- Company
- The Better Mouse Trap Co.
- Project / product line
- Hotel trap
- Document
- Mouse Hotel — Customer evidence, marketing and launch
- Document no.
- BMT-HOTEL-CHECK-SHEET-LAUNCH-001
- Revision
- C1
- Status
- Planning draft
- Start date
- 2026-10-24
- Revision date
- 2026-10-24
- Prepared by / owner
- Jordan Vale, Hotel electronics, HOTEL-C1
- Checklist ID
- BMT-HOTEL-CHECK-SHEET-LAUNCH-001, Rev C1
- Scope
- Mouse Hotel launch readiness only.
- Reviewer
- Sam Reed, cross-read of the shell, the channel loss, and the barred claims. Not a sign-off.
- Review date
- 2026-11-01. The next internal check is 2027-02-15. No Hotel review has been held.
- Team
- Alex Meadow, packet owner; Jordan Vale, Hotel electronics; Sam Reed, mechanical reference; Robin Keel, animal-welfare reviewer
- Approved by
- review pending. Alex Meadow has not consented to a Hotel release. Planning draft C1.
| Item / review question | Answer / finding | Result / status | Evidence | Responsibility / action |
|---|---|---|---|---|
Item ID: LAUNCH-01 Question: Who is the first customer and why will they switch? | Answer / assumption: First segment on BMT-HOTEL-MARKET-CHECK-001 is small-property managers, and the register now has names. BMT-HOTEL-TEMPLATE-MARKET-EVIDENCE-001 holds 16 rows from 2026-08-04 through 2026-10-22. Eight are Grade B problem interviews. Ruth Penner (ME-H-01) pays a service at $85.00 a visit, about six visits a year, $510.00, and would trial one unit at $129.00 if inspection stays manual. Chris Dalloway (ME-H-02) would glance during a room pass, would not carry an occupied trap through the lobby, and stated Not applicable — no transaction in this planning record. Omar Lind (ME-H-03) named $129.00, then $90.00 after he was told the room check still happens. Etta Varn (ME-H-04) kept a $1,200.00 contract and refused to add $129.00. Switching off the service is not observed. Hotel has no 20-interview gate. Grade B on this register is 8. The Basic 20-interview gate does not apply. SG-07 is Hotel panel short of release. Explanation: Eight Grade B notes separate the payer from the person on the night round, which is the split BMT-HOTEL-MARKET-CHECK-001 requires. An alert request is not that split. G0 is private planning only. G5 on BMT-HOTEL-STAGE-GATES-001 is no launch authorized. The manager segment is not a served market. These 8 Grade B notes are not a release gate, and Hotel does not use a count of 20. | Result (Y/N/NA): N Status: Open — 8 Grade B interviews; no 20-interview gate | BMT-HOTEL-TEMPLATE-MARKET-EVIDENCE-001, ME-H-01 through ME-H-16, 2026-08-04 through 2026-10-22; BMT-HOTEL-MARKET-CHECK-001, 16 panels, Grade B 8, not a 20-interview gate; | Owner: Jordan Vale Next action: Do not score Hotel against a 20-interview gate. Keep property size, who checks, last method, minutes, and dollars on the notes already filed. Do not infer switching from an alert request. The 2027-02-15 scenario review is planned. Reviewer / review date: Pending. Sam Reed, planned 2026-11-01. The review has not been held. Findings remain pending. |
Item ID: LAUNCH-02 Question: Which offer and price have we tested? | Answer / assumption: $129.00 MSRP excluding sales tax is not a cleared offer. Five price choices are on the Grade A cards of BMT-HOTEL-TEMPLATE-MARKET-EVIDENCE-001: Cleo Abbott (ME-H-06) chose $129.00 over $99.00 and $159.00; Harris Boone (ME-H-07) chose $99.00 and refused $129.00; Dana Crowe (ME-H-08) chose $109.65; Felix Marr (ME-H-09) chose one case, 6 times $116.00, which is $696.00; Simon Kee (ME-H-11) refused prepay and put Not applicable — no transaction in this planning record on the page. Helen Cho (ME-H-12) is Grade A wording with no price. Victor Lang (ME-H-13) and Ben Arkell (ME-H-15) are Grade B interviews, not price choices. Victor Lang stated a monthly fee of Not applicable — no transaction in this planning record. Ben Arkell named the $70.95 wholesale illustration, which is not an invoice and not an order. No sales offer or checkout has run. Website 3% and Amazon 15% are invented fee assumptions. The $6.00 cloud figure is still a reserve, not a fee anyone accepted. Hardware sell-in $70.95 is not a purchase order. Acquisition allowance is Not applicable — no transaction in this planning record. Explanation: A marked card is not paid conversion. Ten further blinded tests are not a Hotel gate. The written protocol is not issued. Lane Corwin has not been contacted. A manager who likes an alert has not taken a price test. The monthly line at Not applicable — no transaction in this planning record means the cloud reserve cannot be written as a subscription. | Result (Y/N/NA): Y Status: Recorded — card choices filed, no checkout | BMT-HOTEL-TEMPLATE-MARKET-EVIDENCE-001 price choices ME-H-06, ME-H-07, ME-H-08, ME-H-09, and ME-H-11; ME-H-12 wording with no price; BMT-HOTEL-TEMPLATE-PRICING-TERMS-001; | Owner: Jordan Vale Next action: Draft the protocol for the cards already filed, including a cloud-fee line the buyer can refuse. Hold a public page for IP clearance. Do not spend. Target 2027-02-15. Reviewer / review date: Pending. Sam Reed, planned 2026-11-01. The review has not been held. Findings remain pending. |
Item ID: LAUNCH-03 Question: What claims can we support? | Answer / assumption: Only design intent can be described for HOTEL-C1. No certified humane, detection-reliability, capacity, or flight claim. Also barred: the alert replaces inspection; three mice are held safely; Wi-Fi is reliable; the pack is certified; the radio is authorized; the account is private. CTQ01–CTQ20 are proposed and untested. Tests T01–T20 are unrun. DFMEA is DF01–DF32. PFMEA is PF01–PF60. Named lines inside that set include occupancy sensor CTQ08, alert queue CTQ09, BLE CTQ10, firmware CTQ11, pack CTQ12, adapter CTQ13, cloud CTQ14, radio CTQ15, and crowded chamber CTQ16. BMT-HOTEL-LAUNCH-WORKSHEET-001 requires offline manual inspection; alerts only supplement checks. Capacity is not rated. No photo, endorsement, or FCC grant is on file. Explanation: A claim-to-evidence list has to carry a blank evidence cell for every sentence above. Robin Keel has not reviewed welfare wording. The legal role has not reviewed disclosure, privacy copy, or IP. BMT-HOTEL-INSTRUCTIONS-AND-WARNINGS-001 is unreviewed. | Result (Y/N/NA): N Status: Open — connected claims untested | BMT-HOTEL-CRITICAL-QUALITY-001 CTQ01–CTQ20, 2026-10-24; tests T01–T20 unrun; BMT-HOTEL-SPEC-SHEET-001 HOTEL-C1; BMT-HOTEL-LAUNCH-WORKSHEET-001 offline inspection line; | Owner: Jordan Vale Next action: File the barred-claim list. Alex Meadow holds publication. No specialist review is scheduled. Target 2027-02-15. Reviewer / review date: Pending. Sam Reed, planned 2026-11-01. The review has not been held. Findings remain pending. |
Item ID: LAUNCH-04 Question: Which channel fits customer and economics? | Answer / assumption: Own-website learning pilot is the only channel in the model with a positive contribution that does not depend on a marketplace fee, and it is still not authorized. Hardware wholesale does not fit: sell-in $70.95, contribution -$3.17, no break-even. Amazon merchant fulfillment contribution is $26.53 at a $129.00 price only under invented fees (selling/fulfillment $31.35) and is contingent on terms, readiness, and the radio evidence. Not Vendor Central and not a license. Drone Trap is research only and is not this offer. Website contribution $45.01 needs 667 units to cover $30,000.00 allocated fixed; Amazon needs 1131. Cash packed $42.00; amortized packed $58.67 at 600 a year for 3 years. Morgan Hale and Remy Sol are not contacted. Explanation: Putting HOTEL-C1 into independent hardware at the current sell-in would plan a loss before acquisition and before the $6.00 cloud reserve is tested. The 300/600/1200 band is a cost sensitivity. Downside company cash excludes all revenue. No buyer behavior has been observed. | Result (Y/N/NA): Y Status: Recorded — hardware route is a loss | BMT-HOTEL-CHANNEL-ECONOMICS-001, 2026-10-24; BMT-HOTEL-CHECK-SHEET-ECONOMICS-001 contributions; BMT-HOTEL-CHECK-SHEET-RETAIL-001; BMT-COMPANY-TEMPLATE-PEOPLE-001 Morgan Hale and | Owner: Jordan Vale Next action: Keep the hardware route closed at -$3.17. Do not open a website cart or an Amazon account. Target 2027-02-15. Reviewer / review date: Pending. Sam Reed, planned 2026-11-01. The review has not been held. Findings remain pending. |
Item ID: LAUNCH-05 Question: Are launch materials and operations ready? | Answer / assumption: Not ready. Draft only: BMT-HOTEL-SPEC-SHEET-001 (HOTEL-C1, proposed 320 × 180 × 160 mm and 1.2 kg, unmeasured; Wi-Fi/Bluetooth module and OS versions unverified), BMT-HOTEL-INSTRUCTIONS-AND-WARNINGS-001 unreviewed, warranty draft not offered. Missing: origin, GTIN (none invented), insurance certificate, FCC and battery evidence, W-9, photos, support path, returns address, and a cloud-service description. BMT-HOTEL-BUYER-PACKET-001 records the gaps. Proposed case 6 and MOQ 12 are not a purchase order. The BMT-HOTEL-TEMPLATE-PRICING-TERMS-001 line still says drone not offered, which also means this sheet does not bundle DRONE-C1. G4 is no purchase order. Explanation: Listing an unmeasured 1.2 kg connected product, or implying an authorized radio, would publish particulars the spec marks unverified. BMT-HOTEL-LAUNCH-WORKSHEET-001 status is draft, no listing created. | Result (Y/N/NA): N Status: Open — radio and listing incomplete | BMT-HOTEL-BUYER-PACKET-001, 2026-10-24; BMT-HOTEL-SPEC-SHEET-001; BMT-HOTEL-LAUNCH-WORKSHEET-001; BMT-HOTEL-CRITICAL-QUALITY-001 CTQ12–CTQ15; BMT-HOTEL-STAGE-GATES-001 G4 | Owner: Jordan Vale Next action: Leave identifiers, photos, and the support inbox uncreated. Do not state a ship weight. Target 2027-02-15. Reviewer / review date: Pending. Sam Reed, planned 2026-11-01. The review has not been held. Findings remain pending. |
Item ID: LAUNCH-06 Question: What does a small launch have to prove? | Answer / assumption: Proposed first lot is 50 units after a later release. It is not authorized and the targets are not achieved: return rate under 5% ($6.45 reserve is 5% of $129.00) and zero welfare incidents. Illustration if 50 website units were packed: cash $42.00 × 50 = $2,100.00; return reserve $322.50; cloud reserve $6.00 × 50 = $300.00, which is not a hosting contract; website contribution $45.01 × 50 = $2,250.50 before acquisition. That lot is far under the 667 website units needed to cover $30,000.00 fixed. A hardware lot would plan 50 × -$3.17 = -$158.50 before cloud and acquisition. No conversion, review, or stock figure exists. Stop rule: unacceptable welfare failure or negative viable-channel contribution, before tooling. Explanation: Fifty units cannot prove alert reliability, privacy, battery behavior, or fixed-cost coverage. The $30,000.00 tool is three-year amortization at 600 units, not a released tool. BMT-HOTEL-FUNDING-WORKSHEET-001 $60,000.00 allowance is not committed. G5 is no launch authorized. | Result (Y/N/NA): N Status: Open — 50-unit lot is not a proof | BMT-HOTEL-MARKET-CHECK-001, 2026-10-24; BMT-HOTEL-CHANNEL-ECONOMICS-001; BMT-HOTEL-FUNDING-WORKSHEET-001; BMT-HOTEL-STAGE-GATES-001 G4 and G5 | Owner: Jordan Vale Next action: Write the stop rule for returns, a welfare incident, a false-empty alert, and negative contribution. Do not order 50 units. Review 2027-02-15. Reviewer / review date: Pending. Sam Reed, planned 2026-11-01. The review has not been held. Findings remain pending. |
Item ID: LAUNCH-07 Question: Who does what after launch? | Answer / assumption: Alex Meadow owns support, returns, and claim review. Sam Reed owns mechanical issues (CTQ01–CTQ07 and CTQ16: door, vents, slider, shell, bait pocket, inspection, baffle, crowded chamber). Jordan Vale owns the app, alert queue, BLE, firmware, pack, adapter, cloud account, and radio (CTQ08–CTQ15). The CTQ set is CTQ01–CTQ20. CTQ17–CTQ20 are untested and have no accepted owner. No hours, inbox, spare boards, replenishment rule, or scale decision is dated. Privacy complaints have no owner beyond Jordan's planned role, and that role has not started. All three people are not started. Publication is not permitted. Explanation: Connected-product support is not the same queue as a mechanical return. A dark alert (CTQ09, CTQ11) is a welfare escalation to Robin Keel, not a software ticket to close later. Robin Keel has not been contacted. The company is not formed, so nobody can yet accept a return in its name. | Result (Y/N/NA): N Status: Open — three queues are not staffed | BMT-COMPANY-TEMPLATE-PEOPLE-001, 2026-10-24; BMT-HOTEL-CRITICAL-QUALITY-001 CTQ01–CTQ20, all untested; the owner split below is a planning note and is not started; | Owner: Jordan Vale Next action: Split the unopened queue into mechanical, electrical, and welfare. Alex Meadow confirms no publication. Target 2027-02-15. Reviewer / review date: Pending. Sam Reed, planned 2026-11-01. The review has not been held. Findings remain pending. |
Item ID: LAUNCH-08 Question: What problem evidence is on file, separate from a manager's interest in alerts? | Answer / assumption: Eight Grade B problem interviews are on file, separate from Grade A price cards. Ruth Penner pays and would keep manual inspection. Chris Dalloway checks and does not pay. Omar Lind asked for a phone alert, then cut $129.00 to $90.00 when told the room check remains. Etta Varn will keep a $1,200.00 contract and stated Not applicable — no transaction in this planning record for a unit this year. Paula Greer (ME-H-10) stated $168.00 for two units at $84.00. Gil Phelps (ME-H-05) is Grade C: about 20 minutes on a complaint, no dollar figure. Rita Solano (ME-H-14) is Grade D and put the $129.00 card down. Interest in an alert is not counted as the problem note. Explanation: An alert sentence pulls the speaker onto the product. The Grade B notes stay on the last method, who pays, and who checks. Hotel has no 20-interview gate. Grade B is 8. Do not read that count against a gate of 20. Grade A cards stay in the price row. | Result (Y/N/NA): Y Status: Recorded — 8 problem interviews filed | BMT-HOTEL-TEMPLATE-MARKET-EVIDENCE-001 Grade B rows ME-H-01, ME-H-02, ME-H-03, ME-H-04, ME-H-10, ME-H-13, ME-H-15, and ME-H-16; BMT-HOTEL-MARKET-CHECK-001 | Owner: Jordan Vale Next action: File further problem notes only after the interviews occur. Do not backfill from the design scenario or from a price card. Review 2027-02-15. Reviewer / review date: Pending. Sam Reed, planned 2026-11-01. The review has not been held. Findings remain pending. |
Item ID: LAUNCH-09 Question: Is a blinded price test specified for the $129.00 device and the cloud reserve, and has it run? | Answer / assumption: A written protocol is not on file. Blinded price cards on file are five: Cleo Abbott (ME-H-06) chose $129.00 from $99.00, $129.00, and $159.00; Harris Boone (ME-H-07) chose $99.00 and refused $129.00; Dana Crowe (ME-H-08) chose $109.65; Felix Marr (ME-H-09) chose one case at 6 times $116.00; Simon Kee (ME-H-11) refused prepay at Not applicable — no transaction in this planning record. Helen Cho (ME-H-12) is wording with no price. The $6.00 cloud reserve was not accepted as a monthly fee. Victor Lang (ME-H-13) is Grade B and stated Not applicable — no transaction in this planning record a month. No budget is released. The $12,000.00 engineering and market slice of the $60,000.00 allowance is not committed. Device-only and device-plus-fee are still not written as two offers with a success measure. Explanation: BMT-HOTEL-TEMPLATE-PRICING-TERMS-001 still treats willingness to pay as not a single cleared figure. Running a further test at a property before Lane Corwin is engaged would be a public use, and a camera or account on that card would be an unreviewed privacy disclosure. The cards already filed stay internal. | Result (Y/N/NA): N Status: Open — cards ran without a written protocol | BMT-HOTEL-TEMPLATE-MARKET-EVIDENCE-001 price choices ME-H-06, ME-H-07, ME-H-08, ME-H-09, and ME-H-11; ME-H-12 wording with no price; BMT-HOTEL-MARKET-CHECK-001; | Owner: Jordan Vale Next action: Write two offers, device only and device plus a stated service fee, against the cards already filed. No ad account. Target 2027-02-15. Reviewer / review date: Pending. Sam Reed, planned 2026-11-01. The review has not been held. Findings remain pending. |
Item ID: LAUNCH-10 Question: Which claims are barred because the connected features are untested? | Answer / assumption: Barred: checks itself, replaces rounds, or safe to leave (CTQ06, CTQ08, CTQ09); holds three mice or any capacity (spec not rated; CTQ16); no false-empty (CTQ08 target, including dust, is not a result); Wi-Fi or app reliability (CTQ09, CTQ11); child-safe or pet-safe (CTQ05); humane or escape-proof (CTQ01, CTQ02, CTQ07); certified pack or adapter (CTQ12, CTQ13); FCC authorized or grant-pending as a boast (CTQ15; no grant); private, encrypted, or breach-proof (CTQ10, CTQ14). If an alert is ever described, the same artifact must say offline manual inspection is required and alerts only supplement checks. Explanation: BMT-HOTEL-LAUNCH-WORKSHEET-001 already carries the inspection sentence as design intent, not as a tested instruction. Copy that drops it would contradict CTQ06. No endorsement quote exists to disclose. | Result (Y/N/NA): Y Status: Recorded — connected claims barred | BMT-HOTEL-CRITICAL-QUALITY-001 CTQ06–CTQ16, 2026-10-24; BMT-HOTEL-LAUNCH-WORKSHEET-001; BMT-HOTEL-SPEC-SHEET-001 connectivity unverified; BMT-HOTEL-TEST-MATRIX-001 no FCC file | Owner: Jordan Vale Next action: Attach the barred list to the draft sell sheet and keep the sell sheet unpublished. Target 2027-02-15. Reviewer / review date: Pending. Sam Reed, planned 2026-11-01. The review has not been held. Findings remain pending. |
Item ID: LAUNCH-11 Question: What must be finished before a name, account screen, or property photo is public? | Answer / assumption: Public use is held. No name beyond HOTEL-C1 is cleared. Lane Corwin has not been contacted and has given no patentability opinion. The prior-art log dated 2026-10-21 holds 16 fictitious citations (USPTO Patent Public Search 7, Espacenet 8, sample non-patent folder 1). There is no word-folder citation. That log is not a novelty opinion or freedom to operate. No trademark search is on file. No photograph of a device or of a property is allowed; a property photo would imply a pilot that has not happened. [email protected] is not a live support or privacy-contact address. An app store listing, a waitlist, and a crowdfunding page are unchosen and remain inside the hold. Alex Meadow has not authorized publication. Explanation: A screen recording of a fake occupancy alert is a performance claim and a disclosure. G5 is no launch authorized. The hold does not wait for a counsel engagement that has not been approved. | Result (Y/N/NA): Y Status: Held — public use closed | BMT-HOTEL-TEMPLATE-PRIOR-ART-001, 16 citations, search date 2026-10-21; BMT-COMPANY-TEMPLATE-PEOPLE-001 Lane Corwin not contacted, public use held, 2026-10-24; | Owner: Alex Meadow Next action: No page, no screen recording, no photographer. This sheet does not authorize contacting counsel. Recheck 2027-02-15. Reviewer / review date: Pending. Sam Reed, planned 2026-11-01. The review has not been held. Findings remain pending. |
Item ID: LAUNCH-12 Question: Are GTIN, origin, insurance, radio evidence, and tax identity ready to ship? | Answer / assumption: None are ready. No GTIN is invented. Origin is blank because no bid is awarded and no purchase order exists. Twenty-four dated bids are on file and unawarded: Fictional Sample Works (Perry Voss, 2026-09-19, valid through 2026-12-18), Fictional Meadow Prototype Shop (Willa Marsh, 2026-09-23, valid through 2026-11-22), and Fictional Northline Molding (Eden Crowe, 2026-09-30, valid through 2026-12-29), parts HOTEL-01 through HOTEL-08. BMT-COMPANY-INSURANCE-REQUEST-001 is unbound; Nia Calder has not been contacted; 2026-12-01 is a broker-packet target, not a certificate. No FCC authorization, no battery test, no UN 38.3 file. W-9 is not stored. BMT-HOTEL-BUYER-PACKET-001 says battery transport documents are reviewed separately where applicable, and that review has not started. SDS is not applicable to a chemical product; the pack is still an open transport question. No seller of record. Explanation: HOTEL-C1 cannot ship as a plain mechanical article. CTQ12 and CTQ15 are the blocks. A wholesale case of 6 would multiply an uninsured lithium shipment. | Result (Y/N/NA): N Status: Open — radio and identity missing | BMT-HOTEL-BUYER-PACKET-001, 2026-10-24; BMT-HOTEL-CRITICAL-QUALITY-001 CTQ12, CTQ13, CTQ15; BMT-COMPANY-INSURANCE-REQUEST-001 unbound; BMT-HOTEL-TEMPLATE-QUOTE-COMPARISON-001, 24 | Owner: Alex Meadow Next action: Do not buy a barcode, do not book a carrier, and do not request a certificate number. Recheck 2027-02-15. Reviewer / review date: Pending. Sam Reed, planned 2026-11-01. The review has not been held. Findings remain pending. |
Item ID: LAUNCH-13 Question: What does a 50-unit illustration cost, and why is hardware the wrong lot? | Answer / assumption: Not ordered. Website illustration: cash $2,100.00, return reserve $322.50, cloud reserve $300.00, contribution $2,250.50 before acquisition, versus 667 units to cover $30,000.00. Hardware illustration at the same 50 units plans a -$158.50 contribution before cloud and acquisition, so a hardware pilot is not a learning design at the $70.95 sell-in. Amazon illustration is not usable until the $31.35 fulfillment figure is a real rate. The lot cannot support tooling, a property contract, or a demand claim. Explanation: The $60,000.00 feasibility allowance (prototype/rig $24,000.00, welfare $18,000.00, engineering/market $12,000.00, reserve $6,000.00) stops before production tooling and is not committed. Ordering 50 units would jump G4. | Result (Y/N/NA): Y Status: Recorded — hardware lot refused | BMT-HOTEL-CHANNEL-ECONOMICS-001, 2026-10-24; BMT-HOTEL-FUNDING-WORKSHEET-001; BMT-HOTEL-STAGE-GATES-001 G4; BMT-HOTEL-TEMPLATE-PRICING-TERMS-001 MOQ 12 not released | Owner: Jordan Vale Next action: Keep both the website lot and the hardware lot unbought. Review the arithmetic at 2027-02-15. Reviewer / review date: Pending. Sam Reed, planned 2026-11-01. The review has not been held. Findings remain pending. |
Item ID: LAUNCH-14 Question: How are returns, dark alerts, privacy complaints, and welfare incidents escalated? | Answer / assumption: No inbox is open. Proposed split, not staffed: Alex Meadow logs the return and the words used in any reply; Sam Reed takes door, vent, slider, shell, baffle, and chamber damage; Jordan Vale takes a dark or late alert, a firmware update that hides occupancy, a pack or adapter event, and an account complaint. Any animal distress or a missed occupied chamber stops shipments and goes to Robin Keel, who has not been contacted. Warranty draft is manufacturing defect only, one year, not offered. Under 5% returns is not a measured rate. Explanation: CTQ09 and CTQ11 turn a software fault into a welfare fault if the chamber is occupied. Treating it as an ordinary ticket would miss the BMT-HOTEL-MARKET-CHECK-001 stop rule. There is no replenishment plan because there is no stock. | Result (Y/N/NA): N Status: Open — escalation log is empty | BMT-HOTEL-CRITICAL-QUALITY-001 CTQ08, CTQ09, CTQ11, CTQ14, 2026-10-24; BMT-HOTEL-MARKET-CHECK-001 stop signal; BMT-COMPANY-TEMPLATE-PEOPLE-001 Robin Keel not contacted | Owner: Alex Meadow Next action: Draft the four-column log with zero rows. Do not publish a support address. Target 2027-02-15. Reviewer / review date: Pending. Sam Reed, planned 2026-11-01. The review has not been held. Findings remain pending. |
Item ID: LAUNCH-15 Question: What stop rule is dated for a later pilot, and who can halt shipments? | Answer / assumption: Proposed, unmeasured: returns at or above 5% of shipped units; any welfare incident; any false-empty on an occupied chamber in the pilot log; contribution at or below Not applicable — no transaction in this planning record on the website offer after real fees replace the 3% assumption; any hardware order, because that route is already -$3.17; any claim outside the barred list. Jordan Vale brings the product log. Alex Meadow halts spend and shipments. Review date 2027-02-15 is planned and has not been held. The 300/600/1200 band is a cost sensitivity, not the stop target. Explanation: G5 is no launch authorized. This rule does not create a pilot. It stops one from continuing if a later gate ever opens a lot. Cloud-reserve spend is not evidence that a service is priced. | Result (Y/N/NA): Y Status: Recorded — stop rule dated, pilot closed | BMT-HOTEL-MARKET-CHECK-001, 2026-10-24; BMT-HOTEL-CHANNEL-ECONOMICS-001 hardware -$3.17; BMT-HOTEL-STAGE-GATES-001 G5 | Owner: Alex Meadow Next action: Put the thresholds on the 2027-02-15 agenda. Spend stays Not applicable — no transaction in this planning record. Reviewer / review date: Pending. Sam Reed, planned 2026-11-01. The review has not been held. Findings remain pending. |
Item ID: LAUNCH-16 Question: Is the Hotel launch funded, and what spend is forbidden? | Answer / assumption: Not funded. BMT-HOTEL-FUNDING-WORKSHEET-001 is a $60,000.00 feasibility allowance, status not committed, and it says future Hotel/Drone funding is not secured. Split: prototype/rig $24,000.00, specialist testing/welfare $18,000.00, engineering/market $12,000.00, reserve $6,000.00, stop before production tooling. Acquisition allowance Not applicable — no transaction in this planning record. Forbidden: tooling, a 50-unit or MOQ-12 purchase order, GTIN, marketplace fees, a cloud account with a card on file, photography at a property, ads, samples to Morgan Hale, and preorders. Explanation: The $12,000.00 engineering/market line is not a launch budget. Using it to open a cart would spend feasibility funds as if G5 had moved. | Result (Y/N/NA): Y Status: Held — launch spend is Not applicable — no transaction in this planning record | BMT-HOTEL-FUNDING-WORKSHEET-001, 2026-10-24; BMT-HOTEL-CHANNEL-ECONOMICS-001; BMT-HOTEL-STAGE-GATES-001 G1 and G5 | Owner: Alex Meadow Next action: Record launch spend as Not applicable — no transaction in this planning record at the planned 2027-02-15 review. Do not attach a card to a cloud or ad account. Reviewer / review date: Pending. Sam Reed, planned 2026-11-01. The review has not been held. Findings remain pending. |
Mouse Hotel — Customer Evidence, Marketing and Launch — supporting detail
Mouse Hotel — Who is the first customer and why will they switch?
Project. Mouse Hotel
Product revision. C1
Sheet revision. 1
Prepared by. Jordan Vale
Date. 2026-10-24
Target market / jurisdiction. U.S. adults; Wisconsin illustrative base
Decision being prepared. Next private feasibility gate
Sheet. Customer Evidence, Marketing and Launch
Lead. Jordan Vale
Item ID. LAUNCH-01
Question. Who is the first customer and why will they switch?
Evidence to record. Narrow segment, use case, alternatives, differentiated benefit and evidence from interviews/tests.
Answer / assumption. First segment on BMT-HOTEL-MARKET-CHECK-001 is small-property managers, and the register now has names. BMT-HOTEL-TEMPLATE-MARKET-EVIDENCE-001 holds 16 rows from 2026-08-04 through 2026-10-22. Eight are Grade B problem interviews. Ruth Penner (ME-H-01) pays a service at $85.00 a visit, about six visits a year, $510.00, and would trial one unit at $129.00 if inspection stays manual. Chris Dalloway (ME-H-02) would glance during a room pass, would not carry an occupied trap through the lobby, and stated Not applicable — no transaction in this planning record. Omar Lind (ME-H-03) named $129.00, then $90.00 after he was told the room check still happens. Etta Varn (ME-H-04) kept a $1,200.00 contract and refused to add $129.00. Switching off the service is not observed. Hotel has no 20-interview gate. Grade B on this register is 8. The Basic 20-interview gate does not apply. SG-07 is Hotel panel short of release.
Result (Y/N/NA). N
Explanation. Eight Grade B notes separate the payer from the person on the night round, which is the split BMT-HOTEL-MARKET-CHECK-001 requires. An alert request is not that split. G0 is private planning only. G5 on BMT-HOTEL-STAGE-GATES-001 is no launch authorized. The manager segment is not a served market. These 8 Grade B notes are not a release gate, and Hotel does not use a count of 20.
Status. Open — 8 Grade B interviews; no 20-interview gate
Evidence / exact revision / URL and date. BMT-HOTEL-TEMPLATE-MARKET-EVIDENCE-001, ME-H-01 through ME-H-16, 2026-08-04 through 2026-10-22; BMT-HOTEL-MARKET-CHECK-001, 16 panels, Grade B 8, not a 20-interview gate; BMT-HOTEL-STAGE-GATES-001 G0 and G5
Owner. Jordan Vale
Next action. Do not score Hotel against a 20-interview gate. Keep property size, who checks, last method, minutes, and dollars on the notes already filed. Do not infer switching from an alert request. The 2027-02-15 scenario review is planned.
Reviewer / review date. Pending. Sam Reed, planned 2026-11-01. The review has not been held. Findings remain pending.
Not-applicable reason. Applicable
Source guidance URLs. FTC advertising substantiation guidance; SBA pricing notes; GS1 identifier notes
Mouse Hotel — Which offer and price have we tested?
Project. Mouse Hotel
Product revision. C1
Sheet revision. 1
Prepared by. Jordan Vale
Date. 2026-10-24
Target market / jurisdiction. U.S. adults; Wisconsin illustrative base
Decision being prepared. Next private feasibility gate
Sheet. Customer Evidence, Marketing and Launch
Lead. Jordan Vale
Item ID. LAUNCH-02
Question. Which offer and price have we tested?
Evidence to record. Actual experiment, audience, price, offer, budget, duration and success measure. Separate paid conversion and repeat use from views/likes or expressions of interest.
Answer / assumption. $129.00 MSRP excluding sales tax is not a cleared offer. Five price choices are on the Grade A cards of BMT-HOTEL-TEMPLATE-MARKET-EVIDENCE-001: Cleo Abbott (ME-H-06) chose $129.00 over $99.00 and $159.00; Harris Boone (ME-H-07) chose $99.00 and refused $129.00; Dana Crowe (ME-H-08) chose $109.65; Felix Marr (ME-H-09) chose one case, 6 times $116.00, which is $696.00; Simon Kee (ME-H-11) refused prepay and put Not applicable — no transaction in this planning record on the page. Helen Cho (ME-H-12) is Grade A wording with no price. Victor Lang (ME-H-13) and Ben Arkell (ME-H-15) are Grade B interviews, not price choices. Victor Lang stated a monthly fee of Not applicable — no transaction in this planning record. Ben Arkell named the $70.95 wholesale illustration, which is not an invoice and not an order. No sales offer or checkout has run. Website 3% and Amazon 15% are invented fee assumptions. The $6.00 cloud figure is still a reserve, not a fee anyone accepted. Hardware sell-in $70.95 is not a purchase order. Acquisition allowance is Not applicable — no transaction in this planning record.
Result (Y/N/NA). Y
Status. Recorded — card choices filed, no checkout
Evidence / exact revision / URL and date. BMT-HOTEL-TEMPLATE-MARKET-EVIDENCE-001 price choices ME-H-06, ME-H-07, ME-H-08, ME-H-09, and ME-H-11; ME-H-12 wording with no price; BMT-HOTEL-TEMPLATE-PRICING-TERMS-001; BMT-HOTEL-CHANNEL-ECONOMICS-001 cloud reserve $6.00; BMT-HOTEL-MARKET-CHECK-001; BMT-COMPANY-TEMPLATE-PEOPLE-001 Lane Corwin not contacted
Owner. Jordan Vale
Next action. Draft the protocol for the cards already filed, including a cloud-fee line the buyer can refuse. Hold a public page for IP clearance. Do not spend. Target 2027-02-15.
Reviewer / review date. Pending. Sam Reed, planned 2026-11-01. The review has not been held. Findings remain pending.
Not-applicable reason. Applicable
Source guidance URLs. FTC advertising substantiation guidance; SBA pricing notes; GS1 identifier notes
Mouse Hotel — What claims can we support?
Project. Mouse Hotel
Product revision. C1
Sheet revision. 1
Prepared by. Jordan Vale
Date. 2026-10-24
Target market / jurisdiction. U.S. adults; Wisconsin illustrative base
Decision being prepared. Next private feasibility gate
Sheet. Customer Evidence, Marketing and Launch
Lead. Jordan Vale
Item ID. LAUNCH-03
Question. What claims can we support?
Evidence to record. Claim-to-evidence list, demonstrations, endorsements/disclosures, product photos and instructions; the legal role reviews disclosure/IP concerns before publishing.
Answer / assumption. Only design intent can be described for HOTEL-C1. No certified humane, detection-reliability, capacity, or flight claim. Also barred: the alert replaces inspection; three mice are held safely; Wi-Fi is reliable; the pack is certified; the radio is authorized; the account is private. CTQ01–CTQ20 are proposed and untested. Tests T01–T20 are unrun. DFMEA is DF01–DF32. PFMEA is PF01–PF60. Named lines inside that set include occupancy sensor CTQ08, alert queue CTQ09, BLE CTQ10, firmware CTQ11, pack CTQ12, adapter CTQ13, cloud CTQ14, radio CTQ15, and crowded chamber CTQ16. BMT-HOTEL-LAUNCH-WORKSHEET-001 requires offline manual inspection; alerts only supplement checks. Capacity is not rated. No photo, endorsement, or FCC grant is on file.
Result (Y/N/NA). N
Explanation. A claim-to-evidence list has to carry a blank evidence cell for every sentence above. Robin Keel has not reviewed welfare wording. The legal role has not reviewed disclosure, privacy copy, or IP. BMT-HOTEL-INSTRUCTIONS-AND-WARNINGS-001 is unreviewed.
Status. Open — connected claims untested
Evidence / exact revision / URL and date. BMT-HOTEL-CRITICAL-QUALITY-001 CTQ01–CTQ20, 2026-10-24; tests T01–T20 unrun; BMT-HOTEL-SPEC-SHEET-001 HOTEL-C1; BMT-HOTEL-LAUNCH-WORKSHEET-001 offline inspection line; BMT-HOTEL-TEST-MATRIX-001 no reports and no FCC grant
Owner. Jordan Vale
Next action. File the barred-claim list. Alex Meadow holds publication. No specialist review is scheduled. Target 2027-02-15.
Reviewer / review date. Pending. Sam Reed, planned 2026-11-01. The review has not been held. Findings remain pending.
Not-applicable reason. Applicable
Source guidance URLs. FTC advertising substantiation guidance; SBA pricing notes; GS1 identifier notes
Mouse Hotel — Which channel fits customer and economics?
Project. Mouse Hotel
Product revision. C1
Sheet revision. 1
Prepared by. Jordan Vale
Date. 2026-10-24
Target market / jurisdiction. U.S. adults; Wisconsin illustrative base
Decision being prepared. Next private feasibility gate
Sheet. Customer Evidence, Marketing and Launch
Lead. Jordan Vale
Item ID. LAUNCH-04
Question. Which channel fits customer and economics?
Evidence to record. Direct web sales, marketplace, retail wholesale, distributors, licensing or combinations; buyer behavior, net receipts, acquisition cost, fulfillment and cash implications.
Answer / assumption. Own-website learning pilot is the only channel in the model with a positive contribution that does not depend on a marketplace fee, and it is still not authorized. Hardware wholesale does not fit: sell-in $70.95, contribution -$3.17, no break-even. Amazon merchant fulfillment contribution is $26.53 at a $129.00 price only under invented fees (selling/fulfillment $31.35) and is contingent on terms, readiness, and the radio evidence. Not Vendor Central and not a license. Drone Trap is research only and is not this offer. Website contribution $45.01 needs 667 units to cover $30,000.00 allocated fixed; Amazon needs 1131. Cash packed $42.00; amortized packed $58.67 at 600 a year for 3 years. Morgan Hale and Remy Sol are not contacted.
Result (Y/N/NA). Y
Explanation. Putting HOTEL-C1 into independent hardware at the current sell-in would plan a loss before acquisition and before the $6.00 cloud reserve is tested. The 300/600/1200 band is a cost sensitivity. Downside company cash excludes all revenue. No buyer behavior has been observed.
Status. Recorded — hardware route is a loss
Evidence / exact revision / URL and date. BMT-HOTEL-CHANNEL-ECONOMICS-001, 2026-10-24; BMT-HOTEL-CHECK-SHEET-ECONOMICS-001 contributions; BMT-HOTEL-CHECK-SHEET-RETAIL-001; BMT-COMPANY-TEMPLATE-PEOPLE-001 Morgan Hale and Remy Sol not contacted
Owner. Jordan Vale
Next action. Keep the hardware route closed at -$3.17. Do not open a website cart or an Amazon account. Target 2027-02-15.
Reviewer / review date. Pending. Sam Reed, planned 2026-11-01. The review has not been held. Findings remain pending.
Not-applicable reason. Applicable
Source guidance URLs. FTC advertising substantiation guidance; SBA pricing notes; GS1 identifier notes
Mouse Hotel — Are launch materials and operations ready?
Project. Mouse Hotel
Product revision. C1
Sheet revision. 1
Prepared by. Jordan Vale
Date. 2026-10-24
Target market / jurisdiction. U.S. adults; Wisconsin illustrative base
Decision being prepared. Next private feasibility gate
Sheet. Customer Evidence, Marketing and Launch
Lead. Jordan Vale
Item ID. LAUNCH-05
Question. Are launch materials and operations ready?
Evidence to record. Product identifiers, packaging/dimensions, listing/sell sheet, images, substantiated copy, instructions, support, inventory, shipping/returns and applicable safety documentation.
Answer / assumption. Not ready. Draft only: BMT-HOTEL-SPEC-SHEET-001 (HOTEL-C1, proposed 320 × 180 × 160 mm and 1.2 kg, unmeasured; Wi-Fi/Bluetooth module and OS versions unverified), BMT-HOTEL-INSTRUCTIONS-AND-WARNINGS-001 unreviewed, warranty draft not offered. Missing: origin, GTIN (none invented), insurance certificate, FCC and battery evidence, W-9, photos, support path, returns address, and a cloud-service description. BMT-HOTEL-BUYER-PACKET-001 records the gaps. Proposed case 6 and MOQ 12 are not a purchase order. The BMT-HOTEL-TEMPLATE-PRICING-TERMS-001 line still says drone not offered, which also means this sheet does not bundle DRONE-C1. G4 is no purchase order.
Result (Y/N/NA). N
Explanation. Listing an unmeasured 1.2 kg connected product, or implying an authorized radio, would publish particulars the spec marks unverified. BMT-HOTEL-LAUNCH-WORKSHEET-001 status is draft, no listing created.
Status. Open — radio and listing incomplete
Evidence / exact revision / URL and date. BMT-HOTEL-BUYER-PACKET-001, 2026-10-24; BMT-HOTEL-SPEC-SHEET-001; BMT-HOTEL-LAUNCH-WORKSHEET-001; BMT-HOTEL-CRITICAL-QUALITY-001 CTQ12–CTQ15; BMT-HOTEL-STAGE-GATES-001 G4
Owner. Jordan Vale
Next action. Leave identifiers, photos, and the support inbox uncreated. Do not state a ship weight. Target 2027-02-15.
Reviewer / review date. Pending. Sam Reed, planned 2026-11-01. The review has not been held. Findings remain pending.
Not-applicable reason. Applicable
Source guidance URLs. FTC advertising substantiation guidance; SBA pricing notes; GS1 identifier notes
Mouse Hotel — What does a small launch have to prove?
Project. Mouse Hotel
Product revision. C1
Sheet revision. 1
Prepared by. Jordan Vale
Date. 2026-10-24
Target market / jurisdiction. U.S. adults; Wisconsin illustrative base
Decision being prepared. Next private feasibility gate
Sheet. Customer Evidence, Marketing and Launch
Lead. Jordan Vale
Item ID. LAUNCH-06
Question. What does a small launch have to prove?
Evidence to record. Pilot quantity/budget, target conversion, contribution, returns, reviews/complaints, stock availability, stop/adjust criteria and a scheduled review owner.
Answer / assumption. Proposed first lot is 50 units after a later release. It is not authorized and the targets are not achieved: return rate under 5% ($6.45 reserve is 5% of $129.00) and zero welfare incidents. Illustration if 50 website units were packed: cash $42.00 × 50 = $2,100.00; return reserve $322.50; cloud reserve $6.00 × 50 = $300.00, which is not a hosting contract; website contribution $45.01 × 50 = $2,250.50 before acquisition. That lot is far under the 667 website units needed to cover $30,000.00 fixed. A hardware lot would plan 50 × -$3.17 = -$158.50 before cloud and acquisition. No conversion, review, or stock figure exists. Stop rule: unacceptable welfare failure or negative viable-channel contribution, before tooling.
Result (Y/N/NA). N
Explanation. Fifty units cannot prove alert reliability, privacy, battery behavior, or fixed-cost coverage. The $30,000.00 tool is three-year amortization at 600 units, not a released tool. BMT-HOTEL-FUNDING-WORKSHEET-001 $60,000.00 allowance is not committed. G5 is no launch authorized.
Status. Open — 50-unit lot is not a proof
Evidence / exact revision / URL and date. BMT-HOTEL-MARKET-CHECK-001, 2026-10-24; BMT-HOTEL-CHANNEL-ECONOMICS-001; BMT-HOTEL-FUNDING-WORKSHEET-001; BMT-HOTEL-STAGE-GATES-001 G4 and G5
Owner. Jordan Vale
Next action. Write the stop rule for returns, a welfare incident, a false-empty alert, and negative contribution. Do not order 50 units. Review 2027-02-15.
Reviewer / review date. Pending. Sam Reed, planned 2026-11-01. The review has not been held. Findings remain pending.
Not-applicable reason. Applicable
Source guidance URLs. FTC advertising substantiation guidance; SBA pricing notes; GS1 identifier notes
Mouse Hotel — Who does what after launch?
Project. Mouse Hotel
Product revision. C1
Sheet revision. 1
Prepared by. Jordan Vale
Date. 2026-10-24
Target market / jurisdiction. U.S. adults; Wisconsin illustrative base
Decision being prepared. Next private feasibility gate
Sheet. Customer Evidence, Marketing and Launch
Lead. Jordan Vale
Item ID. LAUNCH-07
Question. Who does what after launch?
Evidence to record. Customer support, returns/warranty, replenishment, marketing measurement, complaint escalation and decision to scale. Date the plan; confirm permissions before publishing.
Answer / assumption. Alex Meadow owns support, returns, and claim review. Sam Reed owns mechanical issues (CTQ01–CTQ07 and CTQ16: door, vents, slider, shell, bait pocket, inspection, baffle, crowded chamber). Jordan Vale owns the app, alert queue, BLE, firmware, pack, adapter, cloud account, and radio (CTQ08–CTQ15). The CTQ set is CTQ01–CTQ20. CTQ17–CTQ20 are untested and have no accepted owner. No hours, inbox, spare boards, replenishment rule, or scale decision is dated. Privacy complaints have no owner beyond Jordan's planned role, and that role has not started. All three people are not started. Publication is not permitted.
Result (Y/N/NA). N
Explanation. Connected-product support is not the same queue as a mechanical return. A dark alert (CTQ09, CTQ11) is a welfare escalation to Robin Keel, not a software ticket to close later. Robin Keel has not been contacted. The company is not formed, so nobody can yet accept a return in its name.
Status. Open — three queues are not staffed
Evidence / exact revision / URL and date. BMT-COMPANY-TEMPLATE-PEOPLE-001, 2026-10-24; BMT-HOTEL-CRITICAL-QUALITY-001 CTQ01–CTQ20, all untested; the owner split below is a planning note and is not started; BMT-HOTEL-LAUNCH-WORKSHEET-001
Owner. Jordan Vale
Next action. Split the unopened queue into mechanical, electrical, and welfare. Alex Meadow confirms no publication. Target 2027-02-15.
Reviewer / review date. Pending. Sam Reed, planned 2026-11-01. The review has not been held. Findings remain pending.
Not-applicable reason. Applicable
Source guidance URLs. FTC advertising substantiation guidance; SBA pricing notes; GS1 identifier notes
Mouse Hotel — What problem evidence is on file, separate from a manager's interest in alerts?
Project. Mouse Hotel
Product revision. C1
Sheet revision. 1
Prepared by. Jordan Vale
Date. 2026-10-24
Target market / jurisdiction. U.S. adults; Wisconsin illustrative base
Decision being prepared. Next private feasibility gate
Sheet. Customer Evidence, Marketing and Launch
Lead. Jordan Vale
Item ID. LAUNCH-08
Question. What problem evidence is on file, separate from a manager's interest in alerts?
Evidence to record. Interview count, whether the speaker does the night round or pays the invoice, last incident, method, minutes, dollars, and file revision. Interest in an alert does not count as problem evidence.
Answer / assumption. Eight Grade B problem interviews are on file, separate from Grade A price cards. Ruth Penner pays and would keep manual inspection. Chris Dalloway checks and does not pay. Omar Lind asked for a phone alert, then cut $129.00 to $90.00 when told the room check remains. Etta Varn will keep a $1,200.00 contract and stated Not applicable — no transaction in this planning record for a unit this year. Paula Greer (ME-H-10) stated $168.00 for two units at $84.00. Gil Phelps (ME-H-05) is Grade C: about 20 minutes on a complaint, no dollar figure. Rita Solano (ME-H-14) is Grade D and put the $129.00 card down. Interest in an alert is not counted as the problem note.
Result (Y/N/NA). Y
Explanation. An alert sentence pulls the speaker onto the product. The Grade B notes stay on the last method, who pays, and who checks. Hotel has no 20-interview gate. Grade B is 8. Do not read that count against a gate of 20. Grade A cards stay in the price row.
Status. Recorded — 8 problem interviews filed
Evidence / exact revision / URL and date. BMT-HOTEL-TEMPLATE-MARKET-EVIDENCE-001 Grade B rows ME-H-01, ME-H-02, ME-H-03, ME-H-04, ME-H-10, ME-H-13, ME-H-15, and ME-H-16; BMT-HOTEL-MARKET-CHECK-001
Owner. Jordan Vale
Next action. File further problem notes only after the interviews occur. Do not backfill from the design scenario or from a price card. Review 2027-02-15.
Reviewer / review date. Pending. Sam Reed, planned 2026-11-01. The review has not been held. Findings remain pending.
Not-applicable reason. Applicable
Source guidance URLs. SBA pricing notes; FTC advertising substantiation guidance
Mouse Hotel — Is a blinded price test specified for the $129.00 device and the cloud reserve, and has it run?
Project. Mouse Hotel
Product revision. C1
Sheet revision. 1
Prepared by. Jordan Vale
Date. 2026-10-24
Target market / jurisdiction. U.S. adults; Wisconsin illustrative base
Decision being prepared. Next private feasibility gate
Sheet. Customer Evidence, Marketing and Launch
Lead. Jordan Vale
Item ID. LAUNCH-09
Question. Is a blinded price test specified for the $129.00 device and the cloud reserve, and has it run?
Evidence to record. Protocol with audience, device price, whether the $6.00 cloud reserve is shown as a fee, offer, budget, duration, and success measure. Paid conversion separate from meeting interest.
Answer / assumption. A written protocol is not on file. Blinded price cards on file are five: Cleo Abbott (ME-H-06) chose $129.00 from $99.00, $129.00, and $159.00; Harris Boone (ME-H-07) chose $99.00 and refused $129.00; Dana Crowe (ME-H-08) chose $109.65; Felix Marr (ME-H-09) chose one case at 6 times $116.00; Simon Kee (ME-H-11) refused prepay at Not applicable — no transaction in this planning record. Helen Cho (ME-H-12) is wording with no price. The $6.00 cloud reserve was not accepted as a monthly fee. Victor Lang (ME-H-13) is Grade B and stated Not applicable — no transaction in this planning record a month. No budget is released. The $12,000.00 engineering and market slice of the $60,000.00 allowance is not committed. Device-only and device-plus-fee are still not written as two offers with a success measure.
Result (Y/N/NA). N
Explanation. BMT-HOTEL-TEMPLATE-PRICING-TERMS-001 still treats willingness to pay as not a single cleared figure. Running a further test at a property before Lane Corwin is engaged would be a public use, and a camera or account on that card would be an unreviewed privacy disclosure. The cards already filed stay internal.
Status. Open — cards ran without a written protocol
Evidence / exact revision / URL and date. BMT-HOTEL-TEMPLATE-MARKET-EVIDENCE-001 price choices ME-H-06, ME-H-07, ME-H-08, ME-H-09, and ME-H-11; ME-H-12 wording with no price; BMT-HOTEL-MARKET-CHECK-001; BMT-HOTEL-FUNDING-WORKSHEET-001 $60,000.00 not committed; BMT-HOTEL-TEMPLATE-PRICING-TERMS-001; BMT-HOTEL-CHANNEL-ECONOMICS-001 cloud reserve $6.00
Owner. Jordan Vale
Next action. Write two offers, device only and device plus a stated service fee, against the cards already filed. No ad account. Target 2027-02-15.
Reviewer / review date. Pending. Sam Reed, planned 2026-11-01. The review has not been held. Findings remain pending.
Not-applicable reason. Applicable
Source guidance URLs. FTC advertising substantiation guidance; SBA pricing notes
Mouse Hotel — Which claims are barred because the connected features are untested?
Project. Mouse Hotel
Product revision. C1
Sheet revision. 1
Prepared by. Jordan Vale
Date. 2026-10-24
Target market / jurisdiction. U.S. adults; Wisconsin illustrative base
Decision being prepared. Next private feasibility gate
Sheet. Customer Evidence, Marketing and Launch
Lead. Jordan Vale
Item ID. LAUNCH-10
Question. Which claims are barred because the connected features are untested?
Evidence to record. Sentence list tied to CTQ IDs, plus the manual-inspection sentence that must stay if any alert sentence is ever allowed.
Answer / assumption. Barred: checks itself, replaces rounds, or safe to leave (CTQ06, CTQ08, CTQ09); holds three mice or any capacity (spec not rated; CTQ16); no false-empty (CTQ08 target, including dust, is not a result); Wi-Fi or app reliability (CTQ09, CTQ11); child-safe or pet-safe (CTQ05); humane or escape-proof (CTQ01, CTQ02, CTQ07); certified pack or adapter (CTQ12, CTQ13); FCC authorized or grant-pending as a boast (CTQ15; no grant); private, encrypted, or breach-proof (CTQ10, CTQ14). If an alert is ever described, the same artifact must say offline manual inspection is required and alerts only supplement checks.
Result (Y/N/NA). Y
Explanation. BMT-HOTEL-LAUNCH-WORKSHEET-001 already carries the inspection sentence as design intent, not as a tested instruction. Copy that drops it would contradict CTQ06. No endorsement quote exists to disclose.
Status. Recorded — connected claims barred
Evidence / exact revision / URL and date. BMT-HOTEL-CRITICAL-QUALITY-001 CTQ06–CTQ16, 2026-10-24; BMT-HOTEL-LAUNCH-WORKSHEET-001; BMT-HOTEL-SPEC-SHEET-001 connectivity unverified; BMT-HOTEL-TEST-MATRIX-001 no FCC file
Owner. Jordan Vale
Next action. Attach the barred list to the draft sell sheet and keep the sell sheet unpublished. Target 2027-02-15.
Reviewer / review date. Pending. Sam Reed, planned 2026-11-01. The review has not been held. Findings remain pending.
Not-applicable reason. Applicable
Source guidance URLs. FTC advertising substantiation guidance; USPTO trademark basics
Mouse Hotel — What must be finished before a name, account screen, or property photo is public?
Project. Mouse Hotel
Product revision. C1
Sheet revision. 1
Prepared by. Jordan Vale
Date. 2026-10-24
Target market / jurisdiction. U.S. adults; Wisconsin illustrative base
Decision being prepared. Next private feasibility gate
Sheet. Customer Evidence, Marketing and Launch
Lead. Jordan Vale
Item ID. LAUNCH-11
Question. What must be finished before a name, account screen, or property photo is public?
Evidence to record. Trademark status, invention-disclosure status, privacy-copy review, and the person who can release a page.
Answer / assumption. Public use is held. No name beyond HOTEL-C1 is cleared. Lane Corwin has not been contacted and has given no patentability opinion. The prior-art log dated 2026-10-21 holds 16 fictitious citations (USPTO Patent Public Search 7, Espacenet 8, sample non-patent folder 1). There is no word-folder citation. That log is not a novelty opinion or freedom to operate. No trademark search is on file. No photograph of a device or of a property is allowed; a property photo would imply a pilot that has not happened. [email protected] is not a live support or privacy-contact address. An app store listing, a waitlist, and a crowdfunding page are unchosen and remain inside the hold. Alex Meadow has not authorized publication.
Result (Y/N/NA). Y
Explanation. A screen recording of a fake occupancy alert is a performance claim and a disclosure. G5 is no launch authorized. The hold does not wait for a counsel engagement that has not been approved.
Status. Held — public use closed
Evidence / exact revision / URL and date. BMT-HOTEL-TEMPLATE-PRIOR-ART-001, 16 citations, search date 2026-10-21; BMT-COMPANY-TEMPLATE-PEOPLE-001 Lane Corwin not contacted, public use held, 2026-10-24; BMT-HOTEL-SPEC-SHEET-001 contact; BMT-HOTEL-STAGE-GATES-001 G5
Owner. Alex Meadow
Next action. No page, no screen recording, no photographer. This sheet does not authorize contacting counsel. Recheck 2027-02-15.
Reviewer / review date. Pending. Sam Reed, planned 2026-11-01. The review has not been held. Findings remain pending.
Not-applicable reason. Applicable
Source guidance URLs. USPTO trademark basics; USPTO trade-secret notes; FTC advertising substantiation guidance
Mouse Hotel — Are GTIN, origin, insurance, radio evidence, and tax identity ready to ship?
Project. Mouse Hotel
Product revision. C1
Sheet revision. 1
Prepared by. Jordan Vale
Date. 2026-10-24
Target market / jurisdiction. U.S. adults; Wisconsin illustrative base
Decision being prepared. Next private feasibility gate
Sheet. Customer Evidence, Marketing and Launch
Lead. Jordan Vale
Item ID. LAUNCH-12
Question. Are GTIN, origin, insurance, radio evidence, and tax identity ready to ship?
Evidence to record. Identifier status, build site, certificate, radio and battery documents, and tax forms in the packet.
Answer / assumption. None are ready. No GTIN is invented. Origin is blank because no bid is awarded and no purchase order exists. Twenty-four dated bids are on file and unawarded: Fictional Sample Works (Perry Voss, 2026-09-19, valid through 2026-12-18), Fictional Meadow Prototype Shop (Willa Marsh, 2026-09-23, valid through 2026-11-22), and Fictional Northline Molding (Eden Crowe, 2026-09-30, valid through 2026-12-29), parts HOTEL-01 through HOTEL-08. BMT-COMPANY-INSURANCE-REQUEST-001 is unbound; Nia Calder has not been contacted; 2026-12-01 is a broker-packet target, not a certificate. No FCC authorization, no battery test, no UN 38.3 file. W-9 is not stored. BMT-HOTEL-BUYER-PACKET-001 says battery transport documents are reviewed separately where applicable, and that review has not started. SDS is not applicable to a chemical product; the pack is still an open transport question. No seller of record.
Result (Y/N/NA). N
Explanation. HOTEL-C1 cannot ship as a plain mechanical article. CTQ12 and CTQ15 are the blocks. A wholesale case of 6 would multiply an uninsured lithium shipment.
Status. Open — radio and identity missing
Evidence / exact revision / URL and date. BMT-HOTEL-BUYER-PACKET-001, 2026-10-24; BMT-HOTEL-CRITICAL-QUALITY-001 CTQ12, CTQ13, CTQ15; BMT-COMPANY-INSURANCE-REQUEST-001 unbound; BMT-HOTEL-TEMPLATE-QUOTE-COMPARISON-001, 24 dated bids, unawarded, no purchase order; BMT-COMPANY-TEMPLATE-PEOPLE-001 Nia Calder not contacted
Owner. Alex Meadow
Next action. Do not buy a barcode, do not book a carrier, and do not request a certificate number. Recheck 2027-02-15.
Reviewer / review date. Pending. Sam Reed, planned 2026-11-01. The review has not been held. Findings remain pending.
Not-applicable reason. Applicable
Source guidance URLs. GS1 identifier notes; SBA pricing notes; CPSC small-business page
Mouse Hotel — What does a 50-unit illustration cost, and why is hardware the wrong lot?
Project. Mouse Hotel
Product revision. C1
Sheet revision. 1
Prepared by. Jordan Vale
Date. 2026-10-24
Target market / jurisdiction. U.S. adults; Wisconsin illustrative base
Decision being prepared. Next private feasibility gate
Sheet. Customer Evidence, Marketing and Launch
Lead. Jordan Vale
Item ID. LAUNCH-13
Question. What does a 50-unit illustration cost, and why is hardware the wrong lot?
Evidence to record. Cash, reserves, contribution, break-even units, and the routes the lot must not be used to justify.
Answer / assumption. Not ordered. Website illustration: cash $2,100.00, return reserve $322.50, cloud reserve $300.00, contribution $2,250.50 before acquisition, versus 667 units to cover $30,000.00. Hardware illustration at the same 50 units plans a -$158.50 contribution before cloud and acquisition, so a hardware pilot is not a learning design at the $70.95 sell-in. Amazon illustration is not usable until the $31.35 fulfillment figure is a real rate. The lot cannot support tooling, a property contract, or a demand claim.
Result (Y/N/NA). Y
Explanation. The $60,000.00 feasibility allowance (prototype/rig $24,000.00, welfare $18,000.00, engineering/market $12,000.00, reserve $6,000.00) stops before production tooling and is not committed. Ordering 50 units would jump G4.
Status. Recorded — hardware lot refused
Evidence / exact revision / URL and date. BMT-HOTEL-CHANNEL-ECONOMICS-001, 2026-10-24; BMT-HOTEL-FUNDING-WORKSHEET-001; BMT-HOTEL-STAGE-GATES-001 G4; BMT-HOTEL-TEMPLATE-PRICING-TERMS-001 MOQ 12 not released
Owner. Jordan Vale
Next action. Keep both the website lot and the hardware lot unbought. Review the arithmetic at 2027-02-15.
Reviewer / review date. Pending. Sam Reed, planned 2026-11-01. The review has not been held. Findings remain pending.
Not-applicable reason. Applicable
Source guidance URLs. SBA pricing notes; GS1 identifier notes
Mouse Hotel — How are returns, dark alerts, privacy complaints, and welfare incidents escalated?
Project. Mouse Hotel
Product revision. C1
Sheet revision. 1
Prepared by. Jordan Vale
Date. 2026-10-24
Target market / jurisdiction. U.S. adults; Wisconsin illustrative base
Decision being prepared. Next private feasibility gate
Sheet. Customer Evidence, Marketing and Launch
Lead. Jordan Vale
Item ID. LAUNCH-14
Question. How are returns, dark alerts, privacy complaints, and welfare incidents escalated?
Evidence to record. Queue names, severity, shipment-stop right, and the welfare reviewer. State that the queues are not open.
Answer / assumption. No inbox is open. Proposed split, not staffed: Alex Meadow logs the return and the words used in any reply; Sam Reed takes door, vent, slider, shell, baffle, and chamber damage; Jordan Vale takes a dark or late alert, a firmware update that hides occupancy, a pack or adapter event, and an account complaint. Any animal distress or a missed occupied chamber stops shipments and goes to Robin Keel, who has not been contacted. Warranty draft is manufacturing defect only, one year, not offered. Under 5% returns is not a measured rate.
Result (Y/N/NA). N
Explanation. CTQ09 and CTQ11 turn a software fault into a welfare fault if the chamber is occupied. Treating it as an ordinary ticket would miss the BMT-HOTEL-MARKET-CHECK-001 stop rule. There is no replenishment plan because there is no stock.
Status. Open — escalation log is empty
Evidence / exact revision / URL and date. BMT-HOTEL-CRITICAL-QUALITY-001 CTQ08, CTQ09, CTQ11, CTQ14, 2026-10-24; BMT-HOTEL-MARKET-CHECK-001 stop signal; BMT-COMPANY-TEMPLATE-PEOPLE-001 Robin Keel not contacted
Owner. Alex Meadow
Next action. Draft the four-column log with zero rows. Do not publish a support address. Target 2027-02-15.
Reviewer / review date. Pending. Sam Reed, planned 2026-11-01. The review has not been held. Findings remain pending.
Not-applicable reason. Applicable
Source guidance URLs. FTC advertising substantiation guidance; CPSC small-business page
Mouse Hotel — What stop rule is dated for a later pilot, and who can halt shipments?
Project. Mouse Hotel
Product revision. C1
Sheet revision. 1
Prepared by. Jordan Vale
Date. 2026-10-24
Target market / jurisdiction. U.S. adults; Wisconsin illustrative base
Decision being prepared. Next private feasibility gate
Sheet. Customer Evidence, Marketing and Launch
Lead. Jordan Vale
Item ID. LAUNCH-15
Question. What stop rule is dated for a later pilot, and who can halt shipments?
Evidence to record. Thresholds, data source, review date, and the halt owner. Paid orders separate from demo meetings.
Result (Y/N/NA). Y
Explanation. G5 is no launch authorized. This rule does not create a pilot. It stops one from continuing if a later gate ever opens a lot. Cloud-reserve spend is not evidence that a service is priced.
Status. Recorded — stop rule dated, pilot closed
Evidence / exact revision / URL and date. BMT-HOTEL-MARKET-CHECK-001, 2026-10-24; BMT-HOTEL-CHANNEL-ECONOMICS-001 hardware -$3.17; BMT-HOTEL-STAGE-GATES-001 G5
Owner. Alex Meadow
Reviewer / review date. Pending. Sam Reed, planned 2026-11-01. The review has not been held. Findings remain pending.
Not-applicable reason. Applicable
Source guidance URLs. SBA pricing notes; FTC advertising substantiation guidance
Mouse Hotel — Is the Hotel launch funded, and what spend is forbidden?
Project. Mouse Hotel
Product revision. C1
Sheet revision. 1
Prepared by. Jordan Vale
Date. 2026-10-24
Target market / jurisdiction. U.S. adults; Wisconsin illustrative base
Decision being prepared. Next private feasibility gate
Sheet. Customer Evidence, Marketing and Launch
Lead. Jordan Vale
Item ID. LAUNCH-16
Question. Is the Hotel launch funded, and what spend is forbidden?
Evidence to record. Allowance, release status, and the spend list that stays closed.
Answer / assumption. Not funded. BMT-HOTEL-FUNDING-WORKSHEET-001 is a $60,000.00 feasibility allowance, status not committed, and it says future Hotel/Drone funding is not secured. Split: prototype/rig $24,000.00, specialist testing/welfare $18,000.00, engineering/market $12,000.00, reserve $6,000.00, stop before production tooling. Acquisition allowance Not applicable — no transaction in this planning record. Forbidden: tooling, a 50-unit or MOQ-12 purchase order, GTIN, marketplace fees, a cloud account with a card on file, photography at a property, ads, samples to Morgan Hale, and preorders.
Result (Y/N/NA). Y
Evidence / exact revision / URL and date. BMT-HOTEL-FUNDING-WORKSHEET-001, 2026-10-24; BMT-HOTEL-CHANNEL-ECONOMICS-001; BMT-HOTEL-STAGE-GATES-001 G1 and G5
Owner. Alex Meadow
Reviewer / review date. Pending. Sam Reed, planned 2026-11-01. The review has not been held. Findings remain pending.
Not-applicable reason. Applicable
Source guidance URLs. SBA pricing notes; SBA lender notes; SEC early-stage investor notes
Document administration
Preparation: Jordan Vale, scenario attribution, 2026-10-24. Signature: unsigned. Review: pending; no reviewer signature or date. Approval: withheld; no approver signature or date.