The Better Mouse Trap Co. / sample paperwork

Mouse Hotel — What the prototype needs to prove

Mouse HotelRevision C12026-10-24Planning draft18 entries
Mouse Hotel — What the prototype needs to proveBMT-HOTEL-CHECK-SHEET-PROTOTYPE-001 · Rev C1
Company
The Better Mouse Trap Co.
Project / product line
Hotel trap
Document
Mouse Hotel — What the prototype needs to prove
Document no.
BMT-HOTEL-CHECK-SHEET-PROTOTYPE-001
Revision
C1
Status
Planning draft
Start date
2026-10-24
Revision date
2026-10-24
Prepared by / owner
Jordan Vale, Hotel electronics, with Sam Reed on the shell
Checklist ID
BMT-HOTEL-CHECK-SHEET-PROTOTYPE-001, Rev C1
Scope
HOTEL-C1 three-chamber shell and the electronics cassette.
Reviewer
Casey Holt
Review date
2026-11-01
Team
Alex Meadow, packet owner; Jordan Vale, Hotel electronics; Sam Reed, mechanical reference; Robin Keel, animal-welfare reviewer
Approved by
review pending. Alex Meadow, Planning draft C1, unsigned. The $60,000.00 Hotel allowance is not drawn.
Mouse Hotel — What the Prototype Needs to Prove
Item / review questionAnswer / findingResult / statusEvidenceResponsibility / action

Item ID: PROTOTYPE-01

Question: Which question is this prototype answering?

Answer / assumption: First question is the capture door, not the radio. CTQ01 / R01 / DF01, RPN 210: the door stays latched through 100 dry cycles on each of 10 concept units, then a 5 N outward retention pull (BMT-HOTEL-TEST-MATRIX-001 Rev C1 T01). Mouse Hotel C1 is a three-chamber connected concept, and the door question is still the one this prototype answers first. Electronics, Wi-Fi, and the battery are separate rows and are review pending. No live multi-catch rate, no property installation, no FCC grant, and no order at the $129.00 hold price is demonstrated. BMT-HOTEL-TEMPLATE-TEST-RESULTS-001 Rev C1 records T01 through T20 as Not run. The $60,000.00 Hotel allowance is not authorized.

Explanation: The door is the first question. Radio, Wi-Fi, and the battery are later rows and are review pending. DF01 RPN 210 is proposed.

Result (Y/N/NA): Y

Status: Recorded — first question named, untested

BMT-HOTEL-TEST-MATRIX-001 Rev C1 T01; BMT-HOTEL-DFMEA-001 Rev C1 DF01 RPN 210; BMT-HOTEL-CONCEPT-DRAWING-001 Rev C1; 2026-10-24; BMT-HOTEL-TEMPLATE-TEST-RESULTS-001 Rev C1 Not

Owner: Jordan Vale

Next action: Write the T01 method card for the three-chamber shell; do not order electronics against the unreleased allowance; target 2027-02-15

Reviewer / review date: Pending. Casey Holt, planned 2026-11-01. First question is recorded as C1 intent and is not accepted.

Item ID: PROTOTYPE-02

Question: What is the exact configuration?

Answer / assumption: Mouse Hotel C1: three isolated proposed chambers, Wi-Fi and Bluetooth, local and app occupancy alerts. No disease-control claim, no child use, no export launch (PROJECT-02). BMT-HOTEL-BOM-001 Rev C1: HOTEL-01 three-chamber shell, HOTEL-02 entry baffles and latches (qty 3), HOTEL-03 sensor array, HOTEL-04 radio/controller cassette, HOTEL-05 protected battery, HOTEL-06 charger and cable, HOTEL-07 assembly and flashing, HOTEL-08 carton and instructions. Reserved IDs HOTEL-X1-001 through HOTEL-X1-010 for mechanical surrogates and one bench software rig. Nothing is built. BMT-HOTEL-TEMPLATE-COST-SHEET-001 Rev C1 running total is $58.67 against the $129.00 hold price; that total is a worksheet, not a quote. Twenty-four dated bids are on file and none is awarded: Fictional Sample Works (Perry Voss, 2026-09-19, valid through 2026-12-18), Fictional Meadow Prototype Shop (Willa Marsh, 2026-09-23, valid through 2026-11-22), and Fictional Northline Molding (Eden Crowe, 2026-09-30, valid through 2026-12-29), parts HOTEL-01 through HOTEL-08. The C1 bill is 19 rows, assembly HOTEL-C1-ASSY plus HOTEL-01 through HOTEL-16. Labor is HOTEL-07. Tooling is HOTEL-16. A printed shell is allowed only if chamber count, baffle, and vent geometry match C1 and the card says so. A dev-board cassette is not HOTEL-04.

Explanation: HOTEL-01 through HOTEL-08 are the quoted subset. The C1 bill runs through HOTEL-16. Nothing is built. The running total is a worksheet, not a quote.

Result (Y/N/NA): Y

Status: Recorded — configuration listed, none built

BMT-HOTEL-BOM-001 Rev C1, 19 rows, HOTEL-C1-ASSY and HOTEL-01 through HOTEL-16; quoted subset HOTEL-01 through HOTEL-08; BMT-HOTEL-TEMPLATE-COST-SHEET-001 Rev C1 running total

Owner: Jordan Vale

Next action: Hold ID templates HOTEL-X1-001 through HOTEL-X1-010 and the bench software rig; record the printed-shell and dev-board deviation rule; target 2027-02-15

Reviewer / review date: Pending. Casey Holt, planned 2026-11-01. Configuration matches the C1 bill.

Item ID: PROTOTYPE-03

Question: How will we judge success before testing?

Answer / assumption: Criteria are copied from BMT-HOTEL-TEST-MATRIX-001 Rev C1 and are review pending. T01 CTQ01 DF01 RPN 210: 100 dry cycles and a 5 N pull, n=10. T02 CTQ02 DF02 RPN 252: two independent raised vent paths stay open in a bedding-surrogate trial. T03 CTQ03 DF03 RPN 192: fingers stay 30 mm from the door path; 10 adults, unloaded, no path contact. T04 CTQ04 DF04 RPN 240: shell opens without tools; no visible fluorescent soil after the defined wash, n=10; not a biological claim. T05 CTQ05 DF05 RPN 162: bait insert captive after 20 N, n=10. T06 CTQ06 DF06 RPN 432: occupancy visible without opening; welfare reviewer sets the interval; no live animals before an ethical review. T07 CTQ07 DF07 RPN 280: three-compartment target; a rigid mouse surrogate cannot back-drive the baffle at 2 N. T08 CTQ08 DF08 RPN 360: surrogate detected in each chamber in 100 placements, including a dust challenge; zero false-empty in that screen. T09 CTQ09 DF09 RPN 432: local occupancy indicator works with the network down; the app marks offline within the proposed 5 minutes. T10 CTQ10 DF10 RPN 320: provisioning requires a physical button and a unique identity; an unauthorized client is denied in 50 attempts. T11 CTQ11 DF11 RPN 288: local indication and mechanical capture remain safe after power loss at each update phase. T12 CTQ12 DF12 RPN 320, severity 10: no charging when wet; proposed independent cutoff at 45 C cell surface; a battery specialist is still required. T13 CTQ13 DF13 RPN 315: electronics detach before washing; power is inhibited when the cassette is unseated; no IP rating is claimed. T14 CTQ14 DF14 RPN 280: no precise location; proposed event retention 30 days, with a deletion path. T15 CTQ15 DF15 RPN 360: a candidate module is chosen only after grant, antenna, and host obligations are reviewed; no FCC ID is invented. T16 CTQ16 DF16 RPN 360: capacity is not rated; three isolated chambers need welfare-specialist approval before any crowding claim. Environment is an indoor bench. Counts are a concept screen, sample. T17 through T20 and CTQ17 through CTQ20 are on the same matrix, unapproved, and Not run. DFMEA C1 is DF01 through DF32 (32 data rows). Radio-integration hold is process step P18. Test T15 is not process step P15.

Explanation: T01 through T20 limits are copied and are review pending. CTQ01 through CTQ16 is a short index. A run before initials would not count.

Result (Y/N/NA): N

Status: Open — acceptance lines not initialed

BMT-HOTEL-TEST-MATRIX-001 Rev C1 T01-T20; BMT-HOTEL-CRITICAL-QUALITY-001 Rev C1 CTQ01-CTQ20; BMT-HOTEL-DFMEA-001 Rev C1 DF01-DF32; 2026-10-24; limits review pending

Owner: Jordan Vale

Next action: Copy T01 through T20 acceptance lines onto method cards and mark every limit review pending; target 2027-02-15

Reviewer / review date: Pending. Casey Holt, planned 2026-11-01. Limits are copied and not initialed.

Item ID: PROTOTYPE-04

Question: Is the test safe and representative?

Answer / assumption: Surrogates first. No live-animal protocol is approved. This product has no aircraft, so no outdoor-flight protocol is in scope. The pinch path uses the unloaded 30 mm task (DF03, severity 8). Wash water is not applied with the cassette seated (DF13, severity 9, RPN 315). No wet charging (DF12, severity 10, RPN 320). Jordan Vale does not run destructive battery tests; a battery specialist would, and none is appointed. A false-empty indication is a stop (DF08 RPN 360 and DF09 RPN 432). Children are out of scope. Small-property managers are the intended users on PROJECT-01. Eight Grade B interviews are on file, and none is an observation of a built Hotel. Stop on heat, water at the board, a pinch, a false-empty, or a departed method. Restart of T03, T06, T12, and T16 requires the relevant specialist in writing.

Explanation: Pinch, a wet cassette, wet charging, and a false-empty are written stops. No battery specialist is appointed, so T12 is not cleared.

Result (Y/N/NA): N

Status: Open — safeguards not signed

BMT-HOTEL-DFMEA-001 Rev C1 DF03, DF12 RPN 320 severity 10, DF13 RPN 315, DF09 RPN 432; 2026-10-24; no specialist appointed

Owner: Jordan Vale

Next action: Write stop rules for pinch, wet cassette, 45 C cutoff, and false-empty; appoint no specialist until a consent exists; target 2027-02-15

Reviewer / review date: Pending. Casey Holt, planned 2026-11-01. Safeguards are written and not signed.

Item ID: PROTOTYPE-05

Question: What happened, including failures?

Answer / assumption: No runs. BMT-HOTEL-TEMPLATE-TEST-RESULTS-001 Rev C1 records T01 through T20 as Not run, turn 0. No sensor logs, no pairing logs, no temperature readings, and no photos. Projected residual RPNs are not results. First-pass RPNs DF06 and DF09 are both 432, the highest first-pass scores. Projected residuals DF06-M and DF09-M are 216 and are the top projected lines. The residual RPN total is 3567. The 80% review line is 2853.6. Accepted residual is 0. Do not fill a pass to support a later Hotel release.

Explanation: T01 through T20 are Not run. First-pass DF06 and DF09 at 432 are not results. Projected DF06-M and DF09-M are 216. The residual total is 3567.

Result (Y/N/NA): N

Status: Blocked — no run on file

BMT-HOTEL-TEMPLATE-TEST-RESULTS-001 Rev C1 T01-T20 Not run; 2026-10-24; no raw sheet

Owner: Jordan Vale

Next action: Leave BMT-HOTEL-TEMPLATE-TEST-RESULTS-001 Rev C1 T01 through T20 at Not run; target 2027-02-15

Reviewer / review date: Pending. Casey Holt, planned 2026-11-01. No raw sheet is on file.

Item ID: PROTOTYPE-06

Question: What can we conclude, and what remains unproven?

Answer / assumption: Only planning completeness can be assessed for the prototype. Verification of R01 through R16 has not started, and tests T17 through T20 are also Not run. Market notes are on file and are not a prototype pass. BMT-HOTEL-TEMPLATE-MARKET-EVIDENCE-001, recorded by Alex Meadow, holds 16 panels dated 2026-08-04 through 2026-10-22. Grade B interviews are 8, and Hotel has no 20-interview gate: ME-H-01 Ruth Penner, ME-H-02 Chris Dalloway, ME-H-03 Omar Lind, ME-H-04 Etta Varn, ME-H-10 Paula Greer, ME-H-13 Victor Lang, ME-H-15 Ben Arkell, and ME-H-16 Lydia Ferr. Five price choices are filed: ME-H-06 Cleo Abbott chose $129.00; ME-H-07 Harris Boone chose $99.00 and refused $129.00; ME-H-08 Dana Crowe chose $109.65; ME-H-09 Felix Marr chose one case at 6 times $116.00; ME-H-11 Simon Kee refused prepay and put Not applicable — no transaction in this planning record on the page. ME-H-12 Helen Cho is wording with no price. Cash collected is Not applicable — no transaction in this planning record. There is no dealer and no property account. Paula Greer is not a signed dealer. Still unproven on the hardware: live multi-catch, the welfare interval, a false-empty rate on real soil, an RF grant, deletion across real backups, wash efficacy beyond fluorescent soil, production yield, and a demand conclusion at $129.00. One filed choice of $129.00 does not close that question. Jordan Vale owns a failed characteristic and a full retest of that test ID after the DFMEA action. G0 through G5 are pending. G1 is the only gate this packet could later support, and only after the allowance is released. G2 through G5 have no sign-off. Hotel spend is not released on 2026-10-24. Residual RPN total is 3567. The 80% review line is 2853.6. Accepted residual is 0. Radio-integration hold is process step P18.

Explanation: Eight Grade B interviews and five price choices are filed. They are not a property placement and not a prototype pass. No radio grant is on file. G2 through G5 stay shut. The allowance is not released.

Result (Y/N/NA): N

Status: Blocked — evidence not established

BMT-HOTEL-MARKET-CHECK-001 Rev C1 and BMT-HOTEL-TEMPLATE-MARKET-EVIDENCE-001 Rev C1, 16 panels, 8 Grade B, 5 price choices; BMT-HOTEL-CHECK-SHEET-PROJECT-001 Rev C1 PROJECT-04 and

Owner: Jordan Vale

Next action: Record that no performance, welfare, RF, or production conclusion is available; target 2027-02-15

Reviewer / review date: Pending. Casey Holt, planned 2026-11-01. No performance conclusion is available.

Item ID: PROTOTYPE-07

Question: Which characteristics must this prototype prove, and which are deferred?

Answer / assumption: The written plan names sixteen characteristics, and that index is short of the matrix: T01 door, T02 vents, T03 release, T04 wash, T05 bait, T06 window, T07 baffle, T08 sensor, T09 alert queue, T10 provisioning, T11 firmware, T12 pack, T13 cassette interlock, T14 account and cloud, T15 radio module, and T16 crowded chamber, mapped to the short index CTQ01 through CTQ16 and DF01 through DF16. The full set is CTQ01 through CTQ20, tests T01 through T20, and DFMEA DF01 through DF32 (32 data rows). Control plan is CP01 through CP20. None of those proofs are dropped from the plan. The build itself is deferred. Hotel stays outside the $80,000. An FCC certification, a property pilot, production tooling, and live-animal work are outside the $60,000.00 allowance even after a consent. Production control-plan rows CP01 through CP20 do not replace tests T01 through T20. Radio-integration hold is process step P18, not P15. Test T15 is the radio-module test and is not that step.

Explanation: CTQ01 through CTQ20 stay on the plan. The sixteen-line index is short. The build waits on Basic evidence and on open action A03.

Result (Y/N/NA): Y

Status: Recorded — scope list written, build deferred

Owner: Jordan Vale

Next action: Keep CTQ01 through CTQ20 on the plan and keep the build behind Basic evidence and A03; target 2027-02-15

Reviewer / review date: Pending. Casey Holt, planned 2026-11-01. The in-scope list is recorded as intent and is not accepted.

Item ID: PROTOTYPE-08

Question: What is the sample size rationale and how is each unit identified?

Answer / assumption: n=10 mechanical surrogates, HOTEL-X1-001 through HOTEL-X1-010, for the door, vent, release, wash, bait, window, and baffle screens. That count matches CTQ01 and is not a reliability demonstration. Sensor, alert, provisioning, firmware, and account checks use the bench software rig plus the surrogates where the matrix requires a chamber. T08 is 100 placements, not 100 extra builds. T10 is 50 unauthorized attempts on the test build. T12 is a specialist setup, not a 10-unit destructive sample. A damaged unit is retired under a new gap note. No ID is issued until a consent to build exists. No consent exists.

Explanation: n=10 is the mechanical screen. HOTEL-X1-001 through HOTEL-X1-010 are not issued. The bench software rig is not a serial.

Result (Y/N/NA): N

Status: Open — serials reserved, none issued

BMT-HOTEL-TEST-MATRIX-001 Rev C1 sample notes for T01, T08, and T10; 2026-10-24; IDs not issued

Owner: Jordan Vale

Next action: Prepare the sample-size note for n=10, 100 placements, and 50 pairing attempts; issue no hardware ID; target 2027-02-15

Reviewer / review date: Pending. Casey Holt, planned 2026-11-01. Serials are reserved and not issued.

Item ID: PROTOTYPE-09

Question: What build method differs from the intended production part?

Answer / assumption: Production intent is a molded clear-lid shell (HOTEL-01, BMT-HOTEL-TEMPLATE-COST-SHEET-001 Rev C1 line $24.67 after low-volume amortization versus the $8.00 piece price) and a candidate Wi-Fi/BLE cassette (HOTEL-04). The prototype may use a printed three-chamber shell and a dev board. Chamber count, baffle back-drive geometry, vent locations, and the unseated-cassette interlock must match C1. A dev board cannot support an FCC host grant, the $58.67 BMT-HOTEL-TEMPLATE-COST-SHEET-001 Rev C1 total, or a claim that the board is HOTEL-04. The battery is a candidate protected pack (HOTEL-05). If the bench pack differs, the unit card says so. Fictional Sample Works, Fictional Meadow Prototype Shop, and Fictional Northline Molding have 24 dated bids on file. None is awarded and no purchase order exists.

Explanation: A printed shell and a dev board cannot support a host grant or the worksheet total. Chamber count and the unseated-cassette interlock must still match C1.

Result (Y/N/NA): Y

Status: Recorded — deviation rule written

BMT-HOTEL-TEMPLATE-COST-SHEET-001 Rev C1 HOTEL-01 unit $24.67 and running total $58.67; BMT-HOTEL-BOM-001 Rev C1 piece prices; 2026-10-24

Owner: Jordan Vale

Next action: Separate HOTEL-04 from any dev board on the unit-card template; target 2027-02-15

Reviewer / review date: Pending. Casey Holt, planned 2026-11-01. The deviation rule is recorded as intent and is not accepted.

Item ID: PROTOTYPE-10

Question: What equipment and calibration are required before a run counts?

Answer / assumption: A force gauge for the 5 N pull, the 20 N bait pull, and the 2 N baffle back-drive, with the check recorded that day. An uncalibrated gauge voids the run. Video for T03. Fluorescent soil for T04. A bench router and a phone for T09 and T10, including an injected network-loss case. A power-interrupt fixture for T11. A temperature method for the proposed 45 C cutoff on T12, owned by a battery specialist who is not appointed. No IP-rating chamber, because no IP rating is claimed. No FCC lab is inside this allowance. The rig slice on the BMT-HOTEL-FUNDING-WORKSHEET-001 Rev C1 is $24,000.00. It is not released.

Explanation: An uncalibrated gauge voids the run. The rig slice is unreleased, so no router, video setup, or temperature method is on the bench.

Result (Y/N/NA): N

Status: Open — instruments not released

BMT-HOTEL-TEST-MATRIX-001 Rev C1 equipment lines; BMT-HOTEL-FUNDING-WORKSHEET-001 Rev C1 rig slice $24,000.00 unreleased; 2026-10-24

Owner: Jordan Vale

Next action: List the gauge, video, router-loss fixture, and specialist temperature method inside the unreleased $24,000.00 rig slice; target 2027-02-15

Reviewer / review date: Pending. Casey Holt, planned 2026-11-01. No instrument spend is released.

Item ID: PROTOTYPE-11

Question: What cost is authorized for this prototype, and what is excluded?

Answer / assumption: The Hotel feasibility allowance on the BMT-HOTEL-FUNDING-WORKSHEET-001 Rev C1 is $60,000.00: rig $24,000.00, testing and welfare $18,000.00, engineering and market $12,000.00, and reserve $6,000.00. It stops before the $30,000.00 HOTEL-01 shell tool. That shell allowance is outside the $60,000.00 ceiling and is not a bid.00 contribution. The company BMT-COMPANY-TEMPLATE-CASH-FLOW-001 Rev C1 includes no Hotel development spend. Hold price $129.00. The year-1 hypothesis of 600 units, with sensitivities 300 / 600 / 1,200, is not an order. Alex Meadow would have to consent before any Hotel release, and only after Basic evidence exists and A03 is closed. Paid this year is Not applicable — no transaction in this planning record. Any future cloud-alert cost is borne by the company. No subscription is sold on this sheet. Twenty-four dated bids are on file and none is awarded. No supplier is on a purchase order.

Explanation: The $60,000.00 allowance is outside the owner contribution and outside the Basic cap. Paid this year is Not applicable — no transaction in this planning record.

Result (Y/N/NA): N

Status: Blocked — allowance unfunded

BMT-COMPANY-TEMPLATE-FUNDING-001 Rev C1 unfunded lines, Hotel $60,000.00 split $24,000.00 / $18,000.00 / $12,000.00 / $6,000.00; 2026-10-24

Owner: Alex Meadow

Next action: Leave the $60,000.00 allowance unreleased; do not ask Alex Meadow for Hotel consent before Basic evidence and A03; target 2027-02-15

Reviewer / review date: Pending. Casey Holt, planned 2026-11-01. No allowance is consented.

Item ID: PROTOTYPE-12

Question: What are the stop rules, and who may restart?

Answer / assumption: Jordan Vale stops the bench if a hand enters the door path, a baffle back-drives at the 2 N check, the cassette is powered while unseated or wet, cell-surface temperature reaches the proposed 45 C cutoff, a false-empty is indicated, or the method changes. A battery specialist would authorize restart of T12. A welfare specialist would authorize restart of T06 and T16. Neither specialist is appointed. No live animal. No child subject. Crowding is not represented by empty volume. Writing this plan does not close A03.

Explanation: Jordan Vale can stop a bench run. Restart of T03, T06, T12, and T16 needs a specialist who is not appointed.

Result (Y/N/NA): N

Status: Open — stop card not attached

BMT-HOTEL-DFMEA-001 Rev C1 DF12, DF13, DF08, DF16; action A03 open; 2026-10-24

Owner: Jordan Vale

Next action: Attach specialist restart rules to T03, T06, T12, and T16; target 2027-02-15

Reviewer / review date: Pending. Casey Holt, planned 2026-11-01. The stop card is not on the method cards.

Item ID: PROTOTYPE-13

Question: How will measured, simulated, and predicted results be separated?

Answer / assumption: Measured means a gauge value, a count, a photo, a sensor log, or a pairing log on HOTEL-X1-001 through HOTEL-X1-010 or on the bench software rig. Simulated means an injected fault on the bench software rig and is labeled simulated. It does not by itself close a mechanical CTQ. Predicted means the DFMEA projected RPN, including the projected residuals for DF06-M and DF09-M at 216, and is not evidence. The residual total is 3567. BMT-HOTEL-TEMPLATE-TEST-RESULTS-001 Rev C1 stays Not run for T01 through T20 until a measured row exists. An app mock is not a T09 result.

Explanation: A bench-software-rig log is simulated until a measured row exists. A projected RPN is not evidence.

Result (Y/N/NA): Y

Status: Recorded — evidence classes defined

BMT-HOTEL-TEMPLATE-TEST-RESULTS-001 Rev C1; BMT-HOTEL-DFMEA-001 Rev C1 projected RPN column; 2026-10-24; no measured row

Owner: Jordan Vale

Next action: Label future output of the bench software rig as simulated until a measured row exists; target 2027-02-15

Reviewer / review date: Pending. Casey Holt, planned 2026-11-01. Measured, simulated, and predicted are separated.

Item ID: PROTOTYPE-14

Question: Who owns a failed proof, and what retest is required?

Answer / assumption: Jordan Vale owns a failed Hotel characteristic. Alex Meadow does not close it by releasing funds. A fail repeats the full acceptance count for that test ID after the DFMEA action or a written alternative. A T12 fail blocks any powered prototype. A T15 fail blocks any radio claim and is not solved by inventing an FCC ID. A T16 fail blocks any sentence that rates capacity at three mice. Retest units are reidentified if the hardware changed. No retest is queued, because no first test has been run.

Explanation: Jordan Vale owns a failed characteristic. Alex Meadow does not close it by releasing more of the allowance.

Result (Y/N/NA): Y

Status: Recorded — fail owner named

BMT-HOTEL-DFMEA-001 Rev C1 recommended actions, owner Jordan Vale; 2026-10-24; not implemented or tested

Owner: Jordan Vale

Next action: Name Jordan Vale on the fail-and-retest line for T01 through T20; target 2027-02-15

Reviewer / review date: Pending. Casey Holt, planned 2026-11-01. The fail owner is named.

Item ID: PROTOTYPE-15

Question: Which gate can this packet support, and which gates stay shut?

Answer / assumption: On 2026-10-24 this packet does not open a gate. If the allowance were later released, a complete measured set could support a private G1 mechanism recommendation only. G2 user/welfare needs measured T03, T06, T08, T09, and T16, plus a welfare interval that is not set. G3 freeze, G4 pilot, and G5 launch stay shut. The date on this sheet is 2027-02-15, which is after A03 (2026-12-15) and after the Basic latch review. This sheet does not pull Hotel work ahead of Basic. The $20,000.00 company cash floor is unchanged by a Hotel plan that has no spend.

Explanation: If the allowance were later released, the packet could support a private G1 recommendation only. 2027-02-15 is not a spend start.

Result (Y/N/NA): Y

Status: Recorded — later gates stay shut

BMT-HOTEL-CHECK-SHEET-PROJECT-001 Rev C1 PROJECT-06; A03 due 2026-12-15; sheet target 2027-02-15; allowance unreleased

Owner: Jordan Vale

Next action: Keep G2 through G5 shut; do not treat 2027-02-15 as a start of Hotel spend; target 2027-02-15

Reviewer / review date: Pending. Casey Holt, planned 2026-11-01. G2 through G5 stay shut.

Item ID: PROTOTYPE-16

Question: What must be in the evidence package before the review date?

Answer / assumption: Required before a reviewer is named: this sheet; BMT-HOTEL-BOM-001 Rev C1; DFMEA C1 for DF01 through DF32 (32 data rows); BMT-HOTEL-TEST-MATRIX-001 Rev C1 lines T01 through T20; method cards; the unit-card template; the bench software rig plan; BMT-HOTEL-TEMPLATE-TEST-RESULTS-001 Rev C1 showing Not run or a later measured replacement; a one-line statement that the $60,000.00 allowance is unreleased; and the status of A03. If any item is missing, the answer is not ready. A Casey Holt read is planned for 2026-11-01 and has not been held as of 2026-10-28. That planned read is not a close while any package item is missing.

Explanation: The package list is known and incomplete. The planned 2026-11-01 read has not been held and does not close it.

Result (Y/N/NA): N

Status: Open — package incomplete

BMT-HOTEL-CHECK-SHEET-PROTOTYPE-001 Rev C1; ; BMT-HOTEL-CONCEPT-DRAWING-001 Rev C1; 2026-10-24; planned read 2026-11-01 not held, package not closed; $60,000.00 unreleased

Owner: Jordan Vale

Next action: Assemble the unreleased-allowance package and do not close the package on the planned 2026-11-01 read, which has not been held; target 2027-02-15

Reviewer / review date: Pending. Casey Holt, planned 2026-11-01. The package list is incomplete.

Item ID: PROTOTYPE-17

Question: What user and misuse conditions is the prototype required to represent?

Answer / assumption: The intended user is a small-property manager (PROJECT-01). Eight Grade B interviews and five price choices are on file. No property has agreed to a placement, and Paula Greer is not a signed dealer. The prototype represents an indoor bench, three empty chambers, adult hands, dust as a sensor challenge, and a router-loss case. It does not represent an occupied guest room, a child, a pet as a user, a live mouse, or outdoor weather. Misuse in scope: a 20 N bait pull, a wash attempted with the cassette seated (power must inhibit), and 50 unauthorized pairing attempts. Morgan Hale has not been contacted. No property has agreed to a placement.

Explanation: The intended user is a small-property manager. Eight Grade B interviews are filed, and none is a placement. Children and a live multi-catch are outside this setup.

Result (Y/N/NA): Y

Status: Recorded — user boundary written

BMT-HOTEL-CHECK-SHEET-PROJECT-001 Rev C1 PROJECT-01 and PROJECT-02; 2026-10-24; no property placement

Owner: Jordan Vale

Next action: State the indoor, empty-chamber, adult-hand boundary on the method cards; target 2027-02-15

Reviewer / review date: Pending. Casey Holt, planned 2026-11-01. The user boundary is recorded as intent and is not accepted.

Item ID: PROTOTYPE-18

Question: What would make the prototype effort stop rather than revise?

Answer / assumption: Do not start a Hotel build until Basic T01 and T02 exist and A03 is closed. After a release, stop rather than revise inside the $60,000.00 if the door fails after one redesign, or if the cassette cannot be made safe to wash (power inhibited when unseated) inside the rig slice of $24,000.00 and the test slice of $18,000.00. A stop proposal goes to Alex Meadow. None is declared on 2026-10-24. Do not charge Hotel parts to the Basic $5,000.00 prototype line.

Explanation: One failed door redesign, with no remaining allowance, is a stop proposal to Alex Meadow. No stop is declared, because no build has started.

Result (Y/N/NA): Y

Status: Recorded — stop rule written, not declared

BMT-COMPANY-TEMPLATE-FUNDING-001 Rev C1, Hotel outside the Basic cap; 2026-10-24; no stop declared because no build has started

Owner: Alex Meadow

Next action: Write the one-redesign stop rule for Alex Meadow; declare no stop on 2026-10-24; target 2027-02-15

Reviewer / review date: Pending. Casey Holt, planned 2026-11-01. The stop rule is not a declared stop.

Mouse Hotel — What the Prototype Needs to Prove — supporting detail

Mouse Hotel — Which question is this prototype answering?

Project. Mouse Hotel

Product revision. C1

Sheet revision. 1

Prepared by. Jordan Vale

Date. 2026-10-24

Target market / jurisdiction. U.S. adults; Wisconsin illustrative base

Decision being prepared. Next private feasibility gate

Sheet. What the Prototype Needs to Prove

Lead. Jordan Vale

Item ID. PROTOTYPE-01

Question. Which question is this prototype answering?

Evidence to record. Appearance, usability, fit, mechanism, strength, life, process or customer acceptance; list what it cannot demonstrate.

Answer / assumption. First question is the capture door, not the radio. CTQ01 / R01 / DF01, RPN 210: the door stays latched through 100 dry cycles on each of 10 concept units, then a 5 N outward retention pull (BMT-HOTEL-TEST-MATRIX-001 Rev C1 T01). Mouse Hotel C1 is a three-chamber connected concept, and the door question is still the one this prototype answers first. Electronics, Wi-Fi, and the battery are separate rows and are review pending. No live multi-catch rate, no property installation, no FCC grant, and no order at the $129.00 hold price is demonstrated. BMT-HOTEL-TEMPLATE-TEST-RESULTS-001 Rev C1 records T01 through T20 as Not run. The $60,000.00 Hotel allowance is not authorized.

Result (Y/N/NA). Y

Explanation. The door is the first question. Radio, Wi-Fi, and the battery are later rows and are review pending. DF01 RPN 210 is proposed.

Status. Recorded — first question named, untested

Evidence / exact revision / URL and date. BMT-HOTEL-TEST-MATRIX-001 Rev C1 T01; BMT-HOTEL-DFMEA-001 Rev C1 DF01 RPN 210; BMT-HOTEL-CONCEPT-DRAWING-001 Rev C1; 2026-10-24; BMT-HOTEL-TEMPLATE-TEST-RESULTS-001 Rev C1 Not run; allowance unreleased

Owner. Jordan Vale

Next action. Write the T01 method card for the three-chamber shell; do not order electronics against the unreleased allowance; target 2027-02-15

Reviewer / review date. Pending. Casey Holt, planned 2026-11-01. First question is recorded as C1 intent and is not accepted.

Not-applicable reason. Applicable

Source guidance URLs. BMT-HOTEL-TEST-MATRIX-001 Rev C1; BMT-HOTEL-DFMEA-001 Rev C1; BMT-HOTEL-CONCEPT-DRAWING-001 Rev C1; BMT-HOTEL-TEMPLATE-TEST-RESULTS-001 Rev C1

Mouse Hotel — What is the exact configuration?

Project. Mouse Hotel

Product revision. C1

Sheet revision. 1

Prepared by. Jordan Vale

Date. 2026-10-24

Target market / jurisdiction. U.S. adults; Wisconsin illustrative base

Decision being prepared. Next private feasibility gate

Sheet. What the Prototype Needs to Prove

Lead. Jordan Vale

Item ID. PROTOTYPE-02

Question. What is the exact configuration?

Evidence to record. Model/drawing/BOM revision, materials, deviations from production, build method and sample identifiers.

Answer / assumption. Mouse Hotel C1: three isolated proposed chambers, Wi-Fi and Bluetooth, local and app occupancy alerts. No disease-control claim, no child use, no export launch (PROJECT-02). BMT-HOTEL-BOM-001 Rev C1: HOTEL-01 three-chamber shell, HOTEL-02 entry baffles and latches (qty 3), HOTEL-03 sensor array, HOTEL-04 radio/controller cassette, HOTEL-05 protected battery, HOTEL-06 charger and cable, HOTEL-07 assembly and flashing, HOTEL-08 carton and instructions. Reserved IDs HOTEL-X1-001 through HOTEL-X1-010 for mechanical surrogates and one bench software rig. Nothing is built. BMT-HOTEL-TEMPLATE-COST-SHEET-001 Rev C1 running total is $58.67 against the $129.00 hold price; that total is a worksheet, not a quote. Twenty-four dated bids are on file and none is awarded: Fictional Sample Works (Perry Voss, 2026-09-19, valid through 2026-12-18), Fictional Meadow Prototype Shop (Willa Marsh, 2026-09-23, valid through 2026-11-22), and Fictional Northline Molding (Eden Crowe, 2026-09-30, valid through 2026-12-29), parts HOTEL-01 through HOTEL-08. The C1 bill is 19 rows, assembly HOTEL-C1-ASSY plus HOTEL-01 through HOTEL-16. Labor is HOTEL-07. Tooling is HOTEL-16. A printed shell is allowed only if chamber count, baffle, and vent geometry match C1 and the card says so. A dev-board cassette is not HOTEL-04.

Result (Y/N/NA). Y

Explanation. HOTEL-01 through HOTEL-08 are the quoted subset. The C1 bill runs through HOTEL-16. Nothing is built. The running total is a worksheet, not a quote.

Status. Recorded — configuration listed, none built

Evidence / exact revision / URL and date. BMT-HOTEL-BOM-001 Rev C1, 19 rows, HOTEL-C1-ASSY and HOTEL-01 through HOTEL-16; quoted subset HOTEL-01 through HOTEL-08; BMT-HOTEL-TEMPLATE-COST-SHEET-001 Rev C1 running total $58.67; BMT-HOTEL-CONCEPT-DRAWING-001 Rev C1; 2026-10-24; 24 unawarded bids on file; no purchase order

Owner. Jordan Vale

Next action. Hold ID templates HOTEL-X1-001 through HOTEL-X1-010 and the bench software rig; record the printed-shell and dev-board deviation rule; target 2027-02-15

Reviewer / review date. Pending. Casey Holt, planned 2026-11-01. Configuration matches the C1 bill.

Not-applicable reason. Applicable

Source guidance URLs. BMT-HOTEL-BOM-001 Rev C1; BMT-HOTEL-TEMPLATE-COST-SHEET-001 Rev C1; BMT-HOTEL-CONCEPT-DRAWING-001 Rev C1

Mouse Hotel — How will we judge success before testing?

Project. Mouse Hotel

Product revision. C1

Sheet revision. 1

Prepared by. Jordan Vale

Date. 2026-10-24

Target market / jurisdiction. U.S. adults; Wisconsin illustrative base

Decision being prepared. Next private feasibility gate

Sheet. What the Prototype Needs to Prove

Lead. Jordan Vale

Item ID. PROTOTYPE-03

Question. How will we judge success before testing?

Evidence to record. Requirement ID, method, numerical/observable acceptance criterion, environment, equipment, calibration where needed and planned sample size rationale.

Answer / assumption. Criteria are copied from BMT-HOTEL-TEST-MATRIX-001 Rev C1 and are review pending. T01 CTQ01 DF01 RPN 210: 100 dry cycles and a 5 N pull, n=10. T02 CTQ02 DF02 RPN 252: two independent raised vent paths stay open in a bedding-surrogate trial. T03 CTQ03 DF03 RPN 192: fingers stay 30 mm from the door path; 10 adults, unloaded, no path contact. T04 CTQ04 DF04 RPN 240: shell opens without tools; no visible fluorescent soil after the defined wash, n=10; not a biological claim. T05 CTQ05 DF05 RPN 162: bait insert captive after 20 N, n=10. T06 CTQ06 DF06 RPN 432: occupancy visible without opening; welfare reviewer sets the interval; no live animals before an ethical review. T07 CTQ07 DF07 RPN 280: three-compartment target; a rigid mouse surrogate cannot back-drive the baffle at 2 N. T08 CTQ08 DF08 RPN 360: surrogate detected in each chamber in 100 placements, including a dust challenge; zero false-empty in that screen. T09 CTQ09 DF09 RPN 432: local occupancy indicator works with the network down; the app marks offline within the proposed 5 minutes. T10 CTQ10 DF10 RPN 320: provisioning requires a physical button and a unique identity; an unauthorized client is denied in 50 attempts. T11 CTQ11 DF11 RPN 288: local indication and mechanical capture remain safe after power loss at each update phase. T12 CTQ12 DF12 RPN 320, severity 10: no charging when wet; proposed independent cutoff at 45 C cell surface; a battery specialist is still required. T13 CTQ13 DF13 RPN 315: electronics detach before washing; power is inhibited when the cassette is unseated; no IP rating is claimed. T14 CTQ14 DF14 RPN 280: no precise location; proposed event retention 30 days, with a deletion path. T15 CTQ15 DF15 RPN 360: a candidate module is chosen only after grant, antenna, and host obligations are reviewed; no FCC ID is invented. T16 CTQ16 DF16 RPN 360: capacity is not rated; three isolated chambers need welfare-specialist approval before any crowding claim. Environment is an indoor bench. Counts are a concept screen, sample. T17 through T20 and CTQ17 through CTQ20 are on the same matrix, unapproved, and Not run. DFMEA C1 is DF01 through DF32 (32 data rows). Radio-integration hold is process step P18. Test T15 is not process step P15.

Result (Y/N/NA). N

Explanation. T01 through T20 limits are copied and are review pending. CTQ01 through CTQ16 is a short index. A run before initials would not count.

Status. Open — acceptance lines not initialed

Evidence / exact revision / URL and date. BMT-HOTEL-TEST-MATRIX-001 Rev C1 T01-T20; BMT-HOTEL-CRITICAL-QUALITY-001 Rev C1 CTQ01-CTQ20; BMT-HOTEL-DFMEA-001 Rev C1 DF01-DF32; 2026-10-24; limits review pending

Owner. Jordan Vale

Next action. Copy T01 through T20 acceptance lines onto method cards and mark every limit review pending; target 2027-02-15

Reviewer / review date. Pending. Casey Holt, planned 2026-11-01. Limits are copied and not initialed.

Not-applicable reason. Applicable

Source guidance URLs. BMT-HOTEL-TEST-MATRIX-001 Rev C1; BMT-HOTEL-CRITICAL-QUALITY-001 Rev C1; BMT-HOTEL-DFMEA-001 Rev C1

Mouse Hotel — Is the test safe and representative?

Project. Mouse Hotel

Product revision. C1

Sheet revision. 1

Prepared by. Jordan Vale

Date. 2026-10-24

Target market / jurisdiction. U.S. adults; Wisconsin illustrative base

Decision being prepared. Next private feasibility gate

Sheet. What the Prototype Needs to Prove

Lead. Jordan Vale

Item ID. PROTOTYPE-04

Question. Is the test safe and representative?

Evidence to record. Foreseeable hazards, setup limits, operator competence, exposure safeguards, realistic users/conditions and specialist or lab involvement where needed.

Answer / assumption. Surrogates first. No live-animal protocol is approved. This product has no aircraft, so no outdoor-flight protocol is in scope. The pinch path uses the unloaded 30 mm task (DF03, severity 8). Wash water is not applied with the cassette seated (DF13, severity 9, RPN 315). No wet charging (DF12, severity 10, RPN 320). Jordan Vale does not run destructive battery tests; a battery specialist would, and none is appointed. A false-empty indication is a stop (DF08 RPN 360 and DF09 RPN 432). Children are out of scope. Small-property managers are the intended users on PROJECT-01. Eight Grade B interviews are on file, and none is an observation of a built Hotel. Stop on heat, water at the board, a pinch, a false-empty, or a departed method. Restart of T03, T06, T12, and T16 requires the relevant specialist in writing.

Result (Y/N/NA). N

Explanation. Pinch, a wet cassette, wet charging, and a false-empty are written stops. No battery specialist is appointed, so T12 is not cleared.

Status. Open — safeguards not signed

Evidence / exact revision / URL and date. BMT-HOTEL-DFMEA-001 Rev C1 DF03, DF12 RPN 320 severity 10, DF13 RPN 315, DF09 RPN 432; 2026-10-24; no specialist appointed

Owner. Jordan Vale

Next action. Write stop rules for pinch, wet cassette, 45 C cutoff, and false-empty; appoint no specialist until a consent exists; target 2027-02-15

Reviewer / review date. Pending. Casey Holt, planned 2026-11-01. Safeguards are written and not signed.

Not-applicable reason. No aircraft is in HOTEL-C1. The bench safety question applies.

Source guidance URLs. BMT-HOTEL-DFMEA-001 Rev C1

Mouse Hotel — What happened, including failures?

Project. Mouse Hotel

Product revision. C1

Sheet revision. 1

Prepared by. Jordan Vale

Date. 2026-10-24

Target market / jurisdiction. U.S. adults; Wisconsin illustrative base

Decision being prepared. Next private feasibility gate

Sheet. What the Prototype Needs to Prove

Lead. Jordan Vale

Item ID. PROTOTYPE-05

Question. What happened, including failures?

Evidence to record. Raw measurements, units, photos, observations, anomalies and deviation from method. Separate measured from simulated and predicted performance.

Answer / assumption. No runs. BMT-HOTEL-TEMPLATE-TEST-RESULTS-001 Rev C1 records T01 through T20 as Not run, turn 0. No sensor logs, no pairing logs, no temperature readings, and no photos. Projected residual RPNs are not results. First-pass RPNs DF06 and DF09 are both 432, the highest first-pass scores. Projected residuals DF06-M and DF09-M are 216 and are the top projected lines. The residual RPN total is 3567. The 80% review line is 2853.6. Accepted residual is 0. Do not fill a pass to support a later Hotel release.

Result (Y/N/NA). N

Explanation. T01 through T20 are Not run. First-pass DF06 and DF09 at 432 are not results. Projected DF06-M and DF09-M are 216. The residual total is 3567.

Status. Blocked — no run on file

Evidence / exact revision / URL and date. BMT-HOTEL-TEMPLATE-TEST-RESULTS-001 Rev C1 T01-T20 Not run; 2026-10-24; no raw sheet

Owner. Jordan Vale

Next action. Leave BMT-HOTEL-TEMPLATE-TEST-RESULTS-001 Rev C1 T01 through T20 at Not run; target 2027-02-15

Reviewer / review date. Pending. Casey Holt, planned 2026-11-01. No raw sheet is on file.

Not-applicable reason. Applicable

Source guidance URLs. BMT-HOTEL-TEMPLATE-TEST-RESULTS-001 Rev C1

Mouse Hotel — What can we conclude, and what remains unproven?

Project. Mouse Hotel

Product revision. C1

Sheet revision. 1

Prepared by. Jordan Vale

Date. 2026-10-24

Target market / jurisdiction. U.S. adults; Wisconsin illustrative base

Decision being prepared. Next private feasibility gate

Sheet. What the Prototype Needs to Prove

Lead. Jordan Vale

Item ID. PROTOTYPE-06

Question. What can we conclude, and what remains unproven?

Evidence to record. Verification: meets specified requirements. Validation: serves intended users/use. State sample and prototype limits, owner of failures, required changes and retest before a release claim.

Result (Y/N/NA). N

Explanation. Eight Grade B interviews and five price choices are filed. They are not a property placement and not a prototype pass. No radio grant is on file. G2 through G5 stay shut. The allowance is not released.

Status. Blocked — evidence not established

Owner. Jordan Vale

Next action. Record that no performance, welfare, RF, or production conclusion is available; target 2027-02-15

Reviewer / review date. Pending. Casey Holt, planned 2026-11-01. No performance conclusion is available.

Not-applicable reason. Applicable

Source guidance URLs. BMT-HOTEL-CHECK-SHEET-PROJECT-001 Rev C1

Mouse Hotel — Which characteristics must this prototype prove, and which are deferred?

Project. Mouse Hotel

Product revision. C1

Sheet revision. 1

Prepared by. Jordan Vale

Date. 2026-10-24

Target market / jurisdiction. U.S. adults; Wisconsin illustrative base

Decision being prepared. Next private feasibility gate

Sheet. What the Prototype Needs to Prove

Lead. Jordan Vale

Item ID. PROTOTYPE-07

Question. Which characteristics must this prototype prove, and which are deferred?

Evidence to record. List each CTQ, requirement, DFMEA ID and test ID in this build; state the deferred characteristics and the gate they move to.

Result (Y/N/NA). Y

Explanation. CTQ01 through CTQ20 stay on the plan. The sixteen-line index is short. The build waits on Basic evidence and on open action A03.

Status. Recorded — scope list written, build deferred

Owner. Jordan Vale

Next action. Keep CTQ01 through CTQ20 on the plan and keep the build behind Basic evidence and A03; target 2027-02-15

Reviewer / review date. Pending. Casey Holt, planned 2026-11-01. The in-scope list is recorded as intent and is not accepted.

Not-applicable reason. Applicable

Source guidance URLs. BMT-HOTEL-CRITICAL-QUALITY-001 Rev C1; BMT-COMPANY-TEMPLATE-ACTION-LOG-001 Rev C1

Mouse Hotel — What is the sample size rationale and how is each unit identified?

Project. Mouse Hotel

Product revision. C1

Sheet revision. 1

Prepared by. Jordan Vale

Date. 2026-10-24

Target market / jurisdiction. U.S. adults; Wisconsin illustrative base

Decision being prepared. Next private feasibility gate

Sheet. What the Prototype Needs to Prove

Lead. Jordan Vale

Item ID. PROTOTYPE-08

Question. What is the sample size rationale and how is each unit identified?

Evidence to record. Unit IDs, count, why that count is enough for this gate, reuse order across tests, and the rule for a damaged unit.

Answer / assumption. n=10 mechanical surrogates, HOTEL-X1-001 through HOTEL-X1-010, for the door, vent, release, wash, bait, window, and baffle screens. That count matches CTQ01 and is not a reliability demonstration. Sensor, alert, provisioning, firmware, and account checks use the bench software rig plus the surrogates where the matrix requires a chamber. T08 is 100 placements, not 100 extra builds. T10 is 50 unauthorized attempts on the test build. T12 is a specialist setup, not a 10-unit destructive sample. A damaged unit is retired under a new gap note. No ID is issued until a consent to build exists. No consent exists.

Result (Y/N/NA). N

Explanation. n=10 is the mechanical screen. HOTEL-X1-001 through HOTEL-X1-010 are not issued. The bench software rig is not a serial.

Status. Open — serials reserved, none issued

Evidence / exact revision / URL and date. BMT-HOTEL-TEST-MATRIX-001 Rev C1 sample notes for T01, T08, and T10; 2026-10-24; IDs not issued

Owner. Jordan Vale

Next action. Prepare the sample-size note for n=10, 100 placements, and 50 pairing attempts; issue no hardware ID; target 2027-02-15

Reviewer / review date. Pending. Casey Holt, planned 2026-11-01. Serials are reserved and not issued.

Not-applicable reason. Applicable

Source guidance URLs. BMT-HOTEL-TEST-MATRIX-001 Rev C1

Mouse Hotel — What build method differs from the intended production part?

Project. Mouse Hotel

Product revision. C1

Sheet revision. 1

Prepared by. Jordan Vale

Date. 2026-10-24

Target market / jurisdiction. U.S. adults; Wisconsin illustrative base

Decision being prepared. Next private feasibility gate

Sheet. What the Prototype Needs to Prove

Lead. Jordan Vale

Item ID. PROTOTYPE-09

Question. What build method differs from the intended production part?

Evidence to record. Production-intent process and material versus the prototype process; which dimensions must still match C1; which claims a non-production build cannot support.

Answer / assumption. Production intent is a molded clear-lid shell (HOTEL-01, BMT-HOTEL-TEMPLATE-COST-SHEET-001 Rev C1 line $24.67 after low-volume amortization versus the $8.00 piece price) and a candidate Wi-Fi/BLE cassette (HOTEL-04). The prototype may use a printed three-chamber shell and a dev board. Chamber count, baffle back-drive geometry, vent locations, and the unseated-cassette interlock must match C1. A dev board cannot support an FCC host grant, the $58.67 BMT-HOTEL-TEMPLATE-COST-SHEET-001 Rev C1 total, or a claim that the board is HOTEL-04. The battery is a candidate protected pack (HOTEL-05). If the bench pack differs, the unit card says so. Fictional Sample Works, Fictional Meadow Prototype Shop, and Fictional Northline Molding have 24 dated bids on file. None is awarded and no purchase order exists.

Result (Y/N/NA). Y

Explanation. A printed shell and a dev board cannot support a host grant or the worksheet total. Chamber count and the unseated-cassette interlock must still match C1.

Status. Recorded — deviation rule written

Evidence / exact revision / URL and date. BMT-HOTEL-TEMPLATE-COST-SHEET-001 Rev C1 HOTEL-01 unit $24.67 and running total $58.67; BMT-HOTEL-BOM-001 Rev C1 piece prices; 2026-10-24

Owner. Jordan Vale

Next action. Separate HOTEL-04 from any dev board on the unit-card template; target 2027-02-15

Reviewer / review date. Pending. Casey Holt, planned 2026-11-01. The deviation rule is recorded as intent and is not accepted.

Not-applicable reason. Applicable

Source guidance URLs. BMT-HOTEL-TEMPLATE-COST-SHEET-001 Rev C1; BMT-HOTEL-BOM-001 Rev C1

Mouse Hotel — What equipment and calibration are required before a run counts?

Project. Mouse Hotel

Product revision. C1

Sheet revision. 1

Prepared by. Jordan Vale

Date. 2026-10-24

Target market / jurisdiction. U.S. adults; Wisconsin illustrative base

Decision being prepared. Next private feasibility gate

Sheet. What the Prototype Needs to Prove

Lead. Jordan Vale

Item ID. PROTOTYPE-10

Question. What equipment and calibration are required before a run counts?

Evidence to record. Instrument, check method, what voids a run, and whether the cost sits inside the feasibility cap.

Answer / assumption. A force gauge for the 5 N pull, the 20 N bait pull, and the 2 N baffle back-drive, with the check recorded that day. An uncalibrated gauge voids the run. Video for T03. Fluorescent soil for T04. A bench router and a phone for T09 and T10, including an injected network-loss case. A power-interrupt fixture for T11. A temperature method for the proposed 45 C cutoff on T12, owned by a battery specialist who is not appointed. No IP-rating chamber, because no IP rating is claimed. No FCC lab is inside this allowance. The rig slice on the BMT-HOTEL-FUNDING-WORKSHEET-001 Rev C1 is $24,000.00. It is not released.

Result (Y/N/NA). N

Explanation. An uncalibrated gauge voids the run. The rig slice is unreleased, so no router, video setup, or temperature method is on the bench.

Status. Open — instruments not released

Evidence / exact revision / URL and date. BMT-HOTEL-TEST-MATRIX-001 Rev C1 equipment lines; BMT-HOTEL-FUNDING-WORKSHEET-001 Rev C1 rig slice $24,000.00 unreleased; 2026-10-24

Owner. Jordan Vale

Next action. List the gauge, video, router-loss fixture, and specialist temperature method inside the unreleased $24,000.00 rig slice; target 2027-02-15

Reviewer / review date. Pending. Casey Holt, planned 2026-11-01. No instrument spend is released.

Not-applicable reason. Applicable

Source guidance URLs. BMT-HOTEL-TEST-MATRIX-001 Rev C1; BMT-HOTEL-FUNDING-WORKSHEET-001 Rev C1

Mouse Hotel — What cost is authorized for this prototype, and what is excluded?

Project. Mouse Hotel

Product revision. C1

Sheet revision. 1

Prepared by. Jordan Vale

Date. 2026-10-24

Target market / jurisdiction. U.S. adults; Wisconsin illustrative base

Decision being prepared. Next private feasibility gate

Sheet. What the Prototype Needs to Prove

Lead. Jordan Vale

Item ID. PROTOTYPE-11

Question. What cost is authorized for this prototype, and what is excluded?

Evidence to record. Cap amount, named budget owner, included spend, excluded spend, candidate cost-sheet total, target price, and confirmation that no supplier is on order.

Result (Y/N/NA). N

Status. Blocked — allowance unfunded

Owner. Alex Meadow

Next action. Leave the $60,000.00 allowance unreleased; do not ask Alex Meadow for Hotel consent before Basic evidence and A03; target 2027-02-15

Reviewer / review date. Pending. Casey Holt, planned 2026-11-01. No allowance is consented.

Not-applicable reason. Applicable

Source guidance URLs. BMT-COMPANY-TEMPLATE-FUNDING-001 Rev C1

Mouse Hotel — What are the stop rules, and who may restart?

Project. Mouse Hotel

Product revision. C1

Sheet revision. 1

Prepared by. Jordan Vale

Date. 2026-10-24

Target market / jurisdiction. U.S. adults; Wisconsin illustrative base

Decision being prepared. Next private feasibility gate

Sheet. What the Prototype Needs to Prove

Lead. Jordan Vale

Item ID. PROTOTYPE-12

Question. What are the stop rules, and who may restart?

Evidence to record. Stop conditions, who stops, who may restart, and the subjects or environments that are not allowed.

Answer / assumption. Jordan Vale stops the bench if a hand enters the door path, a baffle back-drives at the 2 N check, the cassette is powered while unseated or wet, cell-surface temperature reaches the proposed 45 C cutoff, a false-empty is indicated, or the method changes. A battery specialist would authorize restart of T12. A welfare specialist would authorize restart of T06 and T16. Neither specialist is appointed. No live animal. No child subject. Crowding is not represented by empty volume. Writing this plan does not close A03.

Result (Y/N/NA). N

Explanation. Jordan Vale can stop a bench run. Restart of T03, T06, T12, and T16 needs a specialist who is not appointed.

Status. Open — stop card not attached

Evidence / exact revision / URL and date. BMT-HOTEL-DFMEA-001 Rev C1 DF12, DF13, DF08, DF16; action A03 open; 2026-10-24

Owner. Jordan Vale

Next action. Attach specialist restart rules to T03, T06, T12, and T16; target 2027-02-15

Reviewer / review date. Pending. Casey Holt, planned 2026-11-01. The stop card is not on the method cards.

Not-applicable reason. Applicable

Source guidance URLs. BMT-HOTEL-DFMEA-001 Rev C1

Mouse Hotel — How will measured, simulated, and predicted results be separated?

Project. Mouse Hotel

Product revision. C1

Sheet revision. 1

Prepared by. Jordan Vale

Date. 2026-10-24

Target market / jurisdiction. U.S. adults; Wisconsin illustrative base

Decision being prepared. Next private feasibility gate

Sheet. What the Prototype Needs to Prove

Lead. Jordan Vale

Item ID. PROTOTYPE-13

Question. How will measured, simulated, and predicted results be separated?

Evidence to record. Definition of measured, simulated, and predicted; where each is filed; which file stays Not run until a measurement exists.

Answer / assumption. Measured means a gauge value, a count, a photo, a sensor log, or a pairing log on HOTEL-X1-001 through HOTEL-X1-010 or on the bench software rig. Simulated means an injected fault on the bench software rig and is labeled simulated. It does not by itself close a mechanical CTQ. Predicted means the DFMEA projected RPN, including the projected residuals for DF06-M and DF09-M at 216, and is not evidence. The residual total is 3567. BMT-HOTEL-TEMPLATE-TEST-RESULTS-001 Rev C1 stays Not run for T01 through T20 until a measured row exists. An app mock is not a T09 result.

Result (Y/N/NA). Y

Explanation. A bench-software-rig log is simulated until a measured row exists. A projected RPN is not evidence.

Status. Recorded — evidence classes defined

Evidence / exact revision / URL and date. BMT-HOTEL-TEMPLATE-TEST-RESULTS-001 Rev C1; BMT-HOTEL-DFMEA-001 Rev C1 projected RPN column; 2026-10-24; no measured row

Owner. Jordan Vale

Next action. Label future output of the bench software rig as simulated until a measured row exists; target 2027-02-15

Reviewer / review date. Pending. Casey Holt, planned 2026-11-01. Measured, simulated, and predicted are separated.

Not-applicable reason. Applicable

Source guidance URLs. BMT-HOTEL-TEMPLATE-TEST-RESULTS-001 Rev C1; BMT-HOTEL-DFMEA-001 Rev C1

Mouse Hotel — Who owns a failed proof, and what retest is required?

Project. Mouse Hotel

Product revision. C1

Sheet revision. 1

Prepared by. Jordan Vale

Date. 2026-10-24

Target market / jurisdiction. U.S. adults; Wisconsin illustrative base

Decision being prepared. Next private feasibility gate

Sheet. What the Prototype Needs to Prove

Lead. Jordan Vale

Item ID. PROTOTYPE-14

Question. Who owns a failed proof, and what retest is required?

Evidence to record. Named owner of a fail, the redesign action tied to the DFMEA, the retest sample, and who may not close the fail.

Answer / assumption. Jordan Vale owns a failed Hotel characteristic. Alex Meadow does not close it by releasing funds. A fail repeats the full acceptance count for that test ID after the DFMEA action or a written alternative. A T12 fail blocks any powered prototype. A T15 fail blocks any radio claim and is not solved by inventing an FCC ID. A T16 fail blocks any sentence that rates capacity at three mice. Retest units are reidentified if the hardware changed. No retest is queued, because no first test has been run.

Result (Y/N/NA). Y

Explanation. Jordan Vale owns a failed characteristic. Alex Meadow does not close it by releasing more of the allowance.

Status. Recorded — fail owner named

Evidence / exact revision / URL and date. BMT-HOTEL-DFMEA-001 Rev C1 recommended actions, owner Jordan Vale; 2026-10-24; not implemented or tested

Owner. Jordan Vale

Next action. Name Jordan Vale on the fail-and-retest line for T01 through T20; target 2027-02-15

Reviewer / review date. Pending. Casey Holt, planned 2026-11-01. The fail owner is named.

Not-applicable reason. Applicable

Source guidance URLs. BMT-HOTEL-DFMEA-001 Rev C1

Mouse Hotel — Which gate can this packet support, and which gates stay shut?

Project. Mouse Hotel

Product revision. C1

Sheet revision. 1

Prepared by. Jordan Vale

Date. 2026-10-24

Target market / jurisdiction. U.S. adults; Wisconsin illustrative base

Decision being prepared. Next private feasibility gate

Sheet. What the Prototype Needs to Prove

Lead. Jordan Vale

Item ID. PROTOTYPE-15

Question. Which gate can this packet support, and which gates stay shut?

Evidence to record. Gate this packet can support, gates that stay shut, and the decision this sheet does not authorize.

Answer / assumption. On 2026-10-24 this packet does not open a gate. If the allowance were later released, a complete measured set could support a private G1 mechanism recommendation only. G2 user/welfare needs measured T03, T06, T08, T09, and T16, plus a welfare interval that is not set. G3 freeze, G4 pilot, and G5 launch stay shut. The date on this sheet is 2027-02-15, which is after A03 (2026-12-15) and after the Basic latch review. This sheet does not pull Hotel work ahead of Basic. The $20,000.00 company cash floor is unchanged by a Hotel plan that has no spend.

Result (Y/N/NA). Y

Explanation. If the allowance were later released, the packet could support a private G1 recommendation only. 2027-02-15 is not a spend start.

Status. Recorded — later gates stay shut

Evidence / exact revision / URL and date. BMT-HOTEL-CHECK-SHEET-PROJECT-001 Rev C1 PROJECT-06; A03 due 2026-12-15; sheet target 2027-02-15; allowance unreleased

Owner. Jordan Vale

Next action. Keep G2 through G5 shut; do not treat 2027-02-15 as a start of Hotel spend; target 2027-02-15

Reviewer / review date. Pending. Casey Holt, planned 2026-11-01. G2 through G5 stay shut.

Not-applicable reason. Applicable

Source guidance URLs. BMT-HOTEL-CHECK-SHEET-PROJECT-001 Rev C1

Mouse Hotel — What must be in the evidence package before the review date?

Project. Mouse Hotel

Product revision. C1

Sheet revision. 1

Prepared by. Jordan Vale

Date. 2026-10-24

Target market / jurisdiction. U.S. adults; Wisconsin illustrative base

Decision being prepared. Next private feasibility gate

Sheet. What the Prototype Needs to Prove

Lead. Jordan Vale

Item ID. PROTOTYPE-16

Question. What must be in the evidence package before the review date?

Evidence to record. Required files, revision, and the rule when one file is missing. Reviewer name stays blank until the package exists.

Answer / assumption. Required before a reviewer is named: this sheet; BMT-HOTEL-BOM-001 Rev C1; DFMEA C1 for DF01 through DF32 (32 data rows); BMT-HOTEL-TEST-MATRIX-001 Rev C1 lines T01 through T20; method cards; the unit-card template; the bench software rig plan; BMT-HOTEL-TEMPLATE-TEST-RESULTS-001 Rev C1 showing Not run or a later measured replacement; a one-line statement that the $60,000.00 allowance is unreleased; and the status of A03. If any item is missing, the answer is not ready. A Casey Holt read is planned for 2026-11-01 and has not been held as of 2026-10-28. That planned read is not a close while any package item is missing.

Result (Y/N/NA). N

Explanation. The package list is known and incomplete. The planned 2026-11-01 read has not been held and does not close it.

Status. Open — package incomplete

Evidence / exact revision / URL and date. BMT-HOTEL-CHECK-SHEET-PROTOTYPE-001 Rev C1; ; BMT-HOTEL-CONCEPT-DRAWING-001 Rev C1; 2026-10-24; planned read 2026-11-01 not held, package not closed; $60,000.00 unreleased

Owner. Jordan Vale

Next action. Assemble the unreleased-allowance package and do not close the package on the planned 2026-11-01 read, which has not been held; target 2027-02-15

Reviewer / review date. Pending. Casey Holt, planned 2026-11-01. The package list is incomplete.

Not-applicable reason. Applicable

Source guidance URLs. BMT-HOTEL-CHECK-SHEET-PROTOTYPE-001 Rev C1; BMT-HOTEL-CONCEPT-DRAWING-001 Rev C1

Mouse Hotel — What user and misuse conditions is the prototype required to represent?

Project. Mouse Hotel

Product revision. C1

Sheet revision. 1

Prepared by. Jordan Vale

Date. 2026-10-24

Target market / jurisdiction. U.S. adults; Wisconsin illustrative base

Decision being prepared. Next private feasibility gate

Sheet. What the Prototype Needs to Prove

Lead. Jordan Vale

Item ID. PROTOTYPE-17

Question. What user and misuse conditions is the prototype required to represent?

Evidence to record. User, place, and misuse the build must represent, and the uses named out of scope in the project sheet.

Answer / assumption. The intended user is a small-property manager (PROJECT-01). Eight Grade B interviews and five price choices are on file. No property has agreed to a placement, and Paula Greer is not a signed dealer. The prototype represents an indoor bench, three empty chambers, adult hands, dust as a sensor challenge, and a router-loss case. It does not represent an occupied guest room, a child, a pet as a user, a live mouse, or outdoor weather. Misuse in scope: a 20 N bait pull, a wash attempted with the cassette seated (power must inhibit), and 50 unauthorized pairing attempts. Morgan Hale has not been contacted. No property has agreed to a placement.

Result (Y/N/NA). Y

Explanation. The intended user is a small-property manager. Eight Grade B interviews are filed, and none is a placement. Children and a live multi-catch are outside this setup.

Status. Recorded — user boundary written

Evidence / exact revision / URL and date. BMT-HOTEL-CHECK-SHEET-PROJECT-001 Rev C1 PROJECT-01 and PROJECT-02; 2026-10-24; no property placement

Owner. Jordan Vale

Next action. State the indoor, empty-chamber, adult-hand boundary on the method cards; target 2027-02-15

Reviewer / review date. Pending. Casey Holt, planned 2026-11-01. The user boundary is recorded as intent and is not accepted.

Not-applicable reason. Applicable

Source guidance URLs. BMT-HOTEL-CHECK-SHEET-PROJECT-001 Rev C1

Mouse Hotel — What would make the prototype effort stop rather than revise?

Project. Mouse Hotel

Product revision. C1

Sheet revision. 1

Prepared by. Jordan Vale

Date. 2026-10-24

Target market / jurisdiction. U.S. adults; Wisconsin illustrative base

Decision being prepared. Next private feasibility gate

Sheet. What the Prototype Needs to Prove

Lead. Jordan Vale

Item ID. PROTOTYPE-18

Question. What would make the prototype effort stop rather than revise?

Evidence to record. Conditions that stop the allowance rather than fund another revision, who receives the stop proposal, and the statement that no stop is declared on the preparation date.

Answer / assumption. Do not start a Hotel build until Basic T01 and T02 exist and A03 is closed. After a release, stop rather than revise inside the $60,000.00 if the door fails after one redesign, or if the cassette cannot be made safe to wash (power inhibited when unseated) inside the rig slice of $24,000.00 and the test slice of $18,000.00. A stop proposal goes to Alex Meadow. None is declared on 2026-10-24. Do not charge Hotel parts to the Basic $5,000.00 prototype line.

Result (Y/N/NA). Y

Explanation. One failed door redesign, with no remaining allowance, is a stop proposal to Alex Meadow. No stop is declared, because no build has started.

Status. Recorded — stop rule written, not declared

Evidence / exact revision / URL and date. BMT-COMPANY-TEMPLATE-FUNDING-001 Rev C1, Hotel outside the Basic cap; 2026-10-24; no stop declared because no build has started

Owner. Alex Meadow

Next action. Write the one-redesign stop rule for Alex Meadow; declare no stop on 2026-10-24; target 2027-02-15

Reviewer / review date. Pending. Casey Holt, planned 2026-11-01. The stop rule is not a declared stop.

Not-applicable reason. Applicable

Source guidance URLs. BMT-COMPANY-TEMPLATE-FUNDING-001 Rev C1

Document administration

Scope. HOTEL-C1 three-chamber shell and the electronics cassette. Tests T01 through T16 on BMT-HOTEL-TEST-MATRIX-001 are Not run. Bridge serials HOTEL-X1-001 through HOTEL-X1-010, none built. The $60,000.00 allowance is unfunded and stops before the $30,000.00 tool. Checklist BMT-HOTEL-CHECK-SHEET-PROTOTYPE-001, Rev C1.

Preparation: Jordan Vale, scenario attribution, 2026-10-24. Signature: unsigned. Review: pending; no reviewer signature or date. Approval: withheld; no approver signature or date.

Prepared byDate
Reviewed byDate
Approved byDate