THE BETTER MOUSE TRAP CO. · COMPLETED METHOD RECORD
SIPOC and turtle — controlled prototype verification
Scope: SIPOC and turtle — controlled prototype verification. Read the observations and decisions below within their stated conditions.
SIPOC · start approved D1 requirement, end signed internal decision
| Supplier | Input | Process | Output | Customer |
|---|---|---|---|---|
| Sam / Basic | D1 latch drawing, traceable unit | Kit → assemble → gauge → cycle → review | Gap and retention records, 0/1000 rebounds | Ira → Alex pilot gate |
| Jordan / Hotel | D1 firmware + trace manifest | Load → simulate → fault → reset → review | 0/1000 omissions; 100/100 empty resets | Ira → Robin/Alex |
| Jordan / Drone | Isolated rig + inhibit drawing | Witness isolation → inject → log → review | 30/30 inhibited loss cases | Ira → Alex no-flight gate |
Turtle · center: execute and record D1 verification
| Leg | Completed description |
|---|---|
| With what | Checked indicator 0.01 mm; force gauge 0.1 N; replay harness D1; isolated release fixture |
| With whom | Sam mechanism; Jordan code; Ira independent check; Robin scope; Alex decision |
| How | Approved D1 criteria; serial log; no run without isolation check; stop on first unsafe event |
| Measures | 1000 confirmation opportunities per critical function; 80/80 checker judgements; 4/4 current stations |
| Leg | Completed description |
|---|---|
| Inputs / outputs | Approved criteria and traceable units → measured results and signed bounded decisions |
| Approval | Alex signed June 25; June 30 follow-up complete; no public release |
Record reviewed and signed: Alex Meadow, 2027-06-30. Technical review: Sam Reed / Jordan Vale; independent check: Ira Bell. Disposition: use for the stated internal scope only.