units authorized: 0.

Team. Alex Meadow, packet owner and no-flight gate; Jordan Vale, flight research; Sam Reed, mechanical interface; Robin Keel, animal-welfare reviewer

Approved by. review pending. Alex Meadow, Planning draft C1, unsigned. The $250,000.00 research allowance is not drawn. Year-1 commercial units authorized: 0.

Preparation: Jordan Vale, scenario attribution, 2026-10-24. Signature: unsigned. Review: pending; no reviewer signature or date. Approval: withheld; no approver signature or date.

Prepared byDate
Reviewed byDate
Approved byDate